PROJECT SCOPE OF WORK Sample Clauses

PROJECT SCOPE OF WORK. This Project Scope of Work is issued pursuant to and is in accordance with the Master Media Buying Services Agreement entered into between the parties dated [Insert Effective Date of Agreement].
AutoNDA by SimpleDocs
PROJECT SCOPE OF WORK. SAMPLE The Scope of Work, Project details, and timelines are outlined in Attachment 2, the “SEP Proposal.” The budget information is outlined in Attachment 3, the “SEP Budget.” The SEP Recipient/Administrator shall follow the timelines and budget outlined in the SEP Proposal and SEP Budget. The SEP Recipient/Administrator shall notify CARB, in writing, of any changes. CARB will approve or deny the requested changes within ten (10) business days from the date the SEP Recipient/Administrator requests the changes.
PROJECT SCOPE OF WORK a. The Architect shall provide evaluation and feasibility/conceptual design services, otherwise referred to as the “Initial Phase Services” for a feasibility study for upgrades to the Ouray County Courthouse building and site per the Scope Memorandum as attached and dated August 28th, 2015.
PROJECT SCOPE OF WORK. Tampa Executive Airport (VDF) The VDF project scope elements include the addition and replacement of video surveillance cameras at strategic locations on the airfield and at the terminal, hangars, and other airport facilities; new access control portals; and new fiber optic infrastructure. New gate operators, dual leaf slide gates, and video surveillance for vehicle identification will be provided at airfield gate locations. Recently installed communication cabinets and card reader pedestals will be reused. Approximately fifteen hundred (1500) linear feet of airfield security fencing will be replaced at VDF at locations to be determined at the beginning of the design phase. New video surveillance cameras will be added, and existing cameras will be replaced at the terminal building, hangars, maintenance facility, select access control gates, and airfield. The existing Video Surveillance System will be evaluated and extended as required. Video Surveillance design will include video storage calculations to account for new and existing cameras as well as Pixel per Foot Calculation to aid in camera selection. Fiber optic infrastructure will be installed to specific perimeter locations on the airport property. Due to the significant amount of existing onsite utilities (storm water piping, underground electrical, communications/fiber, and airfield lighting circuits) subsurface utility engineering (SUE) will be performed by ECHO UES, Inc. to establish utility locations along the electrical or fiber optic pathways to allow the design team to address potential conflicts. Communication duct banks will be installed in turfed areas to the extent possible. Directional drilling installation will be incorporated for crossing paved roads, taxiways and apron areas. Open trench cutting of pavement will be avoided where possible and used only where other methods are too costly or impractical. New access control portals will be added at building doors in accordance with the security program upgrades. The existing interior IT room will be evaluated and any additional fiber patch panels, surge protection, or UPS power provided to support the new equipment. Any required owner furnished network will be coordinated to establish communication over the existing Frontier Lease line back to Tampa International Airport. Geotechnical investigations and materials testing will be performed by Madrid CPWG. This will generally include estimating SHWT and determination of soil types and under...
PROJECT SCOPE OF WORK. The project must be undertaken in accordance with all applicable federal, state and local laws and ordinances.
PROJECT SCOPE OF WORK. This project/change shall provide the following:
PROJECT SCOPE OF WORK. Task 1: Procurement Support The proposed Procurement Support would include review of the County’s procurement documents to ensure they are in compliance, including past purchases to adjust as needed to support greater compliance. We would also assist with tasks including writing specifications, soliciting (formally and informally) projects that are related to COVID-19, confirming XXX status on vendors, creating/reviewing of Independent Cost Estimates (ICE) and Price/Cost Analysis. Our services would also include the below additional general support services/compliance aids:
AutoNDA by SimpleDocs
PROJECT SCOPE OF WORK. Vascular Biogenics Ltd. (hereinafter referred to as “VASCULAR BIOGENICS”) has requested that BioClinica, Inc. and subsidiaries (hereinafter referred to as “BIOCLINICA”) provide medical imaging core laboratory services in support of an Ulcerative Colitis Study.
PROJECT SCOPE OF WORK. The Contractor shall provide all work, labor, materials, equipment and services necessary to perform and complete the Scope of Work described as: Project Location: (check one) De Anza Foothill District Office Sunnyvale Center
PROJECT SCOPE OF WORK. 1. The following four markets are included for this initial Scope of Work to complete coaxial construction builds into all 5700 sites.
Time is Money Join Law Insider Premium to draft better contracts faster.