Plant Capacity/Design Criteria Sample Clauses

Plant Capacity/Design Criteria a. The Ethanol Plant shall be a new, dry mill fuel grade ethanol plant, with a nameplate capacity of 50 MMGPY of denatured fuel grade ethanol minimally meeting ASTM 4806 specifications b. The design criteria shall be minimally 110% of the nameplate capacity in all areas of the Ethanol Plant except for utilities or as otherwise stated on this Exhibit D c. The Ethanol Plant shall include the following items to accommodate expansion of capacity of Ethanol Plant to 100 MMGPY: higher building height (of at least 3') to accommodate an additional level in the main pipe rack; site layout will show expanded plant as dotted lines.
AutoNDA by SimpleDocs

Related to Plant Capacity/Design Criteria

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity and aircraft type.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Work Load The professional obligation of academic employees comprises both scheduled and non-scheduled activities. The Guild and the District recognize that it is part of the professional responsibility of faculty to carry out their duties in an appropriate manner and place. As part of this responsibility faculty are expected to play an important role in the recruitment and retention of students, campus and departmental governance, program review, accreditation, planning and mentoring. Faculty commitment to retention will be demonstrated by informing students that they are to talk with the instructor prior to dropping the course. Faculty are encouraged to include a statement to this effect in their course syllabi. While it is understood that course syllabi content falls within the purview of the individual faculty member’s academic freedom, the parties also understand that items required to be part of syllabi in order to maintain college or continuing education accreditation must also be included. Tenured/tenure-track faculty who have less than a full-time contract are not eligible to work any additional assignments including long-term substitution (day-to-day substitution is allowed provided the limits specified in Section 5.2.1.3 are not exceeded). Faculty assignments shall be made in the following priority order: Tenured/tenure-track, pro- rata, overload, Priority of Assignment (POA) adjunct faculty assignments, then non-POA adjunct faculty.

  • Contract Capacity The capacity of the Project at any time shall be the lower of the following: (A) the contract capacity in MW designated in the Cover Sheet or (B) the Net Rated Output Capacity of the Project (the “Contract Capacity”). Throughout the Delivery Term, Seller shall sell all Product produced by the Project solely to Buyer. In no event shall Buyer be obligated to receive, in any Settlement Interval, any Surplus Delivered Energy. Seller shall not receive payment for any Surplus Delivered Energy. To the extent Seller delivers Surplus Delivered Energy to the Delivery Point in a Settlement Interval in which the Real-Time Price for the applicable PNode is negative, Seller shall pay Buyer an amount equal to the Surplus Delivered Energy (in MWh) during such Settlement Interval, multiplied by the absolute value of the Real-Time Price per MWh for such Settlement Interval.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization. Measures: • Multiple authorization levels are used when granting access to sensitive systems, including those storing and processing Personal Data. Authorizations are managed via defined processes according to the SAP Security Policy • All personnel access SAP’s systems with a unique identifier (user ID). • SAP has procedures in place so that requested authorization changes are implemented only in accordance with the SAP Security Policy (for example, no rights are granted without authorization). In case personnel leaves the company, their access rights are revoked. • SAP has established a password policy that prohibits the sharing of passwords, governs responses to password disclosure, and requires passwords to be changed on a regular basis and default passwords to be altered. Personalized user IDs are assigned for authentication. All passwords must fulfill defined minimum requirements and are stored in encrypted form. In the case of domain passwords, the system forces a password change every six months in compliance with the requirements for complex passwords. Each computer has a password-protected screensaver. • The company network is protected from the public network by firewalls. • SAP uses up–to-date antivirus software at access points to the company network (for e-mail accounts), as well as on all file servers and all workstations. • Security patch management is implemented to provide regular and periodic deployment of relevant security updates. Full remote access to SAP’s corporate network and critical infrastructure is protected by strong authentication.