QAP Sample Clauses

QAP. Firm has to submit the Draft QAP within 15 days from date of placement of PO for approval of MDL and M/s RINA.
AutoNDA by SimpleDocs
QAP. Firm has to submit Draft QAP in the technical bid and final QAP for approval within 5 days from the date of purchase order for approval by MDL.

Related to QAP

  • Timeline Contractor must perform the Services and deliver the Deliverables according to the following timeline: • •

  • Quality Assurance Program An employee shall be entitled to leave of absence without loss of earnings from her or his regularly scheduled working hours for the purpose of writing examinations required by the College of Nurses of Ontario arising out of the Quality Assurance Program.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Training Plan Within 90 days after the Effective Date, Good Shepherd shall develop a written plan (Training Plan) that outlines the steps Good Shepherd will take to ensure that: (a) all Covered Persons receive adequate training regarding Good Shepherd’s CIA requirements and Compliance Program, including the Code of Conduct and (b) all Relevant Covered Persons receive adequate training regarding: (i) the Federal health care program requirements regarding eligibility for hospice services upon initial admission, recertification for continued stay, and for Continuous Care, Respite Care, and General Inpatient Care; (ii) the role of physicians in making eligibility determinations; (iii) the accurate coding and submission of claims; (iv) policies, procedures, and other requirements applicable to the documentation of medical records; (v) the personal obligation of each individual involved in the claims submission process to ensure that such claims are accurate; (vi) applicable reimbursement statutes, regulations, and program requirements and directives; (vii) the legal sanctions for violations of the Federal health care program requirements; and (viii) examples of proper and improper eligibility determinations, documentation, and claims submission practices. The Training Plan shall include information regarding the training topics, the categories of Covered Persons and Relevant Covered Persons required to attend each training session, the length of the training, the schedule for training, and the format of the training. Within 30 days of the OIG’s receipt of Good Shepherd’s Training Plan, OIG will notify Good Shepherd of any comments or objections to the Training Plan. Absent notification by the OIG that the Training Plan is unacceptable, Good Shepherd may implement its Training Plan. Good Shepherd shall furnish training to its Covered Persons and Relevant Covered Persons pursuant to the Training Plan during each Reporting Period.

  • Timelines a) Timelines may be extended by mutual consent of the parties.

  • Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "C", which is attached hereto and forms part of this Agreement.

  • Review Protocol A narrative description of how the Claims Review was conducted and what was evaluated.

  • Review Process A/E's Work Product will be reviewed by County under its applicable technical requirements and procedures, as follows:

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • Project Manual A bound manual prepared by the Design Professional. It includes the Invitation to Bid, Instructions to Bidders, the Bid Form, the Specifications, the General Conditions and Supplementary General Conditions.