Preparations/Submittal Clause Samples
Preparations/Submittal. Prior to commencing any removal work, the beds of all hauling vehicles must be measured to determine their fully loaded capacities in cubic yards. The vehicles must be marked externally with the owner/operator’s name, the contract number, vehicle ID number, and the fully loaded capacity. Those markings must be clearly visible on both sides of the vehicle and on the front wall of the bed. All markings must be certified by the Contractor. A list of all vehicles, with the owner/operator’s name, vehicle ID number, and hauling capacity must be submitted to the Director before the vehicles are placed in service. The City shall provide (4) multi-part load tickets for each vehicle at each loading site. The tickets must be signed by the vehicle driver and then presented to the City’s monitor at the designated disposal site.
