MOB Site Work Notice Sample Clauses

MOB Site Work Notice. (a) On or before the MOB Site Work Notice Date, Xxxxx shall deliver a Notice (the “MOB Site Work Notice”) to Project Co to confirm whether Xxxxx will provide Project Co with access to the MOB Site on or prior to the MOB Site Turnover Date.
AutoNDA by SimpleDocs

Related to MOB Site Work Notice

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.

  • STOP WORK NOTICE The City may issue an immediate Stop Work Notice in the event the Contractor is observed performing in a manner that is in violation of Federal, State, or local guidelines, or in a manner that is determined by the City to be unsafe to either life or property. Upon notification, the Contractor will cease all work until notified by the City that the violation or unsafe condition has been corrected. The Contractor shall be liable for all costs incurred by the City as a result of the issuance of such Stop Work Notice.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Alternate Work Sites Employees may be assigned or authorized to report to work at an alternative work site(s) and be paid for the time worked.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Authorized User’s Statement of Work A competitive Mini-Bid is required for every transaction under this Centralized Contract. An Authorized User must prepare a detailed Statement of Work using Appendix F, Attachment 1, Mini-Bid Template. The Authorized User must distribute the Mini-Bid to all qualified Vendors per Lot(s) (unless a Vendor has removed itself from consideration via the Appendix F, Attachment 5, Mini-Bid Participation Interest Template). Contact information, organized by Lot, will be available on the OGS website for this Contract. An Authorized User shall conduct its Mini-Bid in accordance with the requirements set forth in Appendix F, Attachment 2, How to Use this Contract. The following terms and conditions shall apply to each Mini-Bid issued by an Authorized User:  An Authorized User may require the execution of unique forms, such as Confidentiality Non- Disclosure agreements; and  An Authorized User is required to make tentative award and non-award notifications to each Contractor who submitted a response to the Mini-Bid. Additionally, the minimum time, excluding the date of release, between issuance of the Mini-Bid by the Authorized User to the Mini-Bid Opening is as follows:  Xxx 0 Xxxx-Xxxx: Xxxx (0) Xxxxxxxx Xxxx  Xxx 0 Mini-Bids: Ten (10) Business Days

  • Project Deliverables The Contractor shall provide each of the following deliverables in writing to the City for review and approval to achieve the project objectives.

  • Alternative Work Schedules Alternative work schedule means an approved schedule for an Employee that deviates from the work week described in Section 1, Section 2, or a schedule that deviates from a worksite’s normal schedule. Employees who work a “shift work schedule” as part of a rotating group of individuals who must continuously maintain a 24-hour operation or facility are not eligible for an alternative work schedule.

  • Scope of Work and Deliverables 9.1 Background and Scope

Time is Money Join Law Insider Premium to draft better contracts faster.