Other Augments. 8.2.5.1 Other augments such as power requests that exceed current capacity ratings, additional bay spaces, AT&T-13STATE bays, AT&T-13STATE cable racks and/or cage expansions within Active Collocation Space different than described above will require the Collocator to submit an inquiry for quote. The price quote will contain the charges and the construction interval for that application.
8.2.5.1.1 The construction interval for these other augments will not exceed ninety (90) days. AT&T-13STATE will work cooperatively with Collocator to negotiate a mutually agreeable construction interval for other augments not specifically provided for above.
8.2.5.1.2 The second fifty percent (50%) payment must be received by AT&T-13STATE no later than one (1) week prior to the scheduled augment completion date. If all money has been received on the scheduled completion date, the Actual Point of Termination (APOT) Connections will be provided to the Collocator by AT&T- 13STATE.
Other Augments. 8.2.5.1 Other augments such as power requests that exceed current capacity ratings, additional bay spaces, SBC-13STATE bays, SBC-13STATE cable racks and/or cage expansions within Active Collocation Space different than described above will require the Collocator to submit an inquiry for quote. The price quote will contain the charges and the construction interval for that application.
8.2.5.1.1 The construction interval for these other augments will not exceed ninety (90) days. SBC-13STATE will work cooperatively with Collocator to negotiate a mutually agreeable construction interval for other augments not specifically provided for above.
8.2.5.1.2 The second fifty percent (50%) payment must be received by SBC-13STATE no later than one (1) week prior to the scheduled augment completion date. If all money has been received on the scheduled completion date, the Actual Point of Termination (APOT) Connections will be provided to the Collocator by SBC-13STATE.
8.2.5.1.3 During SBC-13STATE delivery interval, if engineering design work is complete, which includes asbestos removal, HVAC installation, filtration, floor loading, floor preparation, overhead racking placement, and one hundred percent (100%) of the non-recurring charges have been received by SBC-13STATE, Collocator and/or their SBC-13STATE Approved Tier 1 Vendor (s) may request SBC-13STATE to do work in parallel with SBC-13STATE throughout the remaining delivery interval. The Collocator must obtain an approved Method of Procedures (MOP) from SBC- 13STATE and follow SBC-13STATE’s Technical Publications for installation of equipment and facilities. Security Card requirements in Section 18.3.6 of this Appendix will apply.
Other Augments. 8.2.5.1 Other augments such as power requests that exceed current capacity ratings, additional bay spaces, AT&T INDIANA bays, AT&T INDIANA cable racks and/or cage expansions within Active Collocation Space different than described above will require MCIm to submit an inquiry for quote. The price quote will contain the charges and the construction interval for that application.
8.2.5.1.1 The construction interval for these other augments will not exceed ninety (90) days. AT&T INDIANA will work cooperatively with MCIm to negotiate a mutually agreeable construction interval for other augments not specifically provided for above.
8.2.5.1.2 The second fifty percent (50%) payment must be received by AT&T INDIANA no later than one (1) week prior to the scheduled augment completion date. If all money has been received on the scheduled completion date, the Actual Point of Termination (APOT) Connections will be provided to MCIm by AT&T INDIANA.
8.2.5.1.3 During AT&T INDIANA delivery interval, if engineering design work is complete, which includes asbestos removal, HVAC installation, filtration, floor loading, floor preparation, overhead racking placement, and one hundred percent (100%) of the non-recurring charges have been received by AT&T INDIANA, MCIm and/or their AT&T INDIANA Approved Tier 1 Vendor (s) may request AT&T INDIANA to do work in parallel with AT&T INDIANA throughout the remaining delivery interval. MCIm must obtain an approved Method of Procedures (MOP) from AT&T INDIANA and follow AT&T INDIANA’s Technical Publications for installation of equipment and facilities. Security Card requirements in Section 18.3.6 of this Appendix will apply.
Other Augments. 8.2.5.1 Other augments such as power requests that exceed current capacity ratings, additional bay spaces, AT&T-13STATE bays, AT&T-13STATE cable racks and/or cage expansions within Active Collocation Space different than described above will require the Wireless Collocator to submit an inquiry for quote. The price quote will contain the charges and the construction interval for that application.
8.2.5.1.1 The construction interval for these other augments will not exceed ninety (90) days. AT&T-13STATE will work cooperatively with Wireless Collocator to negotiate a mutually agreeable construction interval for other augments not specifically provided for above.
8.2.5.1.2 The second fifty percent (50%) payment must be received by AT&T-13STATE no later than one (1) week prior to the scheduled augment completion date. If all money has been received on the scheduled completion date, the Actual Point of Termination (APOT) Connections will be provided to the Wireless Collocator by AT&T-13STATE.
8.2.5.1.3 During AT&T-13STATE delivery interval, if engineering design work is complete, which includes asbestos removal, HVAC installation, filtration, floor loading, floor preparation, overhead racking placement, and one hundred percent (100%) of the non-recurring charges have been received by AT&T-13STATE, Wireless Collocator and/or their AT&T-13STATE Approved Tier 1 Vendor (s) may request AT&T-13STATE to do work in parallel with AT&T-13STATE throughout the remaining delivery interval. The Wireless Collocator must obtain an approved Method of Procedures (MOP) from AT&T-13STATE and follow AT&T-13STATE’s Technical Publications for installation of equipment and facilities. Security Card requirements in Section 18.3.6 of this Appendix will apply.
Other Augments. 8.2.5.1 Other augments such as power requests that exceed current capacity ratings, additional bay spaces, AT&T-OHIO bays, AT&T-OHIO cable racks and/or cage expansions within Active Collocation Space different than described above will require the Collocator to submit an inquiry for quote. The price quote will contain the charges and the construction interval for that application.
8.2.5.1.1 The construction interval for these other augments will not exceed ninety (90) days. AT&T-OHIO will work cooperatively with Collocator to negotiate a mutually agreeable construction interval for other augments not specifically provided for above.
8.2.5.1.2 The second fifty percent (50%) payment must be received by AT&T-OHIO no later than one (1) week prior to the scheduled augment completion date. If all money has been received on the scheduled completion date, the Actual Point of Termination (APOT) Connections will be provided to the Collocator by AT&T- OHIO.
8.2.5.1.3 During AT&T-OHIO delivery interval, if engineering design work is complete, which includes asbestos removal, HVAC installation, filtration, floor loading, floor preparation, overhead racking placement, and one hundred percent (100%) of the non-recurring charges have been received by AT&T-OHIO, Collocator and/or their AT&T-OHIO Approved Tier 1 Vendor (s) may request AT&T-OHIO to do work in parallel with AT&T-OHIO throughout the remaining delivery interval. The Collocator must obtain an approved Method of Procedures (MOP) from AT&T- OHIO and follow AT&T-OHIO’s Technical Publications for installation of equipment and facilities. Security Card requirements in Section 18.3.6 of this Appendix will apply. Page 80 of 376 8.3 Cancellation Prior to Due Date 8.3.1 In the event that the Collocator cancels its collocation application after AT&T-OHIO has begun preparation of the Telecommunications Infrastructure Space and Dedicated Space, but before AT&T-OHIO has been paid the entire amounts due under this Appendix, then in addition to other remedies that AT&T-OHIO might have, the Collocator shall be liable in the amount equal to the non-recoverable costs less estimated net salvage, the total of which is not to exceed the Preparation Charges. Non-recoverable costs include the non-recoverable cost of equipment and material ordered, provided or used; the non-recoverable cost of installation and removal, including the costs of equipment and material ordered, provided or used; labor; transportation and any other associate...