Preliminary Construction Sequence and Traffic Control Plans. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design. The Engineer shall prepare preliminary Traffic Control Plans (TCP) including TCP typical sections and cross sections for the different phases, for the project. The Engineer shall complete Form 2229- Significant Project Procedures along with Page 4 of Form 1002, specifically titled Accelerated Construction Procedures. A detailed preliminary TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall interface and coordinate phases of work, including the TCP, with adjacent Engineers. The Engineer shall:
AutoNDA by SimpleDocs
Preliminary Construction Sequence and Traffic Control Plans. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design. The Engineer shall provide preliminary traffic control plans and traffic control plan cross-sections in roll plot format.
Preliminary Construction Sequence and Traffic Control Plans. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the TCP phasing, TCP Typical Sections, traffic detours and TCP cross sections for the different phases anticipated to construct the proposed design. The Preliminary Construction Sequence must be developed in accordance with the latest edition of the TMUTCD.
Preliminary Construction Sequence and Traffic Control Plans. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design. The Engineer shall prepare Traffic Control Plans (TCP) including TCP typical sections and cross sections for the different phases, for the project. The Engineer DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 shall complete Form 2229-Significant Project Procedures along with Page 4 of Form 1002, specifically titled Accelerated Construction Procedures. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall interface and coordinate phases of work, including the TCP, with adjacent Engineers. The Engineer shall:
Preliminary Construction Sequence and Traffic Control Plans. The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic using OpenRoads SS4 technology depicting the phasing and traffic detours anticipated to construct the proposed design. The Engineer shall develop in roll plot format, a TCP phasing concept layout, and significant project procedures form (State Form 2229) to present at the DSRT for the State review. The TCP Concept layout shall depict the phasing and traffic detours anticipated to construct the proposed design of the schematic refinements. The Engineer shall consider the requirements for construction and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The construction sequencing plan will be coordinated with DocuSign Envelope ID: 67397975-F81B-4755-90E3-12120FAB096F the proposed paving, drainage, and existing and proposed utility locations, structures, signalized intersections, pedestrian pathways and sidewalks. The Engineer shall submit the preliminary construction sequencing plan to the State for review and approval. Up to two alternate sequencing plans/phasing layouts will be prepared for consideration if required.

Related to Preliminary Construction Sequence and Traffic Control Plans

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • DISTRIBUTION OF CONTRACTOR PRICE LIST AND CONTRACT APPENDICES Contractor shall provide Authorized Users with electronic copies of the Contract, including price lists and Appendices, upon request. OGS CENTRALIZED CONTRACT MODIFICATIONS Contract Updates will be handled as provided in Appendix C – Contract Modification Procedures.

  • Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following:

  • FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES IN FULL TEXT 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

  • Building and Construction Industry Security of Payment Act 1999 (NSW);

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • CONSTRUCTION/PUBLIC WORKS CONTRACTS In compliance with Article 8, Section 220 of the New York State Labor Law: