Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.
Transport 6.1.1 BellSouth shall provide nondiscriminatory access, in accordance with FCC Rules 51.311, 51.319, and Section 251(c)(3) of the Act to interoffice transmission facilities described in this Section 6 on an unbundled basis to EZ Phone for the provision of a qualifying service, as set forth herein.
Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.
Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.
Leave Loading 10.2 The employer and the individual employee must have genuinely made the agreement without coercion or duress.
Transportation Transportation expenses include, but are not limited to, airplane, train, bus, taxi fares, rental cars, parking, mileage reimbursement, and tolls that are reasonably and necessarily incurred as a result of conducting State business. Each State agency shall determine the necessity for travel, and the mode of travel to be reimbursed.
Delivery Points Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.
Receipt Points The Points of Receipt are listed in Appendix 2.
Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors, elevator shafts, or ventilating ducts or shafts of the Building. All trash shall be placed in receptacles provided by Tenant on the Premises or in any receptacles provided by Landlord for the Building.