Pit dewatering Sample Clauses

Pit dewatering. Pit dewatering including pumping or other diversion of surface water and rain run-off water to a location designated by Owner. Any dewatering of underground water or construction of sediment control structures which may be required under this Agreement shall be the responsibility of Owner or shall be performed by Contractor as Other Work, according to Owner's direction. Contractor shall maintain drainage control around the pit to minimize runoff that enters the pit and erosion of areas around the pit.
AutoNDA by SimpleDocs
Pit dewatering. The Valmy, Mud, and New Millennium pits have been designed to not intercept modeled groundwater surface levels (Piteau 2021a, 2022). MMC would continue to conduct ongoing monitoring of groundwater levels in the area, but no additional dewatering beyond what has been previously authorized at the Marigold Mine is anticipated. MMC proposes to mine the New Millennium Pit to 5,080 feet above mean sea level (AMSL), which is below the previously identified pre-1992 groundwater level but above the more recently identified groundwater level. The pre-1992 groundwater level includes the estimated groundwater level prior to Lone Tree Mine dewatering and the expected groundwater level after Lone Tree Mine dewatering recovery. Recent data indicates that water levels at the New Millennium Pit are lower than previously identified and current groundwater levels appear unaffected by Lone Tree and previously authorized Marigold Mine dewatering activities (Piteau 2022). MMC proposes to mine the New Millennium Pit at least 50 feet above the naturally occurring groundwater level.

Related to Pit dewatering

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Catering The IU Auditorium staff may suggest caterers for your event; however, the Licensee will be responsible for paying all catering costs in a timely manner. All caterers in the IU Auditorium must be pre-approved by Auditorium Management and possess all valid Indiana licenses for food service and the service of alcoholic beverages (if applicable). The caterer must carry commercial general and auto liability insurance, including a products-completed operations endorsement, with minimum limits of $1,000,000 per occurrence / $2,000,000 Aggregate. Licensee must be in compliance with all other university regulations regarding food service including, but not limited to, completing the University Office of Environmental Health & Safety’s Temporary Food Service application. In addition, “The Trustees of Indiana University, its officers, agents and employees” must be named as an additional insured on the Certificate of Insurance for both Commercial General Liability and Automobile Liability coverage. The Certificate of Insurance must be submitted to Indiana University for review and approval at least fourteen (14) working days prior to the scheduled date of the event. If Licensee’s vendor/caterer fails to comply with any of the requirements described in this section, the vendor/caterer will not be permitted to serve food or alcohol at the Event and Licensor shall not be responsible for any losses incurred by Licensee or Licensee’s subcontractors as a result of such cancellation. Stage Labor The Auditorium Production Stage Manager and the Licensee in conjunction with the Auditorium Management shall determine the number of employees necessary for the call. Manpower must be maintained until such time as work in all departments is fully completed. All requests for manpower must be submitted in writing forty-eight (48) hours prior to load-in. Indiana University Auditorium is under contract with IATSE Local #618. Licensee agrees to abide by the rules of this agreement governing stage labor. IU Auditorium Facility Usage Policies It is further agreed and understood that all of the Facility Usage Policies including all addenda published by the date of this Agreement are hereby incorporated as part of this contract and the Licensee has received a copy of the Indiana University Auditorium Facility and General Information. Please initial here: Sound System If sound equipment is carried by the performing company, artist, or conference, the Indiana University Auditorium Production Stage Manager, after consultation with representatives of the company, may permit use of the company's equipment in conjunction with the house system. If Licensee is to mix sound system from the road sound mixing position, mixing stacks and/or equipment to be no higher than forty-eight (48) inches from the floor. Front Lighting There are no balcony rail house lighting positions in the Indiana University Auditorium.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.