Common use of ORDER OF PRIORITY Clause in Contracts

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended.

Appears in 17 contracts

Samples: milwaukeepublic.ic-board.com, esb.milwaukee.k12.wi.us, milwaukeepublic.ic-board.com

AutoNDA by SimpleDocs

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 975; and 3) Contractor’s Response to RFB 5768, as amendedRFP 975.

Appears in 5 contracts

Samples: School Directors Professional Services Contract, Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1074 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1074.

Appears in 4 contracts

Samples: Milwaukee Board of School Directors Professional Services Contract, Milwaukee Board of School Directors Professional Services Contract, Milwaukee Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1022 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1022.

Appears in 3 contracts

Samples: milwaukee.ic-board.com, esb.milwaukee.k12.wi.us, esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1041 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1041.

Appears in 3 contracts

Samples: School Directors Professional Services Contract, Milwaukee Board of School Directors Professional Services Contract, Milwaukee Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1003 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1003.

Appears in 3 contracts

Samples: School Directors Professional Services Contract, School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)5771; and 3) Contractor’s Response to RFB 5768, as amended5771.

Appears in 3 contracts

Samples: School Directors Professional Services Contract, School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 878; and 3) Contractor’s Response to RFB 5768, as amendedRFP 878.

Appears in 3 contracts

Samples: Services Contract, School Directors Professional Services Contract, Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 885; and 3) Contractor’s Response to RFB 5768, as amendedRFP 885.

Appears in 3 contracts

Samples: Services Contract, School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1082 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1082.

Appears in 3 contracts

Samples: Milwaukee Board of School Directors Professional Services Contract, Milwaukee Board of School Directors Professional Services Contract, Milwaukee Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid B 5735; and 34) Contractor’s Response to RFB 5768, as amendedB 5735.

Appears in 2 contracts

Samples: Milwaukee Board of School Directors Busing Contract, Milwaukee Board of School Directors Busing Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 987 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 987.

Appears in 2 contracts

Samples: School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid 5717; and 34) Contractor’s Response to RFB 5768, as amendedBid 5717.

Appears in 2 contracts

Samples: milwaukeepublic.ic-board.com, esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among anong the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and its exhibits and addenda, if an; 2) RFB 5768 (including all exhibits and addenda)Request for Proposal 1019; and 3) Contractor’s Response to RFB 5768, as amendedRequest for Proposal 1019.

Appears in 2 contracts

Samples: milwaukeepublic.ic-board.com:443, esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 5779 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended5779.

Appears in 2 contracts

Samples: Services Contract, esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 986 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 986.

Appears in 2 contracts

Samples: School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 970 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 970 (exclusive of Tab E).

Appears in 2 contracts

Samples: School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1040 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1040.

Appears in 2 contracts

Samples: Milwaukee Board of School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1038 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1038.

Appears in 2 contracts

Samples: School Directors Professional Services Contract, School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all RFP 972 and its exhibits and addenda); 3) Contractor’s Presentation/BAFO Questionnaire Table A to RFP 972; and 34) Contractor’s Response to RFB 5768, as amendedRFP 972 (inclusive of clarification and exclusive of Tab E).

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 908; and 3) Contractor’s Response to RFB 5768, as amendedRFP 908.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1004 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 1004 as modified by Clarification dated June 11, as amended2019 and Amended BAFO date June 28, 2019.

Appears in 1 contract

Samples: Milwaukee Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1071 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1071.

Appears in 1 contract

Samples: Milwaukee Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1031 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1031.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 954; and 3) Contractor’s Response to RFB 5768, as amendedRFP 954.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and Exhibit A; 2) RFB 5768 (including all exhibits and addenda)RFP 920; and 3) Contractor’s Response to RFB 5768, as amendedRFP 920.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1092 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1092.

Appears in 1 contract

Samples: Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 977 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 977.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1045 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1045.

Appears in 1 contract

Samples: Milwaukee Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 966; and 3) Contractor’s Response to RFB 5768, as amendedRFP 966.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 1001; and 3) Contractor’s Response to RFB 5768, as amendedRFP 1001.

Appears in 1 contract

Samples: milwaukeepublic.ic-board.com:443

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 968; and 3) Contractor’s Response to RFB 5768, as amendedRFP 968.

Appears in 1 contract

Samples: milwaukeepublic.ic-board.com

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Licensed Product Agreement; 3) RFP 975; and 34) Contractor’s Response to RFB 5768, as amendedRFP 975.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) RFP 879; and 34) Contractor’s Response to RFB 5768, as amendedRFP 879.

Appears in 1 contract

Samples: milwaukeepublic.ic-board.com

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 892; and 3) Contractor’s Response to RFB 5768, as amendedRFP 892.

Appears in 1 contract

Samples: milwaukeepublic.ic-board.com

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 929; and 3) Contractor’s Response to RFB 5768, as amendedRFP 929.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1034 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1034.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 1000 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1000.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 953; and 3) Contractor’s Response to RFB 5768, as amendedRFP 953.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 916; and 3) Contractor’s Response to RFB 5768, as amendedRFP 916.

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1018 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1018.

Appears in 1 contract

Samples: milwaukeepublic.ic-board.com

AutoNDA by SimpleDocs

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and its exhibits and addenda; 2) RFB 5768 (including all exhibits and addenda)Request for Proposal 899; and 3) Contractor’s Response to RFB 5768, as amendedRequest for Proposal 899.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 979 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 979.

Appears in 1 contract

Samples: Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 933; and 3) Contractor’s Response to RFB 5768, as amendedRFP 933.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 998 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 998.

Appears in 1 contract

Samples: Board of School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1025 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 1025 as modified by the BAFO dated November 22, as amended.2019

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 981 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 981, as amended.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 1063; and 3) Contractor’s Response to RFB 5768, as amendedRFP 1063.

Appears in 1 contract

Samples: Instructional Materials Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)5734; and 3) Contractor’s Response to RFB 5768, as amended5734.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) Contractor’s Response to RFB 5768, as amended; and 3) RFB 5768 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 924; and 3) Contractor’s Response to RFB 5768, as amendedRFP 924.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1028 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1028.

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1032 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1032.

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 985 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 985.

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1039 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1039.

Appears in 1 contract

Samples: milwaukeepublic.ic-board.com

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 944; and 3) Contractor’s Response to RFB 5768, as amendedRFP 944.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 982; and 3) Contractor’s Response to RFB 5768, as amendedRFP 982.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and its Exhibit A; 2) RFB 5768 (including all exhibits and addenda)RFP 876; and 34) Contractor’s Response to RFB 5768, as amendedRFP 876.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1012 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 1012, as amended.

Appears in 1 contract

Samples: Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract with all exhibits; 2) RFB 5768 (including all exhibits and addenda)RFP 931; and 3) Contractor’s Response to RFB 5768, as amendedRFP 931.

Appears in 1 contract

Samples: Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid B 5744; and 34) Contractor’s Response to RFB 5768, as amendedB 5744.

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 915; and 3) Contractor’s Response to RFB 5768, as amendedRFP 915.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid 5718; and 34) Contractor’s Response to RFB 5768, as amendedBid 5718.

Appears in 1 contract

Samples: esb.milwaukee.k12.wi.us

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1010 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1010.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 993 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 993.

Appears in 1 contract

Samples: School Directors Professional Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 930; and 3) Contractor’s Response to RFB 5768, as amendedRFP 930.

Appears in 1 contract

Samples: Services Contract

ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 996; and 3) Contractor’s Response to RFB 5768, as amendedRFP 996.

Appears in 1 contract

Samples: School Directors Professional Services Contract