Site Utilities. The CM will provide and maintain site utilities as specified in Appendix C. The CM will be compensated for costs to provide and maintain site utilities as reimbursable expense as listed in Appendix A. The budget for the site utilities should be established and added to the Appendix A no later than the 50% Construction Document Design Phase.
AutoNDA by SimpleDocs
Site Utilities. Contractor shall use only those electrical and water sources designated by WCI for the site. Contractor shall not use electricity or water from adjacent property not owned by WCI.
Site Utilities. 2.3.1 Sanitary system for entire shopping center shall provide for unusual conditions caused by chemical detergents, grease etc.
Site Utilities. 1. All required utilities shall be extended underground to the building with adequate capabilities to meet the initial and expansion requirements.
Site Utilities. The site will operate diesel powered generators to provide the electrical power needed support the planned work activities. Power will be for offices, core logging activities, lighting, portable ablution facilities, yard lighting, etc. Potable and process water will be brought to site. Designated waste disposal bins will be setup on the site for the collection of all garbage generated during the work program. The garbage bins will be removed from site and taken to a licensed disposal facility located at the nearest town (Dryden or Ignace).
Site Utilities. Furnish and install (2) 5” PVC empty conduits from “JT” line shown on drawing to building service. Distance from “JT” to Building A (95’). SEI will supply and install (1) PG&E type concrete pull box to intercept “JT”. Supply PG&E rated transformer pad that will be located in direct line within 10’ of the main switchboard. From the PG&E transformer location Building A will receive 4000 amp aluminum outdoor bussing to connect utility power to the main switchboard. · SEI will supply and install (2) 4” PVC schedule 40 conduits from “JT’ line shown on drawing to each building. Building A (120’). SEI will supply and install (1) AT&T type concrete pull box to intercept “JT”. · Supply 40 amp 3 phase feeder to diesel Fire Pump Equipment located per A1 .1 Site Plan v2.4 rev1drawing. Building Power: · Building A will receive a 4000 amp indoor 277/480 volt, 3 phase, 4 wire, multi-meter switchgear with (1) 200 amp house meter section. Provisions will be made for future capabilities to expand the service to accept multi-meter tenant sections. Each house loads will be supplied by (1)200 amp 277/480 volt panel, (1) 75 kVA transformer and (1) 120/208 volt panel.
Site Utilities. 4) Access routes, parking and staging areas, including fire lane and signage designations.
AutoNDA by SimpleDocs
Site Utilities. All utilities shall extend to the building and final connections made for electric, water and sanitary service. All storm water removal shall be provided via a combination of sheet drainage, underground pipe and drainage xxxxxx. Underground fire main and hydrants are included per municipal requirements.
Site Utilities. A. Lessor or Lessor’s A/E Design Professional is to contact local utility companies to determine system capacities and obtain utility service, easements, etc. Site utilities must comply with codes, regulations, and local ordinances.
Site Utilities. A. Provide site utilities including storm drainage, fire water, sanitary sewer and domestic water. Power and phone service, see Division 16. Connect all roof drainage to storm system. Back fill of trenches to be approved by Soils Engineer.