Operations Control Sample Clauses

Operations Control. Beginning on the Cutover Date and continuing through the term of this Addendum, ACS shall perform the following operations control functions:
AutoNDA by SimpleDocs
Operations Control. Center The Offeror shall demonstrate:
Operations Control. During the term of this Agreement, Operator shall retain authority over the MA Business as required by law in accordance with the licenses held by the MA Business.

Related to Operations Control

  • Operations Logs Seller shall maintain a complete and accurate log of all material operations and maintenance information on a daily basis. Such log shall include, but not be limited to, information on power production, fuel consumption, efficiency, availability, maintenance performed, outages, results of inspections, manufacturer recommended services, replacements, electrical characteristics of the generators, control settings or adjustments of equipment and protective devices. Seller shall maintain this information for at least two (2) years and shall provide this information electronically to Buyer within one day of Buyer’s request.

  • Interim Operations The Company covenants and agrees as to itself and its Subsidiaries that, after the date hereof and prior to the Effective Time (unless Parent shall otherwise approve in writing and except as otherwise expressly contemplated by this Agreement):

  • Supervision and Oversight The Contractor shall be solely responsible for providing supervision and oversight to all the Contractor’s personnel that are assigned to the Agency properties pursuant to this contract.

  • System Operations Each party, at its own expense, shall provide and maintain the equipment, software, services and testing necessary to transmit Data Communications to, and receive Data Communications from the parties’ respective Receipt Computers.

  • Banking Operations Enter into any new material line of business; change its material lending, investment, underwriting, risk and asset liability management and other material banking and operating policies, except as required by applicable law, regulation or policies imposed by any Governmental Authority; or file any application or make any contract with respect to branching or site location or branching or site relocation.

  • General Conditions Costs Construction Manager is entitled to receive payment for the actual cost of the allowable General Conditions items incurred after receipt of a Notice to Proceed with Construction from the Owner through Substantial Completion of the Project plus thirty (30) calendar days. Construction Manager is not entitled to reimbursement for General Conditions Costs incurred before receipt of the Notice to Proceed. General Conditions Costs incurred after Substantial Completion must be approved in advance by the Owner. Allowable General Conditions items are identified below and by attached exhibit. These items shall be included in the General Conditions cost amount shown as a line item in the Guaranteed Maximum Price Proposal and as detailed on the schedule of values. Items not specifically included below or in the exhibit will not be allowed as a General Condition costs.

  • Operational Control Directing the operation of the Transmission Facilities Under ISO Operational Control to maintain these facilities in a reliable state, as defined by the Reliability Rules. The ISO shall approve operational decisions concerning these facilities, made by each Transmission Owner before the Transmission Owner implements those decisions. In accordance with ISO Procedures, the ISO shall direct each Transmission Owner to take certain actions to restore the system to the Normal State. Operational Control includes security monitoring, adjustment of generation and transmission resources, coordination and approval of changes in transmission status for maintenance, determination of changes in transmission status for reliability, coordination with other Control Areas, voltage reductions and Load Shedding, except that each Transmission Owner continues to physically operate and maintain its facilities.

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

  • Quality Management Grantee will:

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

Time is Money Join Law Insider Premium to draft better contracts faster.