Power and Weight Sample Clauses

Power and Weight. The power and weight for each component of the Equipment are included in the Specifications set forth in Exhibit C. [***]
AutoNDA by SimpleDocs
Power and Weight. If ORBCOMM agrees to accept Additional Payloads that exceed the maximum operating power and/or weight limits set forth in the Specifications, then Orbital shall pay ORBCOMM as compensation therefor, $10,000 per Kg in excess of 20.31 Kg (inclusive of 1kg grace) for the total Additional Payload mass as set forth in Section 4.5.4 of the Specifications and $10,000 per 5 xxxxx in excess of 120 xxxxx (inclusive of 5 xxxxx xxxxx) of total Additional Payload power as set forth in Section 4.5.5 of the Specifications, in each case per Additional Payload, and in each case pro rated for partial amounts in excess of such maximum weight and/or power. The maximum payment that shall be paid for exceeding the power and/or weight limits shall not exceed $100,000.
Power and Weight. The power and weight for each component of the Equipment for ATG/ATG4 and Ku are included in the Specifications set forth in Exhibit C, which will be amended to include the specifications of any other Technology Type that American elects to purchase hereunder. Gogo commits that the power and weight of the Equipment in its original design shall remain within + 10% of the applicable system power and weights listed in Exhibit C. [***].
Power and Weight. The power and weight for each component of the Equipment for ATG/ATG4 and Ku are included in the Specifications set forth in Exhibit C, which will be amended to include the specifications of any other Technology Type that American elects to purchase hereunder. Gogo commits that the power and weight of the Equipment in its original design shall remain within + 10% of the applicable system power and weights listed in Exhibit C. [***]. American Airlines Inc. and Gogo LLC Confidential and Proprietary Information

Related to Power and Weight

  • Power and Capacity Each Shareholder has the power, authority and capacity to enter into this Agreement and to consummate the transactions contemplated hereby. This Agreement constitutes each Shareholders’s valid, legal and binding obligation and is enforceable against such Shareholder in accordance with its terms, subject, however, as to enforcement, to bankruptcy, insolvency, fraudulent transfer, moratorium and similar laws of general applicability relating to or affecting creditors’ rights; SUNO — Corporate Status and Capacity

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Air and Water Subrecipient agrees to comply with the following regulations in so far as they apply to the performance of this Contract: Clean Air Act, 42 U.S.C., 1857, et seq. Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251, et seq. Environmental Protection Agency (EPA) regulations pursuant to 00 XXX 00 xxx 00 XXX 00.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.