POSCO Power Sample Clauses

POSCO Power. POSCO Affiliates shall provide on a quarterly basis a Work Progress Summary outlining activities and deliverables completed or ongoing from the prior reporting period.
AutoNDA by SimpleDocs

Related to POSCO Power

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Initiating Interconnection 4.1 If CBB determines to offer Telephone Exchange Services and to interconnect with Verizon in any LATA in which Verizon also offers Telephone Exchange Services and in which the Parties are not already interconnected pursuant to this Agreement, CBB shall provide written notice to Verizon of the need to establish Interconnection in such LATA pursuant to this Agreement.

  • COVID-19 Residents acknowledge that in March 2020 the World Health Organization declared a global pandemic of the virus leading to COVID-19. The Governments of Canada, the Province of Ontario, and local Governments responded to the pandemic with legislative amendments, controls, orders, by-laws, requests of the public, and requests and requirements to Humber (collectively, the “Directives”). It is uncertain how long the pandemic, and the related Directives, will continue, and it is unknown whether there may be a resurgence of the virus leading to COVID-19 or any mutation thereof (collectively, “COVID- 19”). Without limiting the generality of the foregoing paragraph, Humber shall not be held legally responsible or be deemed to be in breach of this Agreement for any damages or loss arising out of or caused by:

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • California Independent System Operator Corporation a California nonprofit public benefit corporation having a principal executive office located at such place in the State of California as the CAISO Governing Board may from time to time designate (the “CAISO”).

Time is Money Join Law Insider Premium to draft better contracts faster.