Measurement for Payment Sample Clauses

Measurement for Payment. When space is offered and accepted, the space will be mutually measured upon substantial completion and delivery. Payment will be made on the basis of actual measurements; however, payment will not be made for delivered space which is in excess of the maximum square footage solicited. The annual rent will be calculated by multiplying the annual square footage rate times square footage.
AutoNDA by SimpleDocs
Measurement for Payment a) Measurement for Payment – actual length in linear metres measured as Plan Quantity; and
Measurement for Payment. Final payment will be made according to the Contract price based on quantity determined by weigh tickets supplied by the contractor.
Measurement for Payment. 1 Notify Departmental Representative sufficiently in advance of operations to permit required measurements for payment.
Measurement for Payment. Measurement for payment shall be based on the final actual measured quantity supplied per OPSS.MUNI 314, all in accordance with the unit price bid for all items in the Form of Tender. Payment shall be made under these items for the supply, placing, grading and compaction of Granular ‘A’ as specified within the location descriptions, and/or as directed by the Contract Administrator. The Contractor shall also submit copies of weigh ticket receipts to the Contract Administrator for all granular material paid under this item. Granular used for any temporary entrances or accesses are not included in this item.
Measurement for Payment. Payment shall be by the linear meter in accordance with the unit price bid in the Form of Tender.
Measurement for Payment. All items except bulk excavation shall be measured net in-situ to the profiles and dimensions shown on the Drawings or described in the Specifications and the Contractor shall allow for wastage in the rates in Schedules E1 for the net quantities so calculated. Measurement of Work shall be made in accordance with the conditions set out hereunder.
AutoNDA by SimpleDocs
Measurement for Payment. Bridge-Foundation-Post shall be measured in numbers of such post, all executed as per the Drawings. 8.18
Measurement for Payment. Painting work shall be measured in numbers of pier locations where work is executed, all as per the Drawings.
Measurement for Payment. Work under items 4a and 4b will be measured per CUBIC YARD of additional excavation below the depth of eight (8) feet from ground level. ADDITIONAL TRENCH EXCAVATION will be measured as CUBIC YARD of additional trench excavation, for Work which includes: a. Trench excavation, hauling and disposal of spoils. b. Furnishing, placing and removing excavation protection system. c. Furnishing, placing and compacting trench backfill, bedding and trench stabilization stone. d. Dewatering excavations. REV: 10.01.2018