Recreation Needs Assessment Summary Report Sample Clauses

Recreation Needs Assessment Summary Report. 3.3 Online Questionnaire/Public Comment #1
AutoNDA by SimpleDocs
Recreation Needs Assessment Summary Report. MIG will provide the questionnaire link for posting on the City’s website and an announcement suitable for sending out to existing email lists and listserves.
Recreation Needs Assessment Summary Report. Based on projected build‐out populations, land use designations and the results of Task 3, 4.1‐

Related to Recreation Needs Assessment Summary Report

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • ASSESSMENT REPORT Within 120 days following the general election held on November 2nd 2003, the returning officer of the munici- pality shall forward, in accordance with section 659.3 of the Act respecting elections and referendums in munici- palities (R.S.Q., c. E-2.2), an assessment report to the Chief Electoral Officer and the Minister setting out relevant ways to improve the trial and addressing, in particular, the following points : — the preparations for the election (choice of the new method of voting, communications plan, etc.) ; — the conduct of the advance poll and the poll ; — the cost of using the electronic voting system : – the cost of adapting election procedures ; – non-recurrent costs likely to be amortized ; – a comparison between the actual polling costs and the estimated polling costs using the new methods of voting and the projected cost of holding the general election on November 2nd 2003 using traditional methods ; — the number and duration of incidents during which voting was stopped, if any ; — the advantages and disadvantages of using the new method of voting ; — the results obtained during the addition of the votes and the correspondence between the number of ballot paper cards issued to the deputy returning officers and the number of ballot paper cards returned used and unused ; — the examination of rejected ballot papers, if it has been completed.

  • Needs Assessment 1. The Contractor shall conduct a cultural and linguistic group-needs assessment of the eligible client population in the Contractor’s service area to assess the language needs of the population and determine what reasonable steps are necessary to ensure meaningful access to services and activities to eligible individuals. [22 CCR 98310, 98314] The group-needs assessment shall take into account the following four (4) factors:

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Initial Report An initial performance report no later than 30 days after FEMA has approved the first Public Assistance project.

  • Conformity Assessment Procedures 1. Each Party shall give positive consideration to accepting the results of conformity assessment procedures of other Parties, even where those procedures differ from its own, provided it is satisfied that those procedures offer an assurance of conformity with applicable technical regulations or standards equivalent to its own procedures.

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Inspection Report The Client and the Company agree that the Company, and its inspector(s), will prepare a written home inspection report which shall:

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

Time is Money Join Law Insider Premium to draft better contracts faster.