Site Boundaries Sample Clauses
The Site Boundaries clause defines the precise physical limits of the property or area where work, services, or activities under the contract are to take place. It typically specifies the geographic coordinates, addresses, or other identifying features that delineate the project site, and may include maps or diagrams for clarity. By clearly establishing the boundaries, this clause helps prevent disputes over access, responsibility, and liability, ensuring all parties understand the exact scope of the site involved in the agreement.
Site Boundaries. Except as otherwise expressly set forth herein or agreed in writing by Owner, Contractor shall confine the Work to the Site. Contractor shall comply with all requirements specified in Attachment L, including all the line lists specified therein. All obligations specified in Attachment L and the line lists shall be Contractor’s responsibility unless expressly stated to be Owner obligations.
Site Boundaries. (a) Appendix 1 contains location sketches of the Alliance Works.
(b) Appendix 2 contains details of the Project Site,
(c) The Upgrade will be designed and constructed to lie completely within the Project Site.
(d) Local Roads will be constructed entirely within local road reserves, the Project Site and/or areas provided for Local Road Works.
Site Boundaries. 17.1 It is the express responsibility of the Private Site Holder to verify the position and accuracy of all boundaries and beacons of the Site and to ensure that the building area is entirely within the Site, prior to commencement of building works.
17.2 The unregistered survey diagram of the Site is available from Management.
17.3 No fencing is permitted between Sites.
Site Boundaries. The Employer shall define the boundaries of the site.
Site Boundaries. 1. The boundaries outlining the Site, as specified in Annex 1 of the Protocol, and as indicated on the map are attached as Annex 2 of the Protocol. Such boundaries may be amended as required for the expeditious and smooth implementation of the LWR project and as agreed between KEDO and the DPRK.
2. KEDO shall prepare a Site Survey report, which shall include detailed coordinates of the boundaries referenced in paragraph 1 of this Article based on the Site Survey, relevant data provided by the DPRK in accordance with Annex 2, paragraph 2 of the Agreement, and the site selection criteria. The Site Survey report shall demonstrate that the Site can meet the site selection criteria. Final confirmation that the Site meets the site selection criteria shall be made in the PSAR.
Site Boundaries. (a) The boundaries of the site from any adjoining land must be clearly marked by a man-made or natural feature.
(b) No caravan or combustible structure shall be positioned within 3 metres of the boundary of the site.
(c) A plan of the site must be supplied to the local authority upon the application for a licence and, thereafter whenever there is a material change to the boundaries or layout of the site, or at any other time on the demand of the local authority.
(d) The plan supplied must clearly illustrate the layout of the site including all relevant structures, features and facilities on it and must be of suitable quality.
Site Boundaries. The boundary of the Contractor’s site and storage areas will be as delineated on any Tender Drawings, instructions by the PM or in the Special Security Conditions. The position of the Works will be as indicated on the drawings or by instructions given by the PM. The Works are to be executed within the boundaries of one of Her Majesty’s Penal Establishments and the Contractor shall comply with the Special Security Requirements. Existing mains and services are 415v to switch rooms and 240v to all other buildings. Hot and cold water and gas services are evident throughout. The Contractor shall disconnect and remove the existing generator and supply, install and commission a new generator on site at HMP Haverigg.
Site Boundaries
