{"component": "clause", "props": {"groups": [{"snippet": "The Proceed Order is a written notice from the Owner that includes a specified date (i.e. the Proceed Order Date) upon which the Contractor is authorized to commence physical work on the Site. Unless the Proceed Order states otherwise, the Proceed Order Date shall be the date upon which the Proceed Order is actually signed and dated by the Owner\u2019s authorized representative. A Proceed Order is a condition precedent to the execution of any Work on the site by the Contractor. The Proceed Order was formerly referred to as the \u201cNotice to Proceed.\u201d", "snippet_links": [{"key": "written-notice", "type": "definition", "offset": [23, 37]}, {"key": "specified-date", "type": "clause", "offset": [69, 83]}, {"key": "proceed-order-date", "type": "clause", "offset": [94, 112]}, {"key": "work-on", "type": "definition", "offset": [175, 182]}, {"key": "the-site", "type": "clause", "offset": [183, 191]}, {"key": "signed-and-dated", "type": "clause", "offset": [318, 334]}, {"key": "by-the-owner", "type": "clause", "offset": [335, 347]}, {"key": "authorized-representative", "type": "clause", "offset": [350, 375]}, {"key": "condition-precedent", "type": "clause", "offset": [398, 417]}, {"key": "the-execution", "type": "clause", "offset": [421, 434]}, {"key": "by-the-contractor", "type": "clause", "offset": [459, 476]}, {"key": "notice-to-proceed", "type": "definition", "offset": [529, 546]}], "size": 99, "samples": [{"hash": "hqWBqd32mEn", "uri": "/contracts/hqWBqd32mEn#proceed-order", "label": "Construction Contract", "score": 36.3347812398, "published": true}, {"hash": "6vvjgXgmKsQ", "uri": "/contracts/6vvjgXgmKsQ#proceed-order", "label": "Construction Contract", "score": 34.7670516968, "published": true}, {"hash": "e4oPKD6iQBT", "uri": "/contracts/e4oPKD6iQBT#proceed-order", "label": "Construction Contract", "score": 33.5207176208, "published": true}], "hash": "ae958a24943adb301beeebb5bb883536", "id": 1}, {"snippet": "The Proceed Order is a written notice from the Owner that includes a specified date upon which the Design-Builder is authorized to commence physical work on the Site. A Proceed Order is a condition precedent to the execution of any Work on the site by the Design-Builder. The Proceed Order was formerly referred to as the \u201cNotice to Proceed.\u201d", "snippet_links": [{"key": "written-notice", "type": "definition", "offset": [23, 37]}, {"key": "the-owner", "type": "definition", "offset": [43, 52]}, {"key": "specified-date", "type": "clause", "offset": [69, 83]}, {"key": "the-design", "type": "clause", "offset": [95, 105]}, {"key": "work-on", "type": "definition", "offset": [149, 156]}, {"key": "the-site", "type": "clause", "offset": [157, 165]}, {"key": "condition-precedent", "type": "clause", "offset": [188, 207]}, {"key": "the-execution", "type": "clause", "offset": [211, 224]}, {"key": "notice-to-proceed", "type": "definition", "offset": [323, 340]}], "size": 18, "samples": [{"hash": "iRw5lY7fyjK", "uri": "/contracts/iRw5lY7fyjK#proceed-order", "label": "Design Build Contract", "score": 34.5430831909, "published": true}, {"hash": "2IvsvLuWUB", "uri": "/contracts/2IvsvLuWUB#proceed-order", "label": "Design Build Contract", "score": 34.5223617554, "published": true}, {"hash": "c53NTyeRv2A", "uri": "/contracts/c53NTyeRv2A#proceed-order", "label": "Design Build Contract", "score": 33.5207176208, "published": true}], "hash": "16b2c6dce4d68da884bf2e08e352ebd1", "id": 2}, {"snippet": "The Construction Professional is authorized to proceed with all Work as of \u00abProcessFields_ProceedOrderDate\u00bb Construction Professional: \u00abProjectCustom_ConstructionProfessionalCP\u00bb By: \u00abProcessFields_CPApprover\u00bb Date: \u00abProcessFields_CPApprDate\u00bb The Design Professional recommends this Guaranteed Maximum Price Change Order for Owner\u2019s Acceptance. The Design Professional agrees to the proposed Construction Progress Schedule which includes the Submittal and Shop Drawing Schedule. Design Professional: \u00abProjectCustom_DesignProfessional\u00bb By: \u00abProcessFields_Reviewer\u00bb Date: \u00abProcessFields_DateReviewed\u00bb GEORGIA STATE FINANCING AND INVESTMENT COMMISSION By: \u00abProcessFields_GSFICApprover\u00bb Title: \u00abProcessFields_GSFICApproverTitle\u00bb Dated: \u00abProcessFields_GMPExecutionDate\u00bb Distribution: Construction Professional Design Professional Executive Administrator Using Agency GSFIC Project Manager GSFIC CCS ENCLOSURES: Exhibit A List of (GMP) Construction Documents Exhibit B List of Clarification, Assumptions & Exclusions Exhibit C Overall Project Schedule Under Incumbrance Record \u00abProcess_Prefix\u00bb - \u00abProcessInfo_Counter\u00bb Owner: Georgia State Financing & Investment Commission Project Name: \u00abProject_Name\u00bb Construction Professional: \u00abProjectCustom_ConstructionProfessional\u00bb Design Professional: \u00abProjectCustom_DesignProfessional\u00bb This Construction Documents Change Order is executed to incorporate the Construction Documents into Construction Management Agreement for the above listed Project. Owner and Construction Professional agree as follows: The Construction Professional shall perform all Work described in the Construction Documents as listed on Exhibit A. The Construction Documents are hereby incorporated into the Construction Management Agreement. The Construction Professional agrees that the Construction Documents are consistent with the assumptions set forth in the GMP Change Order (if any) and are complete, accurate, adequate, consistent, coordinated, and sufficient for construction of the Work. The Contract Time shall be changed by awarding \u00abProcessFields_FinalContractExtDays\u00bb additional calendar days for Material Completion on account of this Change Order. The Contract Sum shall be changed by \u00abCommitmentChange_Amount\u00bb on account of this Change Order. The change in Contract Time and Contract Sum (if any) provided by this Change Order constitutes compensation in full to CM/GC for the Work and accounts for all delays and impacts related thereto. Construction Professional: \u00abProcessFields_CP_Company\u00bb By: \u00abProcessFields_IRCOApprover\u00bb Date: \u00abProcessFields_CPApprDate\u00bb Design Professional: \u00abProjectCustom_DesignProfessional\u00bb By: \u00abProcessFields_Reviewer\u00bb Date: \u00abProcessFields_DateReviewed\u00bb GEORGIA STATE FINANCING AND INVESTMENT COMMISSION By: \u00abProcessFields_GSFICApprover\u00bb Title: \u00abProcessFields_GSFICApproverTitle\u00bb Dated: \u00abProcessFields_CCOExecutionDate\u00bb Distribution: Construction Professional Design Professional Executive Administrator Using Agency GSFIC Project Manager GSFIC CCS", "snippet_links": [{"key": "construction-professional", "type": "definition", "offset": [4, 29]}, {"key": "all-work", "type": "clause", "offset": [60, 68]}, {"key": "the-design-professional", "type": "clause", "offset": [242, 265]}, {"key": "price-change", "type": "definition", "offset": [301, 313]}, {"key": "agrees-to", "type": "clause", "offset": [368, 377]}, {"key": "construction-progress-schedule", "type": "definition", "offset": [391, 421]}, {"key": "submittal-and-shop-drawing-schedule", "type": "clause", "offset": [441, 476]}, {"key": "investment-commission", "type": "definition", "offset": [626, 647]}, {"key": "executive-administrator", "type": "definition", "offset": [824, 847]}, {"key": "using-agency", "type": "clause", "offset": [848, 860]}, {"key": "project-manager", "type": "clause", "offset": [867, 882]}, {"key": "a-list", "type": "definition", "offset": [913, 919]}, {"key": "b-list", "type": "definition", "offset": [960, 966]}, {"key": "exhibit-c", "type": "clause", "offset": [1010, 1019]}, {"key": "overall-project-schedule", "type": "clause", "offset": [1020, 1044]}, {"key": "project-name", "type": "definition", "offset": [1166, 1178]}, {"key": "construction-documents-change-order", "type": "clause", "offset": [1324, 1359]}, {"key": "the-construction-documents", "type": "clause", "offset": [1387, 1413]}, {"key": "agreement-for", "type": "clause", "offset": [1443, 1456]}, {"key": "owner-and-construction", "type": "clause", "offset": [1483, 1505]}, {"key": "agree-as-follows", "type": "clause", "offset": [1519, 1535]}, {"key": "work-described", "type": "clause", "offset": [1585, 1599]}, {"key": "consistent-with-the", "type": "clause", "offset": [1822, 1841]}, {"key": "the-gmp-change-order", "type": "clause", "offset": [1867, 1887]}, {"key": "construction-of-the-work", "type": "clause", "offset": [1979, 2003]}, {"key": "the-contract-time", "type": "clause", "offset": [2005, 2022]}, {"key": "calendar-days", "type": "definition", "offset": [2100, 2113]}, {"key": "material-completion", "type": "clause", "offset": [2118, 2137]}, {"key": "the-contract-sum", "type": "clause", "offset": [2171, 2187]}, {"key": "change-in-contract", "type": "definition", "offset": [2271, 2289]}, {"key": "compensation-in-full", "type": "clause", "offset": [2363, 2383]}, {"key": "work-and", "type": "clause", "offset": [2401, 2409]}, {"key": "delays-and-impacts", "type": "clause", "offset": [2427, 2445]}], "size": 2, "samples": [{"hash": "jrJ1EFHbhub", "uri": "/contracts/jrJ1EFHbhub#proceed-order", "label": "Cm/Gc Contract Forms", "score": 22.5455169678, "published": true}], "hash": "6411313a55a57ca864d11d9cc4a3647c", "id": 7}, {"snippet": "The Proceed Order is a written notice from the Owner that includes a specified date (i.e. the Proceed Order Date) upon which the CM/GC is authorized to commence physical work on the Site. Unless the Proceed Order states otherwise, the Proceed Order Date shall be the date upon which the Proceed Order is actually signed and dated by the Owner\u2019s authorized representative. A Proceed Order is a condition precedent to the execution of any Work on the site by the CM/GC. The Proceed Order was formerly referred to as the \u201cNotice to Proceed.\u201d Project. The total and complete undertaking for the public works facility to be constructed under this Contract. Project Manual. A bound manual prepared by the Design Professional. It includes the Request for Proposals, the Specifications, the General Requirements and Supplementary General Requirements, and Addenda.", "snippet_links": [{"key": "written-notice", "type": "definition", "offset": [23, 37]}, {"key": "specified-date", "type": "clause", "offset": [69, 83]}, {"key": "proceed-order-date", "type": "clause", "offset": [94, 112]}, {"key": "work-on", "type": "definition", "offset": [170, 177]}, {"key": "the-site", "type": "clause", "offset": [178, 186]}, {"key": "signed-and-dated", "type": "clause", "offset": [313, 329]}, {"key": "by-the-owner", "type": "clause", "offset": [330, 342]}, {"key": "authorized-representative", "type": "clause", "offset": [345, 370]}, {"key": "condition-precedent", "type": "clause", "offset": [393, 412]}, {"key": "the-execution", "type": "clause", "offset": [416, 429]}, {"key": "notice-to-proceed", "type": "definition", "offset": [519, 536]}, {"key": "the-total", "type": "clause", "offset": [548, 557]}, {"key": "public-works", "type": "definition", "offset": [591, 603]}, {"key": "under-this-contract", "type": "clause", "offset": [631, 650]}, {"key": "project-manual", "type": "definition", "offset": [652, 666]}, {"key": "prepared-by", "type": "definition", "offset": [683, 694]}, {"key": "the-design-professional", "type": "clause", "offset": [695, 718]}, {"key": "request-for-proposals", "type": "definition", "offset": [736, 757]}, {"key": "the-specifications", "type": "clause", "offset": [759, 777]}, {"key": "the-general", "type": "clause", "offset": [779, 790]}, {"key": "supplementary-general-requirements", "type": "clause", "offset": [808, 842]}], "size": 11, "samples": [{"hash": "WwViTmUYKE", "uri": "/contracts/WwViTmUYKE#proceed-order", "label": "Construction Management Agreement", "score": 32.8100204468, "published": true}, {"hash": "f0dkjM8y12w", "uri": "/contracts/f0dkjM8y12w#proceed-order", "label": "Construction Management Agreement", "score": 32.3980331421, "published": true}, {"hash": "5QHW3pm6j55", "uri": "/contracts/5QHW3pm6j55#proceed-order", "label": "Construction Management Agreement", "score": 31.5207195282, "published": true}], "hash": "4aca242e317d41dd99e4516d9c678fe2", "id": 3}, {"snippet": "A Proceed Order is a written notice from the Board that includes a specified date upon which the CMR is authorized to commence with a Phase of the Project. A Proceed Order is a condition precedent to the incurring of any compensable costs, including overhead costs, or the earning of and entitlement to any fees by the CMR. The Proceed Order was formerly referred to as the \u201cNotice to Proceed.\u201d", "snippet_links": [{"key": "written-notice", "type": "definition", "offset": [21, 35]}, {"key": "the-board", "type": "clause", "offset": [41, 50]}, {"key": "specified-date", "type": "clause", "offset": [67, 81]}, {"key": "phase-of", "type": "clause", "offset": [134, 142]}, {"key": "the-project", "type": "definition", "offset": [143, 154]}, {"key": "condition-precedent", "type": "clause", "offset": [177, 196]}, {"key": "compensable-costs", "type": "definition", "offset": [221, 238]}, {"key": "overhead-costs", "type": "definition", "offset": [250, 264]}, {"key": "entitlement-to", "type": "clause", "offset": [288, 302]}, {"key": "notice-to-proceed", "type": "definition", "offset": [375, 392]}], "size": 3, "samples": [{"hash": "dcVkcRWRe42", "uri": "/contracts/dcVkcRWRe42#proceed-order", "label": "Construction Management at Risk Agreement", "score": 25.043806076, "published": true}, {"hash": "erckkXgDV3N", "uri": "/contracts/erckkXgDV3N#proceed-order", "label": "Construction Management at Risk Agreement", "score": 23.5968513489, "published": true}, {"hash": "3bBfY84wYGA", "uri": "/contracts/3bBfY84wYGA#proceed-order", "label": "Construction Management at Risk Agreement", "score": 23.5968513489, "published": true}], "hash": "190e61228bc6eaf3f52c40ed2c1a8178", "id": 4}, {"snippet": "The Notice from Owner authorizing CM/GC to commence Construction Phase services. Proceed Order Date. The date on which the Proceed Order is issued or, if stated therein, the effective date of the Proceed Order.", "snippet_links": [{"key": "the-notice", "type": "clause", "offset": [0, 10]}, {"key": "construction-phase-services", "type": "definition", "offset": [52, 79]}, {"key": "proceed-order-date", "type": "clause", "offset": [81, 99]}, {"key": "effective-date-of-the", "type": "clause", "offset": [174, 195]}], "size": 2, "samples": [{"hash": "fzC16leCbpJ", "uri": "/contracts/fzC16leCbpJ#proceed-order", "label": "Construction Management Contract", "score": 21.893907547, "published": true}, {"hash": "1YaYPE7cpCT", "uri": "/contracts/1YaYPE7cpCT#proceed-order", "label": "Construction Management Agreement", "score": 20.062286377, "published": true}], "hash": "4fd59acfebec11136d6154981fc3ca35", "id": 5}, {"snippet": "A Proceed Order is a written notice from the Owner that includes a specified date (i.e. the Proceed Order Date) upon which the CM/GC is authorized to commence a Component of Construction Phase services. Unless the Proceed Order states otherwise, the Proceed Order Date shall be the date upon which the Proceed Order is actually signed and dated by the Owner\u201fs authorized representative. A Proceed Order is a condition precedent to the execution of any Work on the site by the CM/GC. The Proceed Order was formerly referred to as the \u201cNotice to Proceed.\u201d A separate Proceed Order will be issued for each Component Change approved under this Contract.", "snippet_links": [{"key": "written-notice", "type": "definition", "offset": [21, 35]}, {"key": "the-owner", "type": "definition", "offset": [41, 50]}, {"key": "specified-date", "type": "clause", "offset": [67, 81]}, {"key": "proceed-order-date", "type": "clause", "offset": [92, 110]}, {"key": "construction-phase-services", "type": "definition", "offset": [174, 201]}, {"key": "signed-and-dated", "type": "clause", "offset": [328, 344]}, {"key": "authorized-representative", "type": "clause", "offset": [360, 385]}, {"key": "condition-precedent", "type": "clause", "offset": [408, 427]}, {"key": "the-execution", "type": "clause", "offset": [431, 444]}, {"key": "work-on", "type": "definition", "offset": [452, 459]}, {"key": "the-site", "type": "clause", "offset": [460, 468]}, {"key": "notice-to-proceed", "type": "definition", "offset": [534, 551]}, {"key": "a-separate", "type": "definition", "offset": [554, 564]}, {"key": "under-this-contract", "type": "clause", "offset": [629, 648]}], "size": 2, "samples": [{"hash": "aI9vzMdcJRF", "uri": "/contracts/aI9vzMdcJRF#proceed-order", "label": "Construction Management Agreement", "score": 24.4682445526, "published": true}, {"hash": "aRmY9wQgNDS", "uri": "/contracts/aRmY9wQgNDS#proceed-order", "label": "Construction Management Agreement", "score": 22.7344284058, "published": true}], "hash": "7540615a161672b045b5562e67856085", "id": 6}, {"snippet": "A direction to the Contractor to proceed with Changed Work pursuant to Section 10.3(c).", "snippet_links": [{"key": "contractor-to", "type": "clause", "offset": [19, 32]}, {"key": "changed-work", "type": "definition", "offset": [46, 58]}, {"key": "pursuant-to-section", "type": "definition", "offset": [59, 78]}], "size": 1, "samples": [{"hash": "a7tQeVibfhs", "uri": "/contracts/a7tQeVibfhs#proceed-order", "label": "Construction Contract", "score": 23.5674190521, "published": true}], "hash": "905258eb6ac1f73bcc9c14fcaf4b8ee6", "id": 8}, {"snippet": "The proceed order is a written notice from the Owner pursuant to which the Contractor shall commence physical Work on the site. (See GC-46) A proceed order is a condition precedent to the execution of any Work on the site by the Contractor.", "snippet_links": [{"key": "written-notice", "type": "definition", "offset": [23, 37]}, {"key": "the-owner", "type": "definition", "offset": [43, 52]}, {"key": "pursuant-to", "type": "definition", "offset": [53, 64]}, {"key": "the-contractor-shall", "type": "clause", "offset": [71, 91]}, {"key": "work-on", "type": "definition", "offset": [110, 117]}, {"key": "the-site", "type": "clause", "offset": [118, 126]}, {"key": "condition-precedent", "type": "clause", "offset": [161, 180]}, {"key": "the-execution", "type": "clause", "offset": [184, 197]}, {"key": "by-the-contractor", "type": "clause", "offset": [222, 239]}], "size": 1, "samples": [{"hash": "c8iVTEceF1y", "uri": "/contracts/c8iVTEceF1y#proceed-order", "label": "Indefinite Quantity Construction Contract", "score": 19.6830940247, "published": true}], "hash": "38047252c0eb002f4773e0914e38278e", "id": 9}, {"snippet": "The Construction Professional is authorized to proceed with the Component Change Order Work as of \u00abProcessFields_ProceedOrderDate\u00bb The compensation and time provided for in this Change Order constitute the full and final compensation and time for the Component Change Order Work and accounts for all delays and impacts related thereto. Construction Professional: \u00abProjectCustom_ConstructionProfessionalCP\u00bb By: \u00abProcessFields_CPApprover\u00bb Date: \u00abProcessFields_CPApprDate\u00bb Design Professional: \u00abProjectCustom_DesignProfessional\u00bb By: \u00abProcessFields_Reviewer\u00bb Date: \u00abProcessFields_DateReviewed\u00bb GEORGIA STATE FINANCING AND INVESTMENT COMMISSION By: \u00abProcessFields_GSFICApprover\u00bb Title: \u00abProcessFields_GSFICApproverTitle\u00bb Dated: \u00abProcessFields_CCOExecutionDate\u00bb Distribution: Construction Professional Design Professional Executive Administrator Using Agency GSFIC Project Manager GSFIC CCS", "snippet_links": [{"key": "construction-professional", "type": "definition", "offset": [4, 29]}, {"key": "change-order-work", "type": "definition", "offset": [74, 91]}, {"key": "compensation-and", "type": "clause", "offset": [135, 151]}, {"key": "full-and-final-compensation", "type": "clause", "offset": [206, 233]}, {"key": "work-and", "type": "clause", "offset": [274, 282]}, {"key": "delays-and-impacts", "type": "clause", "offset": [300, 318]}, {"key": "design-professional", "type": "clause", "offset": [470, 489]}, {"key": "investment-commission", "type": "definition", "offset": [618, 639]}, {"key": "executive-administrator", "type": "definition", "offset": [816, 839]}, {"key": "using-agency", "type": "clause", "offset": [840, 852]}, {"key": "project-manager", "type": "clause", "offset": [859, 874]}], "size": 1, "samples": [{"hash": "jrJ1EFHbhub", "uri": "/contracts/jrJ1EFHbhub#proceed-order", "label": "Cm/Gc Contract Forms", "score": 22.5455169678, "published": true}], "hash": "631d6d7a762fa6aa3c0f6f21f334a541", "id": 10}], "next_curs": "ClYSUGoVc35sYXdpbnNpZGVyY29udHJhY3RzcjILEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IhZwcm9jZWVkLW9yZGVyIzAwMDAwMDBhDKIBAmVuGAAgAA==", "clause": {"title": "Proceed Order", "children": [], "size": 140, "parents": [["documents", "Documents"], ["contractors-federal-employment-verification-certification", "Contractor\u2019s Federal Employment Verification Certification"], ["full-agreement", "Full Agreement"], ["contract-forms", "Contract Forms"], ["american-disabilities-act", "American Disabilities Act"]], "id": "proceed-order", "related": [["field-order", "Field Order", "Field Order"], ["proceedings-orders", "Proceedings; Orders", "Proceedings; Orders"], ["final-order", "Final Order", "Final Order"], ["appellate-court-orders-to-vacate-reverse-or-materially-modify-judgment", "Appellate Court Orders to Vacate, Reverse, or Materially Modify Judgment", "Appellate Court Orders to Vacate, Reverse, or Materially Modify Judgment"], ["condemnation-proceedings", "Condemnation Proceedings", "Condemnation Proceedings"]], "related_snippets": [], "updated": "2025-07-26T06:10:51+00:00"}, "json": true, "cursor": ""}}