Overhead Doors Sample Clauses

Overhead Doors. All overhead doors shall remain closed unless ingress or egress is in progress, except between the hours of 9:00 a.m. and 4:00 p.m. Monday through Saturday. R
AutoNDA by SimpleDocs
Overhead Doors. A. Provide metal high lift sectional doors with insulation inserts and metal covers.
Overhead Doors. Lessor warrants overhead doors to be in proper working order at the time of occupancy. Notwithstanding any warranties by the overhead door manufacturer, Lessee hereby agrees to maintain, in proper working order during the term of the lease, the overhead doors, and all associated hardware, brackets and mechanisms associated with their operation. Lessor shall have no responsibility to repair, replace or maintain the overhead doors. Lessee also warrants that said overhead doors shall be in proper working order at such time as Lessee vacates the Premises.
Overhead Doors. The following assumptions further define the scope of work and value as indicated in the documents listed below. StadCo Assumptions
Overhead Doors. 1) Two exterior insulated sectional doors will be provided.
Overhead Doors. The Contractor shall develop and implement a PM program for overhead doors and associated equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life. The PM program shall provide an economical approach, manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep overhead doors in normal working condition. As part of the PM, fire doors shall be tested in accordance with UFC 3-601-02. Testing results shall be documented on the PM report. Replacement of fusible links, if required, shall be included as part of the PM. The overhead door inventories are provided in J-1502000-07. Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule. PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Overhead Doors. Overhead doors shall be insulated steel sectional doors with high lift track and, weatherstripping. 14' x 16' overhead door shall have motor operation. 8' x 9' overhead door shall be manually operated.
AutoNDA by SimpleDocs
Overhead Doors. Match the existing building overhead doors. If no O.H. doors exist, use Overhead Door Company or equal with 3" track 20 gauge door vertical reinforced bottom rail, with step plate flush panel sectional. Saw a licensed structural engineer must certify cutting at exterior concrete panels. No overcuts will be allowed.
Overhead Doors. Lessee may, at Lessee's expense, modify (to enlarge) the overhead doors on the west side of the Building, as shown on Exhibit "A".
Overhead Doors. A. The overhead doors shall be counterbalanced and have a baked on white enamel prime finish.
Time is Money Join Law Insider Premium to draft better contracts faster.