Project Site Conditions Sample Clauses

Project Site Conditions. 12.3.1 It is recorded that SANParks has made available to the Private Party for its information, prior to the Signature Date, all relevant data in SANParks’ possession on the conditions at the Spa Facility, including Environmental aspects. SANParks shall similarly make available to the Private Party all such similar information which comes into SANParks’ possession after the Signature Date. The Private Party shall be responsible for interpreting all such data.
AutoNDA by SimpleDocs
Project Site Conditions. The Municipality has conducted studies or caused studies to be conducted on their behalf at the Project Site, the results of which have been made available to the Private Party.
Project Site Conditions. A. The xxxxx are located at individual well sites along, or just off of Goodlette-Frank Road. Some of these xxxxx may be located within the medians of the road. Due to the high traffic flow, alternate means/methods such as working during non-peak hours or coordinating the closing of traffic lanes, may be required to manage the work area. Work of this type may require Collier County Right of Way Permits and MOT Plans. All documentation and costs related to ROW Permits shall be the responsibility of the Contractor. The Contractor shall take all necessary precautions to prevent discharge water from undermining the foundations of the well pads and washing onto paved streets. The detailed plan of action must take all localized factors into consideration. The discharge water shall be neutralized if it has been acidized or chlorinated. Sodium thyosulfate is an approved neutralizing chemical. The site must be kept well-maintained and clean throughout the project due to the public locations.
Project Site Conditions. 1 Following are potential health, environmental and safety hazards at the site for which Work may involve contact with: .1 Known latent site and environmental conditions: .1 Steep slopes and rock faces. .2 Streams, xxxxxx and other water bodies. .3
Project Site Conditions. 1 Work at site will involve working in and around open water:
Project Site Conditions. 12.3.1 It is recorded that SANParks has made available to the Private Party for its information, prior to the Signature Date, all relevant data in SANParks possession on the conditions of the Scooter Tours operation, including Environmental aspects. SANParks shall similarly make available to the Private Party all such similar information that comes into SANParks possession after the Signature Date. The Private Party shall be responsible for interpreting all such data.
Project Site Conditions. 3.3.1 The physical and the ambient conditions including climatic, hydrological, hydro geological, ecological, environmental, geotechnical, geological, paleontological and archaeological conditions of the Project Site (the “Project Site Conditions”) shall be the sole responsibility of the Concessionaire. Accordingly, without limiting any other obligations of the Concessionaire that are included in the Project Deliverables, the Concessionaire shall be deemed as at the Signature Date to have:
AutoNDA by SimpleDocs
Project Site Conditions. A. Environmental Requirements: Weather conditions: Do not proceed with installation of firestop materials when temperatures (including substrate) exceed the manufacturer’s recommended limitations for installation.
Project Site Conditions. A. The xxxxx are located at individual well sites located in East Golden Gate. The Contractor shall take all necessary precautions to prevent discharge water from undermining the foundations of the well pads and washing onto paved streets in East Golden Gate. The discharge water shall be neutralized if it has been acidized or chlorinated. Sodium thyosulfate is an approved neutralizing chemical. The site must be kept well-maintained and clean throughout the project due to the public locations.
Project Site Conditions. A. Verify location and coordinate installation of utility poles and other structures to include but not limited to: existing planting and pathways, signs, utility boxes, manholes, and equipment block-outs and pads, prior to commencement of work in this Section.