Optimisation of change detection method Sample Clauses

Optimisation of change detection method. In the preceding experiment the ‘feature’ is always a in the form of a defect from a standard cork tile. However, when considering change detection within iMars imagery, each pair of co-registered images presented to a citizen scientist are likely to depict fairly widely differing terrain. Thus, we require an additional stage of processing, not just feature identification but a prior stage of change detection. Within the experimental platform we have developed using the Zooniverse Panoptes system, two options (and one variant) were generated. In our earlier literature review (D7.1) we identified that flicker was a promising option as a change detection technique as a change creates motion in the visual field orienting the observer to the source. However, it might also be the case that this mode of presentation would be perceived as irritating and citizen scientists might instead do better to compare images simply side-by-side. An additional potential option to this, identified through feedback from a pilot experiment, was that participants might prefer to manually control the flicker rate themselves. More critically, it might simply be the case that the task is impossible, however presented, to complete. Hitherto our analysis of the viability of change detection was based on small pilot and we extended this to compare the three options with actual Mars imagery.
AutoNDA by SimpleDocs

Related to Optimisation of change detection method

  • Construction Change Directive A written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the District and the Architect, directing a change in the Work.

  • Construction Change Directives 7.3.1 A Construction Change Directive is written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

  • DRUG ABUSE DETECTION AND DETERRENCE 2.18.1 It is the policy of the City to achieve a drug-free workforce and workplace. The manufacture, distribution, dispensation, possession, sale, or use of illegal drugs or alcohol by contractors while on City Premises is prohibited. Contractor shall comply with all the requirements and procedures set forth in the Mayor’s Drug Abuse Detection and Deterrence Procedures for Contractors, Executive Order No. 1-31 (the “Executive Order”), which is incorporated into this Agreement and is on file in the City Secretary’s Office.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Virus detection You will be responsible for the installation and proper use of any virus detection/scanning program we require from time to time.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Implementation of Strategic Plan Goals This Agreement supports the County’s Strategic Plan, Goal 1, Operational Effectiveness/Fiscal Sustainability. This Agreement will provide revenue reimbursement to the Department for services rendered.

  • Terminating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

Time is Money Join Law Insider Premium to draft better contracts faster.