Shifting Baseline Sample Clauses

Shifting Baseline. RCW baseline responsibilities will be associated with specific active clusters in existence at the time the landowner enters into the SHMA. Participating landowners may, with ADCNR-WFF’s consent, shift their baseline responsibilities to a new active cluster that has formed on their property subsequent to the signing of the SHMA. When a new active cluster is formed on an enrolled property, it may replace any other cluster harboring a group of similar or lesser demographic status (i.e., potential breeding pair can replace solitary bird or same sex groups) that was within the landowner’s original RCW baseline responsibility, provided each of the following conditions are met:
AutoNDA by SimpleDocs
Shifting Baseline. The Cooperator may, with ADCNR-WFF’s consent, shift its baseline responsibilities to a new active cluster that has formed on the enrolled property subsequent to the signing of this SHMA. When a new active cluster is formed on the enrolled property, the new cluster may replace any other cluster harboring a group of similar or lesser demographic status (i.e., potential breeding pair can replace solitary bird or same sex groups) that was within the Cooperator’s original RCW baseline responsibility provided each of the following conditions are met:

Related to Shifting Baseline

  • Measurement and Billing The Parties shall measure Interconnection in accordance with this Section 4.6 and xxxx in accordance with Article XXVII and this Section 4.6.

  • Measurement and Monitoring Tools Contractor shall implement measurement and monitoring tools and procedures reasonably designed to measure its performance of the Services and assess such performance against any applicable service levels. Contractor shall provide LAUSD with a monthly report of service level performance under any applicable Work Order. Upon LAUSD’s request, Contractor shall provide LAUSD with access to the measurement and monitoring tools described herein, and to any information that they generate.

  • Product Availability Under no circumstances shall Company be responsible to Representative or anyone else for its failure to fill accepted orders, or for its delay in filling accepted orders, when such failure or delay is due to strike, accident, labor trouble, acts of nature, freight embargo, war, civil disturbance, vendor problems or any cause beyond Company's reasonable control.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Service Availability You understand that Service availability is at all times conditioned upon the corresponding operation and availability of the communication systems used in communicating your instructions and requests to the Credit Union. We will not be liable or have any responsibility of any kind for any loss or damage thereby incurred by you in the event of any failure or interruption of such communication systems or services resulting from the act or omission of any third party, or from any other cause not reasonably within the control of the Credit Union.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • EPP service availability Refers to the ability of the TLD EPP servers as a group, to respond to commands from the Registry accredited Registrars, who already have credentials to the servers. The response shall include appropriate data from the Registry System. An EPP command with “EPP command RTT” 5 times higher than the corresponding SLR will be considered as unanswered. If 51% or more of the EPP testing probes see the EPP service as unavailable during a given time, the EPP service will be considered unavailable.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration sites • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description of the monitoring equipment and instrumentation which will be used. o Description of the key input parameters and output metrics which will be measured. o Description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified  Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting #2.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

Time is Money Join Law Insider Premium to draft better contracts faster.