Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 183 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

AutoNDA by SimpleDocs

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control areaCAISO Balancing Authority Area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or CAISO Tariff for the Connecting Transmission Owner’s tariffCAISO Controlled Grid and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 38 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff or ISO Procedures or by the Connecting Transmission Owner’s tariff; (2applicable system operator(s) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of for the Transmission Provider's Transmission System or Distribution Systemand; and (32) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 28 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 21 contracts

Samples: Service Agreement, Service Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: ; (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 16 contracts

Samples: Small Generator Interconnection Agreement, Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (1) to the rules ISO New England Operating Documents, and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 13 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control areaControl Area, including, but not limited to: (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 12 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control areaCAISO Balancing Authority Area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or CAISO Tariff for the Connecting Transmission Owner’s tariffCAISO Controlled Grid and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 11 contracts

Samples: Interconnection Agreement, Generator Interconnection Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (1) the any rules and procedures concerning the operation of generation set forth in the NYISO Commission-approved tariffs or ISO Procedures or by the Connecting Transmission Ownerapplicable system operator(s) for the Utility’s tariffSystem and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment Appendix 5 of this Agreement.

Appears in 10 contracts

Samples: Agreement, Agreement, Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff and / or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of by the Transmission Owner for the Transmission Provider’s Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.and;

Appears in 9 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff or ISO Procedures or by the Connecting Transmission Owner’s tariffapplicable system operator(s) for the Distribution Provider's Distribution System and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 8 contracts

Samples: Service Agreement, Service Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the The Interconnection Customer shall continue to abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff and / or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of by the Transmission Owner for the Transmission Provider’s Transmission System or Distribution Systemand; and (32) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 8 contracts

Samples: Interconnection Agreement, Service Agreement, Service Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff or ISO Procedures or by the Connecting Transmission Owner’s tariffapplicable system operator(s) for the Distribution Provider's Distribution System and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 7 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Service Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff and / or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of by the Transmission Owner for the Transmission Provider's Transmission System or Distribution Systemand; and (32) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 6 contracts

Samples: Small Generator Interconnection Agreement, Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized by the Distribution Provider to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff or ISO Procedures or by the Connecting applicable system operator(s) for the Distribution Provider's Distribution and Transmission Owner’s tariffSystems and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 3 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the The Interconnection Customer shall continue to abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff and / or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of by the Transmission Owner for the Transmission Provider’s Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.and;

Appears in 3 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: ; (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 3 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff and / or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of by the Transmission Owner for the Transmission Provider’s Transmission System or Distribution Systemand; and (32) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control areaISO Control Area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or Tariff for the Connecting Transmission Owner’s tariffISO Controlled Grid and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 2 contracts

Samples: Small Generator Interconnection Agreement, Agreement

Parallel Operation Obligations. In Process Once the Small Generating Facility has been authorized by the Distribution Provider to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff or ISO Procedures or by the Connecting applicable system operator(s) for the Distribution Provider's Distribution and Transmission Owner’s tariffSystems and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 2 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 55 of this Agreement.

Appears in 1 contract

Samples: Service Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable CAISO Balancing Authority Areaapplicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs CAISO Tariff or ISO Procedures or by the Connecting Transmission Owner’s tariffapplicable system operator(s) for the CAISO Controlled GridDistribution Provider's Distribution System and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 1 contract

Samples: Limitations of Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized by the Distribution Provider to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control controlbalancing authority area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs TariffRule 21 or ISO Procedures or by the Connecting applicable system operator(s) for the Distribution Provider's Distribution and Transmission Owner’s tariffSystems and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 1 contract

Samples: Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control areaISO cControl aArea, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs ISO Tariff or by the applicable system operator(s) for the ISO Procedures or the Connecting Controlled Grid Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Provider's Transmission System or Distribution Systemand; and (32) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 1 contract

Samples: Small Generator Interconnection Agreement

Parallel Operation Obligations. ‌‌ Once the Small Generating Facility has been authorized by the Distribution Provider to commence ommence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (; 1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs Tariff or ISO Procedures or by the Connecting applicable system operator(s) for the Distribution Provider's Distribution and Transmission Owner’s tariffSystems and; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 1 contract

Samples: Interconnection Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited SERVICE AGREEMENT NO. 2624 to: (1) the rules and procedures concerning the operation of generation set forth in the NYISO tariffs or ISO Procedures or the Connecting Transmission Owner’s tariff; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment 5 of this Agreement.

Appears in 1 contract

Samples: Service Agreement

Parallel Operation Obligations. Once the Small Generating Facility has been authorized to commence parallel operation, the Interconnection Customer shall abide by all rules and procedures pertaining to the parallel operation of the Small Generating Facility in the applicable control area, including, but not limited to: (1) the any rules and procedures concerning the operation of generation set forth in the NYISO Town approved tariffs or ISO Procedures in the Wholesale Provider’s policy and guidelines for Distributed Generation or the Connecting Transmission Owner’s tariffLoad-Side Generation; (2) any requirements consistent with Good Utility Practice or that are necessary to ensure the safe and reliable operation of the Transmission System or Distribution System; and (3) the Operating Requirements set forth in Attachment Appendix 5 of this Agreement; and 3) applicable NERC and SERC standards.

Appears in 1 contract

Samples: Interconnection Agreement