PAYMENT FOR REINFORCEMENT WORK Clause Samples

The 'Payment for Reinforcement Work' clause defines the terms under which a contractor is compensated for additional reinforcement work performed beyond the original contract scope. Typically, this clause outlines how such work is identified, measured, and valued, often requiring prior approval or documentation before payment is authorized. Its core function is to ensure that contractors are fairly compensated for extra reinforcement tasks, preventing disputes over payment and clarifying the process for handling changes in project requirements.
POPULAR SAMPLE Copied 2 times
PAYMENT FOR REINFORCEMENT WORK. For purpose of payment, all the steel provided in accordance with the drawings shall be measured and paid for including hooks, laps, separations, cranks etc. However, no payment shall be made for binding wires. Chairs when shown on drawings and/or when specifically instructed at site to provide shall be paid for as per actual weight in the reinforcement item. The dowels shown on the drawings or instructed to be provided by the Engineer shall also be measured and paid for at the unit rate quoted. The rate quoted shall include applying two coats of Bitumastic paint on dowels and wrapping them with burlap. The unit rate shall be irrespective of the level or the height at which work is done. Steel reinforcement shall be measured in Kg. based on total computed weight for the size and length of bars as shown on drawings or as instructed by Engineer. The weight of bars will be computed from theoretical weight for the respective sizes as shown in para 2.7.3 above. The laps will be given as under: i) at the places shown in the drawing ii) at the places where lap is provided as per the instruction of Engineer. iii) at the places where the length of bar is more than 9 mtrs. iv) in case of columns at each floor height. Where floor height is more than 5.0 m, lap to be provided as per instruction of the Consultant.