Plant Efficiency Sample Clauses

Plant Efficiency. For the coal gas production capacity as specified under 1 the following values, based upon the Kellingley reference coal will be applicable:- • The cold gas efficiency will not be less than 85% based on HHV. • The cold gas efficiency is defined as potential heat in the cooled crude gas divided by the potential heat in the raw coal, all based on HHV. • Oxygen (as 100%) consumption, will not be in excess of 222,000 standard cubic feet per hour.
AutoNDA by SimpleDocs
Plant Efficiency. The efficiency of the combined cycle system is defined as the electrical energy produced plus the heat to process energy produced all divided by the heat consumption of the gas turbines.

Related to Plant Efficiency

  • Energy Efficiency The contractor shall comply with all mandatory standards and policies relating to energy efficiency which are contained in the energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub.L. 94-163) for the State in which the work under this contract is performed.

  • PRODUCTIVITY The Productivity Scheme which was agreed to is: Contained in Annexure B.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Productivity Allowance A productivity allowance per hour worked will be paid to employees engaged upon construction work from the date of agreement. This allowance will not be subject to penalty addition and shall be in lieu of all or any Parent Award disability allowances, with the exception of the multi-storey allowance. Site/Project Allowances will be paid in addition to the productivity allowance where such an addition is either:

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • The Performance Improvement Process (a) The Performance Improvement Process will focus on the risks of non- performance and problem-solving. It may include one or more of the following actions:

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Commercial Operation On or before December 31, 2023, Interconnection Customer must demonstrate commercial operation of all generating units. Demonstrating commercial operation includes achieving Initial Operation in accordance with Section 1.4 of Appendix 2 to this ISA and making commercial sales or use of energy, as well as, if applicable, obtaining capacity qualification in accordance with the requirements of the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region.

Time is Money Join Law Insider Premium to draft better contracts faster.