PRELIMINARY SUBMITTAL Sample Clauses

PRELIMINARY SUBMITTAL by the Tenant shall include storefronts and interiors, plans, elevations, specifications, color and material boards, and a colored elevation of the storefront facade.
AutoNDA by SimpleDocs
PRELIMINARY SUBMITTAL. As the planning process develops, please submit one (1) sepia and six (6) prints in a 24” x 36” format of each of the following:
PRELIMINARY SUBMITTAL. Signifies Submittals of such preliminary nature that a determination of conformance with the design concept or compliance with the intent of the Contract Documents must be deferred until additional information is furnished. Contractor is to submit such additional information to permit layout and related activities to proceed.
PRELIMINARY SUBMITTAL. The Preliminary Submittal shall include preliminary plans, Draft Engineer’s Design Report, Draft CSPP, Draft Drainage Report, Geotechnical Report, and 30% quantities and OPCC. This submittal shall only be submitted to the FAA and Airport.
PRELIMINARY SUBMITTAL the Preliminary Submittal shall include CSPP, 7460, and pavement design. This submittal shall only be submitted to the FAA and Airport.
PRELIMINARY SUBMITTAL. Full Size Half Size Hydraulic Report BCR TS&L Survey Book Check Plots PRE-FINAL UTILITY PLANS Full Size Sets 1 Sets 4 Sets Sets Sets Sets Sets 4 Sets Sets 0 X 0 ; O@ $ 1.00 ; $ 0.00 X 40 ; 40@ $ 1.00 ; $ 40.00 4 X 40 ; 160@ $ 0.75 ; $ 120.00 0 X 0 ; O@ $ 0.10 ; $ 0.00 0 X 0 ; O@ $ 0.10 ; $ 0.00 0 X 0 ; O@ $ 0.10 ; $ 0.00 $ $ 0 X 0 ; O@ $ 0.10 ; $ 0.00 4 X 40 ; 160@ 0.75 ; 120.00 0 X 0 ; O@ $ 1.00 ; $ 0.00 PREFINAL SUBMITTAL Full Size 1 Sets X 40 ; $ 1.00 ; $ 40.00 Half Size Special Provisions FINAL SUBMITTAL Full Size Full Size(Mylar) Half Size Hydraulic Report Special Provisions Quantity Camps Check Plots 4 Sets 4 Sels 3 Sets 1 Sets 4 Sets Sets 4 Sets 2 Sets 2 Sets 40@ 40 4 X ; 160@ $ 0.75 ; $ 120.00 30 4 X ; 120@ $ 0.10 ; $ 12.00 3 X 40 ; 120@ $ 1.00 ; $ 120.00 1 X 5 ; 5@ $ 10.00 ; $ 50.00 4 X 40 ; 160@ $ 0.75 ; $ 120.00 0 X 0 ; O@ $ 0.10 ; $ 0.00 $ 4 X 30 ; 120@ $ 0.10 ; $ 12.00 $ $ 2 X 50 ; 100@ $ 0.10 = 10.00 40 2 X = 80@ 0.75 = 60.00 MEETINGS/MISCELLANEOUS TRAVEL Lunch 1 mtgs 2 People Mileage 1 trips 40 miles/trip FIELD CHECK Breakfast meals People Lunch 1 meals 2 People Dinner meals People Lodging room Nights MISCELLANEOUS Maps (USGS, Xxxxxxx, etc.) (Estimated) Photographs 20 photographs F:\tDOT\ManhoUfs\06001\06001 xxxxxxx xxxxxx drive direct cost 012706.xfs 2 of 3 2@ $ 6.50 = $ 13.00 40@ $ 0.375 = $ 15.00 O@ $ 6.50 = $ 0.00 2@ $ 6.50 = $ 13.00 O@ $ 18.00 ; $ 0.00 O@ $ 70.00 = $ 0.00 $ 20@ $ 1.00 = $ 20.00
PRELIMINARY SUBMITTAL. Tenant shall submit to Landlord an electronic Preliminary Submittal (PDF format): Floor Plan, at 1/4” = 1’-0” scale Reflected Ceiling Plan, at 1/4” = 1’-0” scale Entry Elevation, at 1/4” = 1’-0” scale Mechanical Plan, at 1/4” = 1’0” scale Finish Schedule with Color Samples The purpose of the Preliminary Submittal is to determine general conformity with the design criteria. An electronic set of drawings, with Landlord’s preliminary notes, shall be returned to Tenant. In the event of any changes, additional preliminary drawings may be required. Should the drawing not meet Landlord’s minimum requirements or industry standards, new drawings shall be required.
AutoNDA by SimpleDocs
PRELIMINARY SUBMITTAL. 3 7.2 FINAL SUBMITTAL:.................................................3 7.3 AS-BUILT SUBMITTAL:..............................................4
PRELIMINARY SUBMITTAL. Prospective BMS/ATC Contractors shall submit for review by the Owner's authorized representatives a preliminary written description of his proposed BMS/ATC systems, including block diagrams showing all major components and panels, printers and other processing devices and required cabling between each. Include environmental and space requirements for panels, CPU's and other major devices.
PRELIMINARY SUBMITTAL. Within ten (10) business days after receipt of the Preliminary Submittal, Landlord shall notify Tenant of any conflicts with Landlord's Building Plans or the Work Letter or any other failure to meet with Landlord's approval. Tenant shall, not later than May 1, 1996, submit "FINAL CONSTRUCTION DOCUMENTS" based upon the Preliminary Submittal and incorporating Landlord's comments thereto. Landlord shall notify Tenant of its approval or disapproval of the Final Construction Documents within ten (10) days after receipt. Upon approval, Landlord shall return one ( 1 ) set of approved Final Construction Documents to Tenant and the same shall become a part hereof by this reference as Exhibit "B-2". Approval of construction documents by Landlord shall not constitute the assumption of any responsibility by Landlord for their accuracy or sufficiency, or compliance with applicable codes, and Tenant shall be solely responsible for such construction documents and for obtaining all governmental approvals which are required for Tenant's Work. Tenant shall not commence any of Tenant's Work until Landlord has approved Tenant's Final Construction Drawings in writing.
Time is Money Join Law Insider Premium to draft better contracts faster.