SET UP PHASE Sample Clauses

SET UP PHASE. Provisions applicable to Description Dedicated XDR TEHTRIS sets up the TEHTRIS virtual infrastructure dedicated to the User. In the absence of any special arrangement between the Parties (such as the use of a third-party service provider to perform integration services), TEHTRIS shall integrate the Appliances when they are located in the TEHTRIS datacenter. Remote integration support days may be required for each new TEHTRIS Solution and/or Appliance installation. When TEHTRIS has completed integrating the TEHTRIS Appliances and/or transmitting the information to the User, TEHTRIS will announce the end of "Set up" to "Run". On Premise For Appliances to be located at the User's premises (On Premise), TEHTRIS shall communicate, based on the elements transmitted by the User, the exact configuration of each Appliance to be installed by the User in its own infrastructure.
AutoNDA by SimpleDocs
SET UP PHASE. A. STANDARD
SET UP PHASE. TFAC will utilize the TFAC System for administering and issuing Allmerica's Contracts. Allmerica will provide TFAC with the approved applications and administrative forms necessary to administer and issue the Contracts. TFAC will format and implement all forms and confirmation statements necessary to administer and issue the Contracts and will adhere to the Service Standards as outlined in Exhibit A-1.
SET UP PHASE 

Related to SET UP PHASE

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items:

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Construction Phase Part 1 –

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Preconstruction Phase The Preconstruction Phase shall mean the period commencing on the date of this CM/GC Contract and ending upon commencement of the Construction Phase; provided that if the Owner and CM/GC agree, the Construction Phase may commence before the Preconstruction Phase is completed, in which case both phases shall proceed concurrently, subject to the terms and conditions of the Contract Documents.

Time is Money Join Law Insider Premium to draft better contracts faster.