Stair Sample Clauses

Stair. Provide handrail and brackets to comply with building code. 2nd Floor Hallway: Provide light fixture globe. Bathroom: Replace sealant at bathtub/shower. Replace damaged ceramic tile. Replace bathtub. Replace tub/shower faucet. Bedroom 1: Replace window and screen. Replace HVAC grille. Bedroom 2: Replace window and screen. Apartment 235– 2 Bedroom/ 1 Bath Apartment not inspected. Apartment 236– 2 Bedroom/ 1 Bath Apartment not inspected. Apartment 237– 2 Bedroom/ 1 Bath Entire Unit: Replace carpet. Paint entire unit. Replace apt. entry door. Replace apt. entry door frame. Replace apt. entry door hardware. Set up deadbolt as “Master” key system. Replace apt. entry door weather-stripping. Replace apt. entry door peephole. Replace apt. entry door threshold. Living Room: Provide a screen at sliding door. Kitchen: Replace wall cabinets. Replace base cabinets. Replace countertops. Replace sealant at countertop and cabinets. Repair pantry door. Repair pantry door hardware. Stair: Repair handrail brackets. Provide handrail and brackets to comply with building code. Bathroom: Repair GFCI outlet. Replace sealant at bathtub/shower. Replace damaged ceramic tile. Replace bathtub. Replace tub/shower faucet. Bedroom 1: Replace window and screen. Bedroom 2: Replace window and screen. Apartment 238– 3 Bedroom/ 1 ½ Bath Apartment not inspected. Apartment 239– 3 Bedroom/ 1 ½ Bath Apartment not inspected. Apartment 240– 2 Bedroom/ 1 Bath Apartment not inspected. Apartment 241– 2 Bedroom/ 1 Bath Entire Unit: Replace carpet. Paint entire unit. Replace apt. entry door deadbolt hardware. Set up as “Master” key system. Living Room: Replace sliding door and include an anti-entry bar. Provide a screen at sliding door. Kitchen: Replace pantry door hardware. Provide GFCI outlets. Stair: Provide handrail and brackets to comply with building code. Bathroom: Replace sealant at bathtub/shower. Bedroom 1: Replace entry door hardware. Replace window and screen. Replace HVAC grille. Bedroom 2: Replace window and screen. Replace HVAC grille. Apartment 242– 2 Bedroom/ 1 Bath Apartment not inspected. Apartment 243– 2 Bedroom/ 1 Bath Entire Unit: Replace carpet. Replace VCT Paint entire unit. Replace apt. entry door deadbolt hardware. Set up as “Master” key system. Repair smoke detector. Living Room: Replace sliding door and include an anti-entry bar. Provide a screen at sliding door. Dining Room: Replace ceiling fan. Kitchen: Replace wall cabinets. Replace base cabinets. Replace countertops. Repl...
AutoNDA by SimpleDocs
Stair. One set of monumental stairs shall be provided at the front entrance of building
Stair. PRESSURIZATION Stairway pressurization system shall include a supply fan and relief air damper for each stairway.
Stair. PAS. ELEV. 40'-6" 54'-0" UP XX XXXXX MECH MECH. CORRIDOR LINE OF OVERHANG ABOVE OPEN DECK & POOL AREA: 4,962 SF COVERED DECK AREA: 2,982 SF OPEN DECK POOL 68'-0" POOL GUTTER 81'-4" 135'-4" 20'-0" 216'-8" 1Scale 1/16"=1'-0" FLOOR PLAN - 9TH - POOL DECK A4 36'-8" 43'-4" 80'-0" PROJECT NAME VINELAND RD HOTEL OPTION 3 CLIENT NAME PROJECT NO. 15-0652 DATE 5-31-2017 DRAWN GS CHECKED RELEASE
Stair. PAS. ELEV. DN MECH. STAIR MECH MECH. CORRIDOR LINE OF OVERHANG ABOVE MEETING ROOM 3 AREA: 1,501 MEETING ROOM 4 AREA: 1,489 POOL DECK BELOW POOL BELOW POOL DECK BELOW POOL GUTTER 81'-8" 216'-8" 1Scale 1/16"=1'-0" FLOOR PLAN - 11TH LEVEL-MEETING ROOMS A6 12'-0" 12'-0" 4'-0" 0000 Xxxxxxxx Xxx. Xxxxxxx, XX 00000 P (000) 000-0000 F (000) 000-0000 Florida Corporate Certificate #AA C000526 EXHIBIT A PROJECT INFORMATION FLOOR LEVEL FLOOR HT. GSF (CONDITIONED SPACE) UNIT QT. 1 ST + 0'-0" 17,019 0 2 ND + 18'-8" 17,333 00 0 XX + 00'-0" 00,000 00 0 XX + 37'-4" 17,333 00 0 XX + 00'-0" 00,000 00 0 XX + 56'-0" 17,333 00 0 XX + 00'-0" 00,000 00 0 XX + 74'-8" 17,333 00 0 XX +00'-0" 00,000 0 00 XX +94'-0" 12,383 0 11 TH +106'-0" 12,383 0 T.O. ROOF DECK +118'-0" - - T.O. PARAPET +122'-0" - - TOTAL 175,499 174 9'-4" 9'-4" XXXXXXXXX XXXXX XXXXX XXXX (XX) XXXX (XXX) 0 XX OPEN POOL DECK / POOL 4,962 COVERED POOL DECK / BAR 2,982 RECREATION CENTER 1,485 FITNESS CENTER 1,980 10 TH BREAKFAST / DINING 1 3,049 BREAKFAST / DINING 2 2,970 11 TH MEETING ROOM 1 2,124 MEETING ROOM 2 1,461 MEETING ROOM 3 1,501 MEETING ROOM 4 1,489 TOTAL 24,003 RELEASE 7-14-2017 - CITY REVIEW PROJECT NO. 15-0652 DATE 5-31-2017 DRAWN GS CHECKED ELEV. OVERRUN T.O. PARAPET +122'-0" +118'-0" MEETING ROOMS BEYOND MEETING ROOMS 11th +106'-0" BKFST / DINNING BEYOND BKFST / DINNING 10th +94'-0" BAR AND COVERED DECK BEYOND POOL DECK FITNESS 9th +84'-0" UNIT 8th +74'-8" UNIT UNIT 7th +65'-4" UNIT UNIT 6th +56'-0" UNIT UNIT 5th +46'-8" UNIT UNIT 4th +37'-4" UNIT UNIT 3rd +28'-0" UNIT UNIT 2nd +18'-8" PORTE COCHERE RECEPTION SUNDRY 1st 0'-0" PROJECT NAME VINELAND RD HOTEL OPTION 3 SHEET TITLE BUILDING SECTION CLIENT NAME 14'-0" 18'-8" 9'-4" 9'-4" 9'-4" 9'-4" 9'-4" 10'-0" 118'-0" COPYRIGHT C - All reports, plans, specifications, computer files, field data, notes and other documents are instruments of service prepared by: Cuhaci & Xxxxxxxx, (C & P) as instruments of service remain the property of C & P. C & P shall retain all common law, statutory and other reserved rights, including the copyright thereto. Any use or reproduction of this document without written permission from C & P is a violation of Federal copyright laws. CONCEPTS FOR MEDIATION PURPOSES ONLY 1 BUILDING SECTION Scale 1/16"=1'-0"

Related to Stair

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Elevators Landlord shall provide passenger elevator service during normal business hours to Tenant in common with Landlord and all other tenants. Landlord shall provide limited passenger service at other times, except in case of an emergency.

  • Sidewalks entrances, passages, elevators, vestibules, stairways, corridors, halls, lobby and any other part of the Building shall not be obstructed or encumbered by any Tenant or used for any purpose other than ingress or egress to and from each tenant’s premises. Landlord shall have the right to control and operate the common portions of the Building and exterior facilities furnished for common use of the tenants (such as the eating, smoking, and parking areas) in such a manner as Landlord deems appropriate.

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

Time is Money Join Law Insider Premium to draft better contracts faster.