SEABIRD BYCATCH WORKING GROUP Sample Clauses

SEABIRD BYCATCH WORKING GROUP. 13.1 The Convenor of the Seabird Bycatch Working Group (SBWG), Mr Xxxxx Xxxxx presented the report of the Second Meeting of the SBWG to the Committee (AC4 Doc 14 Rev 2). The report covered most of the Items relevant to Agenda item 13 (Agenda Items 13.2, 13.3, 13.4. 13.5, 13.6 and 13.7) and discussions on these items were not dealt with further at the meeting.
AutoNDA by SimpleDocs
SEABIRD BYCATCH WORKING GROUP 

Related to SEABIRD BYCATCH WORKING GROUP

  • Working Group 1. The Parties hereby establish a Working Group on Temporary Entry for Business Persons, which shall meet at least once every 3 years or on request of the Free Trade Commission to consider any matter arising under this Chapter. 2. The Working Group's functions shall include: (a) to review the implementation and operation of this Chapter; (b) to consider the development of measures to further facilitate temporary entry of business persons on a reciprocal basis; (c) the identification of measures that affect the temporary entry of business persons under this Chapter; and (d) the observance of the issues established under Article 121 (Cooperation).

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Mastectomy Services Inpatient This plan provides coverage for a minimum of forty-eight (48) hours in a hospital following a mastectomy and a minimum of twenty-four (24) hours in a hospital following an axillary node dissection. Any decision to shorten these minimum coverages shall be made by the attending physician in consultation with and upon agreement with you. If you participate in an early discharge, defined as inpatient care following a mastectomy that is less than forty-eight (48) hours and inpatient care following an axillary node dissection that is less than twenty-four (24) hours, coverage shall include a minimum of one (1) home visit conducted by a physician or registered nurse.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

Time is Money Join Law Insider Premium to draft better contracts faster.