Steel Erection a. Permanent floors are installed as the erection of structural members progresses, and no more than 8 stories exist above a permanent floor
AutoNDA by SimpleDocs
Steel Erection. An employee assigned to setting of columns, beams, girders, and trusses in the general structural erection and maintaining of steel in bridges, buildings, tanks, and other structures; also in the performance of related bridge and building iron work, such as riveting and rivet heating, will constitute a steel xxxxxxxxx.
Steel Erection. Steel Erection operations shall be performed in compliance with the Occupational Safety and Health Administration Office that has jurisdiction in the state where the Steel Erection operations are being performed. • Additionally, fall protection systems and procedures that are applicable to Steel Erection, including roof decking, shall be in place and utilized when persons are working at heights of 6 feet or greater above a lower level.

Related to Steel Erection

  • FABRICATION Making up data or results and recording or reporting them.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Workload Management 11.1 The parties to this Agreement acknowledge that employees and management have a responsibility to maintain a balanced workload and recognise the adverse affects that excessive workloads may have on employee/s and the quality of resident/client care.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Supervisors Working (a) The work of Supervisors will not include assignment to work normally performed by employees of the bargaining unit except for training or demonstration. “Training or demonstration” shall not be used as a subterfuge for the performing of any bargaining unit work. Any claimed abuses will be referred to the Grievance Procedure. Where possible, the shop xxxxxxx will be notified. Supervisors will not perform bargaining unit work until after all rea- sonable efforts have been exhausted to have the work covered.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Virus Management Transfer Agent shall maintain a malware protection program designed to deter malware infections, detect the presence of malware within the Transfer Agent environment.

  • Utility Services Company agrees to pay the full cost and expense associated with its use of all utilities, including but not limited to water, sanitary sewer, electric, storm drainage, and telecommunication services.

  • Network Maintenance and Management 36.1 The Parties will work cooperatively to implement this Agreement. The Parties will exchange appropriate information (for example, maintenance contact numbers, network information, information required to comply with law enforcement and other security agencies of the Government, escalation processes, etc.) to achieve this desired result.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

Time is Money Join Law Insider Premium to draft better contracts faster.