Schematic Design Submission Sample Clauses

Schematic Design Submission. The Design-Builder shall prepare the schematic design submission for review and comment by Client Agency and the Department. Such schematic design submission shall include the elements and information listed below.
AutoNDA by SimpleDocs
Schematic Design Submission. Owner and Private Entity acknowledge that the design delivered with Private Entity’s Detailed-Phase Proposal inclusive of the post-proposal changes is an adequate basis for proceeding to the Schematic Design submission. Private Entity will provide the Owner with revised drawings or descriptions as necessary to verify and document mutual understandings since the submission of the Detailed-Phase Proposal, and submit Schematic Design to Owner for approval.

Related to Schematic Design Submission

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • BID SUBMISSION All Bids are to be packaged, sealed and submitted to the location stated in the Bid Specifications. Bidders are solely responsible for timely delivery of their Bids to the location set forth in the Bid Specifications prior to the stated Bid opening date/time. A Bid return envelope, if provided with the Bid Specifications, should be used with the Bid sealed inside. If the Bid response does not fit into the envelope, the Bid envelope should be attached to the outside of the sealed box or package with the Bid inside. If using a commercial delivery company that requires use of their shipping package or envelope, Bidder’s sealed Bid, labeled as detailed below, should be placed within the shipper’s sealed envelope to ensure that the Bid is not prematurely opened. All Bids must have a label on the outside of the package or shipping container outlining the following information: “BID ENCLOSED (bold print, all capitals) • Group Number • IFB or RFP Number • Bid Submission date and time” In the event that a Bidder fails to provide such information on the return Bid envelope or shipping material, the receiving entity reserves the right to open the shipping package or envelope to determine the proper Bid number or Product group, and the date and time of Bid opening. Bidder shall have no claim against the receiving entity arising from such opening and such opening shall not affect the validity of the Bid or the procurement. Notwithstanding the receiving agency’s right to open a Bid to ascertain the foregoing information, Bidder assumes all risk of late delivery associated with the Bid not being identified, packaged or labeled in accordance with the foregoing requirements. All Bids must be signed by a person authorized to commit the Bidder to the terms of the Bid Documents and the content of the Bid (offer).

  • Design Changes Axon may make design changes to any Axon Device or Service without notifying Agency or making the same change to Axon Devices and Services previously purchased by Agency.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Application Submission Submissions of a rental application does not guarantee approval or acceptance. It does not bind us to accept the application or to sign a Lease contact. APPLICANT SCREENING CRITERIA Fair Housing Statement. Xxxxx Management is an equal housing opportunity & fair housing provider. We do not discriminate against persons on the basis of race, color, religion, national origin, sex, familial status, disability, creed, marital status, public assistance, ancestry, and sexual or affectional orientation. Identification and Application Process. Every person over 18 must give consent to be screened and provide a government issued photo ID. Social Security Number verification may be required for specific housing programs. Application Requirements. Applications must be filled out completely and accurately. Any misstatements or omissions made on your application, whether or not discovered before you move into the building, is grounds for denial of an application or termination of an existing lease. Information must be legible and verifiable. If information given on the application cannot be verified, this is a reason for rejection. Omission of information, such as an address or employer, may be grounds for rejection. Occupancy. The initial maximum number of residents in a unit is equal to two persons per bedroom unless otherwise stated in the property’s Resident Selection Plan, where applicable. Each unit is limited to no more than two (2) unrelated or four (4) related adult persons per unit. Xxxxx Management defines a related adult person as either a child, dependent, or parent of the head of household. General occupancy standards and any federal, state, or local housing ordinances will supersede this policy. Housing History. We require the name and last known telephone number of each landlord/property manager for each address you have had for the last three years. Roommate references are not acceptable. The refusal of a prior landlord to give a reference, or a negative reference, may be grounds for rejection. In the case of first-time renters, or applicants without prior rental history, this requirement may be varied subject to additional requirements of management. Eviction Filings. Unlawful detainers or evictions within the past five (5) years is a basis for denial of an application.

  • Selection of Architect/Construction Drawings Tenant shall retain the architect/space planner (the “Architect”) approved by Landlord, which approval shall not be unreasonably withheld, to prepare the Construction Drawings. Tenant shall retain the engineering consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, lifesafety, and sprinkler work in the Premises. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the “Construction Drawings.” All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the base building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.