Necessity Travel Sample Clauses

Necessity Travel. When the nature and location of the work at a temporary duty station are such that suitable meals cannot be obtained there, the expense of daily travel required to obtain meals at the nearest available place may be approved as necessary transportation, not part of per diem or actual expense reimbursement. A statement of the necessity for such daily travel shall accompany the travel voucher.
AutoNDA by SimpleDocs

Related to Necessity Travel

  • Cybersecurity Training A. Contractor represents and warrants that it will comply with the requirements of Section 2054.5192 of the Texas Government Code relating to cybersecurity training and required verification of completion of the training program.

  • DUTY TRAVEL 40.01 An employee who is authorized to travel on Employer business will be reimbursed for reasonable expenses incurred.

  • Safety Training Pursuant to Missouri Revised Statute Section 292.675, Contractors and subcontractors who sign a contract to work on public works projects must provide a 10-hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. Contractors and subcontractors in violation of this provision will forfeit to the public body $2,500 plus $100 a day for each employee who is employed without training. Public bodies and contractors may withhold/assess these penalties from the payment due to those contractors and subcontractors if found to be in non-compliance.

  • Required Training For training that is required by the Agency, manager or supervisor, the Agency shall reimburse one hundred percent (100%) of all related necessary and legitimate expenses, including but not limited to tuition, books, travel expenses, travel time, and attendance time. When practical, the Agency will attempt to adjust the employee’s hours if the approved training activity is scheduled during the employee’s normal work hours.

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Workload An employee who believes that her workload is unsafe or consistently excessive shall discuss the problem with her immediate supervisor. If the problem is not resolved in this discussion, the employee may seek a remedy by means of the grievance procedure. If the matter is not resolved in the grievance procedure, it may be referred to troubleshooter who shall:

  • Specialized Training The Agency agrees to provide state-wide minimum standards of training for specialized assignments or required duties, such as Emergency Response Team, Special Emergency Response Team, and other posts, where use of weapons, use of physical force or breathing apparatus are required.

  • Specialized Services The specialized consultant services identified in the following list are included in Additional Services: Providing financial feasibility or other special studies. Providing planning surveys, site evaluations, environmental studies or comparative studies of prospective sites. Providing services relative to future facilities, systems and equipment which are not intended to be constructed during the Construction Phase. Providing services to make detailed investigation of existing conditions or facilities or to make measured drawings thereof, other than to verify the accuracy of drawings or other information furnished by the Owner. Providing coordination of Work performed by Owner’s separate Contractors or by the Owner’s own forces. Providing services in connection with the Work of a Contractor or separate consultants retained by the Owner other than commissioning consultant, testing and balance consultant, material testing firms or similar firms. Providing services for planning tenant or rental spaces. Making revisions in Drawings, Specifications or other documents when such revisions are inconsistent with written approvals or instructions previously given are required by the enactment or revision of codes, laws of regulations subsequent to the preparation of such documents or are due to other causes not solely within the control of the Project Architect. Making extensive investigations, surveys, valuations, inventories or detailed appraisals of existing facilities, except as otherwise required by the Agreement, and ser­vices required in connec­tion with construction performed by the Owner. Providing consultation concerning replacement of any Work damaged by fire or other cause during construction, and furnishing services as may be required in connection with the replacement of such Work. Providing services made necessary by the default of the Contractor, or by major defects or deficiencies in the Work of the Contractor, or by failure of performance of the Contractor under the Contract for Construction. Providing extensive assistance in the utilization of any equipment or system such as initial start-up or testing, adjusting and balancing, preparation of operation and maintenance manuals, training personnel for operation and maintenance, and consultation during operation. Providing services after the expiration of sixty (60) days following final payment to the Contractor, excluding any services necessary during the warranty period inspections and provided that all of Project Architect’s services as required under this Agreement have been satisfactorily completed. Preparing to serve or serving as an expert witness at the request of the Owner in connection with any public hearing, arbitration proceeding or legal proceeding. Providing any other services not otherwise customarily furnished in accordance with generally accepted architectural practice.

  • Interruption A reduction in non-firm transmission service due to economic reasons pursuant to Section 14.7.

Time is Money Join Law Insider Premium to draft better contracts faster.