PREPARATION FOR PAVING. 1. Contractor to ensure that all paving preparation activities have been approved by the City by noon of the day prior to paving. “Approved by the City” refers to achieving passing results for all base compaction testing, proof rolling, etc., base elevation and grade approval, saw cutting, sweeping, adjusting infrastructure, supply and placement of barricades/signage. Incurred costs related to delays in obtaining paving approval, shall be borne by the Contractor.
AutoNDA by SimpleDocs
PREPARATION FOR PAVING. 1. Contractor to ensure that pathway base has been approved by the City by noon of the day prior to paving. “Approved by the City” refers to all compaction testing, string lining, proof rolling, etc. Any costs, by the City or its paving Contractor, associated with any incurred delays in obtaining the approval to pave shall be borne by the contractor.

Related to PREPARATION FOR PAVING

  • Construction Preparation Period 2.1.3 Construction Management Plan

  • Preparation Period During the preparation period, a teacher will have no other assignment except in an emergency situation. It is recognized that the preparation period is a scheduled part of the teacher's work day and the teacher is expected to be in his/her respective Building. If the teacher must leave the Building during his/her preparation and/or lunch period, he/she must notify the Building switchboard operator.

  • Preparation Awarded vendor shall not begin a project for which TIPS Member has not prepared the site, unless awarded vendor does the preparation work at no cost, or until TIPS Member includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre-installation requirements. Registered sex offender restrictions: For work to be performed at schools, awarded vendor agrees that no employee of a sub-contractor who has been adjudicated to be a registered sex offender will perform work at any time when students are, or reasonably expected to be, present. Awarded vendor agrees that a violation of this condition shall be considered a material breach and may result in the cancellation of the purchase order at the TIPS Member’s discretion. Awarded vendor must identify any additional costs associated with compliance of this term. If no costs are specified, compliance with this term will be provided at no additional charge. Safety measures: Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Planning and Preparation 1. Uses established local and the Core Curriculum Standards and Cumulative Progress Indicators as well as established local and state curriculum objectives in planning lessons.

  • Preparation of Agreement This Agreement shall not be construed more strongly against any party regardless of who is responsible for its preparation. The parties acknowledge each contributed and is equally responsible for its preparation.

  • Preparation and Submission The Recipient will:

  • Preparation Periods 31-1 The School District agrees to maintain daily preparation periods during the student day in all junior and senior high schools. At schools where block scheduling is in effect, the total preparation time provided shall be equal to the preparation time provided at schools not operating on a block schedule.

  • Preparation of Tenders ITT 10 (j) The Tenderer shall submit the following additional documents in its Tender: N/A ITT 12.1 Alternative Tenders shall not be considered.

  • PREPARATION OF BIDS 12 LANGUAGE OF BID

  • Submittal Reports, plans, surveys, field notes, original drawings, computer tapes, graphic files, tracings, calculations, analyses, reports, specifications, data, sketches and/or schematics prepared by A/E and supporting documents (collectively referred to hereinabove and hereinafter as the "A/E Work Product(s)"), shall be submitted by A/E on or before the dates specified for completion, as set out in the Production Schedule set forth in Exhibit C.

Time is Money Join Law Insider Premium to draft better contracts faster.