OPPOSITE SEASON FUNCTIONAL TESTING Sample Clauses

OPPOSITE SEASON FUNCTIONAL TESTING. 8.1. The PAC shall assure no critical PAC issues remain from the Construction Stage.
AutoNDA by SimpleDocs
OPPOSITE SEASON FUNCTIONAL TESTING. 6.1. The TAB shall assure no critical TAB issues remain from the Construction Stage.

Related to OPPOSITE SEASON FUNCTIONAL TESTING

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Customer Service Standards The Franchising Authority hereby adopts the customer service standards set forth in Part 76, §76.309 of the FCC’s rules and regulations, as amended. The Grantee shall comply in all respects with the customer service requirements established by the FCC.

Time is Money Join Law Insider Premium to draft better contracts faster.