Motors. The Contractor inspects and ensures that motors: are kept clean and free from any coal spillage and dust, at all times; are not to run if wet, and are not submerged in mud or coal slurry. are sufficiently lubricated In the event of any of the above happening, the motor is thoroughly cleaned, dried out and serviced, before being made operational; The Contractor inspects and records motor parameters during weekly inspections. In addition, the Contractor ensures that: monthly tests are carried out to monitor electrical current and vibration levels; and the findings of the tests are documented to determine when the motor must be serviced, or overhauled; motors are not to run with abnormal vibrations; and in the event of abnormal vibrations being detected, the motor is rectified immediately; motors are not to run when the cooling system is not in operation, or defective; and an abnormal rise in temperature is attended to; the thermal rating of the motor is not exceeded; bearing temperatures to be monitored. Motors are not started more than that specified by the manufacturer of the motor, within a given time frame.
Appears in 2 contracts
Sources: Nec3 Term Service Contract, Nec3 Term Service Contract