POWER MEASUREMENTS Sample Clauses

POWER MEASUREMENTS. Net plant electrical output will be measured using the Utility (Georgia Transmission Corporation) kilowatt-hour meters on the high side of the generator step-up transformers. Auxiliary power will be calculated for use in the plant corrections and will be measured as a backup on the low side of the auxiliary transformer. Individual gas turbine power output will be measured for use in plant corrections.
AutoNDA by SimpleDocs
POWER MEASUREMENTS. Once the Redfish interface (Work Package 4) has been implemented it will be possible to carefully measure power fluctuations when switching between CPU, FPGA and ARM. At this point the power savings gained from using different elements of the system can be carefully measured. 5 INTEGRATION INTO MOONSHOT SERVER Figure 14 : SOC Accelerator integrated into Moonshot server Figure 14 and Figure 15 shows the SOC Accelerator integrated into the Moonshot server. The two optical connections can be seen connected to the rear of the card. Figure 15 : SOC Accelerator alternative view No issues were discovered when installing the SOC accelerator into the Moonshot server.

Related to POWER MEASUREMENTS

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Interactive Data The interactive data in eXtensible Business Reporting Language included as an exhibit to the Registration Statement or incorporated by reference in the Registration Statement fairly presents the information called for in all material respects and has been prepared in accordance with the Commission’s rules and guidelines applicable thereto.

  • Measurement and Monitoring Tools Contractor shall implement measurement and monitoring tools and procedures reasonably designed to measure its performance of the Services and assess such performance against any applicable service levels. Contractor shall provide LAUSD with a monthly report of service level performance under any applicable Work Order. Upon LAUSD’s request, Contractor shall provide LAUSD with access to the measurement and monitoring tools described herein, and to any information that they generate.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.