OTDR TESTING Sample Clauses

OTDR TESTING. All traces will be provided in hard copy and diskette form using GR 196 format. This testing will be conducted at both 1310 nm and 1550 nm wavelengths when the Leased Fiber consists of Standard Single Mode Fiber, but will be done at 1550 nm only if the Leased Fiber consists of either Dispersion Shifted Fiber (True-WaveTM, LEAFTM, etc.) or a combination of Single Mode and Dispersion Shifted fiber types. OTDR testing will be conducted on a bi-directional basis for each Leased Fiber in each span at the appropriate wavelengths for the Leased Fiber described above. However, if due to length or attenuation reasons that the Leased Fiber span exceeds the dynamic range of an OTDR, a portion or all of the span may be tested on a unidirectional basis only. Alternatively, the Leased Fiber span may be divided into shorter testing spans, to the extent reasonably possible, in order to obtain bi-directional analysis. Also, in instances where a Carrier intends to accept Leased Fiber that is not terminated at one end by MFN in a fiber distribution panel (such as in a manhole or handhole) only unidirectional testing will be performed.
AutoNDA by SimpleDocs
OTDR TESTING. This testing will be conducted at both 1310 nm and 1550 nm wavelengths when the Leased Fiber consists of Standard Single Mode Fiber, but will be done at 1550 nm only if the Leased Fiber consists of either Dispersion Shifted Fiber (True-WaveTM, LEAFTM, etc.) or a combination of Single Mode and Dispersion Shifted fiber types. OTDR testing will be conducted on a bi-directional basis for each Leased Fiber in each span at the appropriate wavelengths for the Leased Fiber described above. However, if due to length or attenuation reasons that the Leased Fiber span exceeds the dynamic range of an OTDR, a portion or the entire span may be tested on a unidirectional basis only. Alternatively, the Leased Fiber span may be divided into shorter testing spans, to the extent reasonably possible, in order to obtain bi-directional analysis. Also, in instances where a Customer intends to accept Leased Fiber that is not terminated at one end by MFN in a fiber distribution panel (such as in a manhole or handhole) only unidirectional testing will be performed. The turnover documentation package delivered to Customer will contain the actual traces that detail the testing parameters (including pulse width, averaging and range). The average bi-directional splice loss for all splices within each span will be of 0.15 dB or less while each connector pair (such as at a FDP) will have an average bi-directional loss of 0.5 dB or less. (Note that the front and end connector of the span can only be measured uni-directionally and will also have a loss equal to or less than 0.5 dB). In the event that OTDR acceptance testing must be done on a unidirectional basis (for reasons described above), an average per span splice loss will be 0.30 dB. If the average bi-directional splice loss of each span exceeds 0.15 dB (or 0.30 dB uni-directionally), MFN will provide upon the Customer's request documentation of at a least three attempts to reduce this value to below 0.15 dB (0.30 dB uni-directionally). The only exception to this will be in the instance of a splice between two different fiber types (Standard Single-mode to Dispersion Shifted, Depressed-Clad to Matched Clad, fibers with different mode-field diameters). Customer should also note that the loss and/or reflectance of the front-end connector (as measured using a launch cord) is only an indicator of a problem such as a defective port, bulkhead, or the like. Since a different patch cord will be used by Customer (that connects to their equipm...
OTDR TESTING. 23.1 After all splice points for the fiber optic spans are completed, Contactor shall record measurements of the splice losses with an Optical Time Domain Reflectometer (OTDR). These measurements must be made after the splice cases are closed and permanently racked in manhole/handhole or lashed to strand in order to check for macro- bending problems, unless directed by Company where temporary testing splices are required. Contractor shall follow Company specifications to test the fiber optic cable as well as the specifications of the cable manufacturer and the equipment manufacturer.
OTDR TESTING. (a) Contractor will conduct optical time-domain reflectometer (“OTDR”) testing at both 1310 nm and 1550 nm wavelengths when the fiber consists of Standard Single Mode Fiber, and at 1550 nm if the Buyer Fiber consists of either Dispersion Shifted Fiber (TrueWave™, LEAF™, etc.) or a combination of Single Mode and Dispersion Shifted fiber types. Contractor will conduct OTDR testing on a bi-directional basis for each Buyer Fiber in each span. However, if due to length or attenuation reasons the Buyer Fiber span exceeds the OTDR dynamic range, a portion or the entire span may be tested on a unidirectional basis. Alternatively, the Buyer Fiber span may be divided into shorter testing spans, to the extent reasonably possible, in order to obtain bi-directional analysis. Also, in instances where Buyer intends to accept Buyer Fiber that is not terminated at one end by Contractor in a fiber distribution panel (such as in a manhole or handhole), only unidirectional testing will be performed. Based on the foregoing OTDR testing methodology, each Buyer Fiber span must meet the following minimum performance requirements, excluding loss associated with splices and connectors: Fiber Type and Wavelength Maximum Attenuation Coefficient (dB/km) Singlemode at 1310 nm 0.35 Singlemode at 1550 nm 0.25
OTDR TESTING. Optical Time-Domain Reflectometry (OTDR) traces will be taken and splice loss measurements recorded and summarized on data sheets. For any span, OTDR testing will be performed where the fiber is terminated with a connector. OTDR testing will be conducted at both 1310nm and 1550nm wavelengths. OTDR testing will be conducted on a bi-directional basis for each Fiber(s) in each Segment at the appropriate wavelengths described above. The Acceptance Package will contain the actual traces that detail the testing parameters.

Related to OTDR TESTING

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Product Testing Upon request, Customer shall provide Operator a laboratory report for each Product delivery by Customer or Customer’s supplier. Operator will not be obligated to receive Contaminated Product for throughput through the Pipelines, nor will Operator be obligated to accept Product that fails to meet the applicable quality specifications for the Berths under the BAUTA and any Terminal Service Orders issued thereunder.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

Time is Money Join Law Insider Premium to draft better contracts faster.