Outage Scheduling Sample Clauses

Outage Scheduling. The Office of the Interconnection shall be responsible for coordinating and approving requests for outages of generation and transmission facilities as necessary for the reliable operation of the PJM Control Area, in accordance with the PJM Manuals. The Office of the Interconnection shall maintain records of outages and outage requests of these facilities.
AutoNDA by SimpleDocs
Outage Scheduling. 21.1 Supplier shall request Buyer's approval prior to any inspections, proposed planned outages or other non-forced outages (all hereinafter referred to as "planned outages") of the Asset Bundle so as to minimize the impact on the availability of the Asset Bundle. Under no circumstances shall Supplier conduct a planned outage without the express prior consent of Buyer pursuant to this Section 21.
Outage Scheduling. 30 22. REPORTS.................................................................................................32 23. COMMUNICATIONS..........................................................................................32 24. NOTICES.................................................................................................33 25. MERGER..................................................................................................34 26. HEADINGS................................................................................................34 27.
Outage Scheduling. On or before January 1st of each year, or such other date mutually acceptable to the Operating Agent and Generator, each of the foregoing shall, subject to Article 3.7, provide to the other a non-binding preliminary maintenance schedule for the upcoming calendar year for the Lxxx Substation, the Lxxx Interconnection Facilities and
Outage Scheduling. Unless otherwise directed by PECO, SELLER shall periodically submit for PECO's approval, such approval not to be unreasonably withheld, its planned maintenance schedule conforming to Section 6.5 hereof, for the subsequent thirty-six (36) months of operation. SELLER shall revise its planned and maintenance outage dates upon PECO's request for such changes.
Outage Scheduling. 22.1 Buyer acknowledges that Supplier may not be the operator of the Asset Bundle and may not have direct control over the operation of the Asset Bundle.
Outage Scheduling. On or before January 1st of each year, or such other date mutually acceptable to the Operating Agent and Generator, each of the foregoing shall, subject to Article 3.7, provide to the other a non-binding preliminary maintenance schedule for the upcoming calendar year for the EPE Interconnection Facilities, including the Afton Switching Station, and Facility. The Operating Agent and Generator shall, subject to -------------------------------------------------------------------------------- Interconnection Agreement between -34- EXECUTION VERSION El Paso Electric Company and Public Service Company of New Mexico
AutoNDA by SimpleDocs
Outage Scheduling. Genco shall undertake to schedule and/or adjust outages in the sources of generating capacity for a Contract Year in accordance with Prudent Utility Practice and so as to minimize outages during the Summer Months.
Outage Scheduling. MTI shall not permit any employee, contractor or subcontractor or any employee of any contractor of subcontractor, to commence any construction, maintenance, repair or relocation of work until satisfactory arrangements, including coordination of work, construction schedules and outages, have been made with APS. When APS determines in its sole discretion that it is necessary to de-energize any of its facilities in order for work to commence, MTI shall not permit work to commence until such facilities have been de-energized.

Related to Outage Scheduling

  • Overtime Scheduling (A) It is the intent of the City, consistent with efficient and effective operation of the Division of Police, to distribute in an equitable manner, all pre-scheduled overtime among all members. Recognition will be given to the qualifications of the members and the requirements placed on the City by any third party funding sources. Any complaints by members that pre-scheduled overtime is not being equitably distributed among all qualified members as described above may be brought by the Lodge directly to the Chief's attention at Step 3 of the Grievance Procedure and shall also be a proper subject for discussion in a Labor Relations Committee meeting. Inability to work a prescheduled overtime assignment due to illness or death in the family or injury will not require the member to charge such absence against sick leave or injury leave.

  • Work Scheduling Except at the request of an affected employee, no employee shall have the number of hours they are normally scheduled to work reduced as the result of the use of non-permanent employees such as, but not limited to: seasonal, intermittent, student interns, interns, interim, established term, or temporary employees, due to the performance of such employee’s duties by the nonpermanent employee.

  • Outage Schedules The Connecting Transmission Owner shall post scheduled outages of its transmission facilities on the NYISO OASIS. Developer shall submit its planned maintenance schedules for the Large Generating Facility to Connecting Transmission Owner and NYISO for a minimum of a rolling thirty-six month period. Developer shall update its planned maintenance schedules as necessary. NYISO may direct, or the Connecting Transmission Owner may request, Developer to reschedule its maintenance as necessary to maintain the reliability of the New York State Transmission System. Compensation to Developer for any additional direct costs that the Developer incurs as a result of rescheduling maintenance, including any additional overtime, breaking of maintenance contracts or other costs above and beyond the cost the Developer would have incurred absent the request to reschedule maintenance, shall be in accordance with the NYISO OATT. Developer will not be eligible to receive compensation, if during the twelve (12) months prior to the date of the scheduled maintenance, the Developer had modified its schedule of maintenance activities other than at the direction of the NYISO or request of the Connecting Transmission Owner.

  • Part-time Scheduling Subject to Section B of this Article, the Employer and the Association endorse the principle that less than full time equivalent ("FTE") positions shall, within reason, be expected to work a biweekly work period that equates to an eighty (80) hour work period multiplied by the position's FTE. (e.g., 80 hours @ .75 = 60 hours). It is further understood by both parties that ASF Members assigned to less than a FTE position may be required, during the peak work periods, to exceed their normal biweekly work period. FLSA non-exempt ASF Members who work a part-time schedule will earn overtime for hours worked in excess of forty (40) in a work week. The Employer agrees to review any ASF position that is less than one (1) FTE if the Association can demonstrate that the position has regularly been required to work a work period that substantially exceeds the normal work period as defined above, and adjust the FTE of the respective position as deemed appropriate by the Employer.

  • Scheduling i) The designated employer will provide the employee with their schedule of shifts in accordance with the collective agreement for both homes. [Insert the split/sharing of shift numbers here] Similarly, the employee will submit all requests for time off including vacation to the designated employer in accordance with the collective agreement.

  • Self Scheduling The Home and the Union may agree to implement a self-scheduling process. Self-scheduling is the mechanism by which employees in a Home create their own work schedules. The purpose of self scheduling is to improve job satisfaction and quality of work life for the participating employees. Self scheduling requires a collaboration of employees and management to ensure proper coverage of the Home and to meet the provisions of the Collective Agreement. It is agreed that self scheduling will be negotiated locally by the Home and the Union and will include a trial period. Each Home must have the majority agreement of the full-time and part-time employees who vote on the issue to agree on a trial period of up to six months. Once the trial period is complete, each Home must have a minimum of 66⅔% agreement of the full-time and part-time employees who vote on the issue to continue with the new schedule on a permanent basis.

  • Scheduling of Work Subcontractor shall provide Contractor with scheduling information and a proposed schedule for performance of the Subcontract Work consistent with the Progress Schedule and in a form acceptable to Contractor. Subcontractor shall comply with the Progress Schedule including, but not specifically limited to, commencement, duration, and sequencing of activities. Contractor shall reasonably cooperate with the Subcontractor in scheduling the Subcontract Work and shall attempt, as reasonably possible, to avoid conflicts or interference with the Subcontract Work.

  • Outages 9.7.1.1 Outage Authority and Coordination. Interconnection Customer and Transmission Owner may each in accordance with Good Utility Practice in coordination with the other Party and Transmission Provider remove from service any of its respective Interconnection Facilities, System Protection Facilities, Network Upgrades, System Protection Facilities or Distribution Upgrades that may impact the other Party’s facilities as necessary to perform maintenance or testing or to install or replace equipment. Absent an Emergency Condition, the Party scheduling a removal of such facility(ies) from service will use Reasonable Efforts to notify one another and schedule such removal on a date and time mutually acceptable to the Parties. In all circumstances, any Party planning to remove such facility(ies) from service shall use Reasonable Efforts to minimize the effect on the other Parties of such removal.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

  • Commissioning Commissioning tests of the Interconnection Member’s installed equipment shall be performed pursuant to applicable codes and standards. The Cooperative must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.