Rotterdam Substation Sample Clauses

Rotterdam Substation. All modifications shall be completed in the Rotterdam Substation yard and control house. (It is assumed that all existing wiring trays and panels have sufficient capacity to accommodate the changes.)
AutoNDA by SimpleDocs
Rotterdam Substation. The 230kV portion of Connecting Transmission Owner’s Rotterdam Substation shall be retired; the existing connections to the substation’s 115kV busses 33G and 77G will be reused for the LS Power’s Xxxxxx Road Substation 345kV transformers; and the existing Line 38 to Eastover Station shall re-terminate at the Xxxxxx Road Substation. [CONTAINS CEII – REMOVED FROM PUBLIC VERSION]

Related to Rotterdam Substation

  • Gouvernement des États-Unis Le logiciel et la documentation constituent des « Commercial Items » (éléments commerciaux), tel que ce terme est défini dans la clause 48 C.F.R. (Code of Federal Rules) §2.101, consistant en « Commercial Computer Software » (logiciel) et « Commercial Computer Software Documentation » (documentation), tels que ces termes sont utilisés dans les clauses 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202. Conformément à la clause 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202-1 à 227.7202-4, le « Commercial Computer Software » et le « Commercial Computer Software Documentation » sont fournis sous licence au gouvernement des États-Unis (a) uniquement comme « Commercial Items » et (b) uniquement accompagnés des droits octroyés à tous les autres utilisateurs conformément aux termes et conditions ci-inclus. Droits non publiés réservés en vertu de la législation des droits d’auteur en vigueur aux États-Unis.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.