{"component": "clause", "props": {"groups": [{"snippet": "The Authority must adopt a Master Plan that describes, among other things, the operations of the Authority in sufficient detail to fund and implement the System and any related facilities or programs and to allow the Authority to plan for financing, investments, and improvements related to the System.\n7.1.1. Contents. A Master Plan must provide for, at a minimum, the following:\n7.1.1.1. Revenues necessary to operate the Authority, including the amount of, and methodology to calculate, reserve funds needed to cover any and all applicable costs for closure, long-term care, perpetual maintenance, and potential remediation related to the System and its components;\n7.1.1.2. Storage, separation, processing, recycling, recovery, reuse, and identification of the number of diversion sites and disposal sites for System Waste needed for System operations, as may be appropriate;\n7.1.1.3. Diversion plans for: (a) any Hazardous Materials that have impermissibly entered the System; and (b) any System Waste for which diversion is appropriate under applicable law;\n7.1.1.4. Strategies, services, and programs to address Authority Solid Waste reduction as well as Recyclable Materials and Recovered Materials processing, and appropriate public education regarding same;\n7.1.1.5. Alternative and contingency facilities, consistent with this Agreement;\n7.1.1.6. Whether certain disposal methods will be prohibited at Authority-owned facilities for the purposes of protecting underground sources of drinking water;\n7.1.1.7. Additional goals identified by the Governing Board not inconsistent with applicable law, this Agreement, or with County\u2019s exercise of its statutorily granted powers and obligations; and\n7.1.1.8. Strategies to fulfill the obligations of the Authority related to System Waste delivered to the System, consistent with the powers and limitations of this Agreement.", "samples": [{"hash": "gIyCZGXPDvW", "uri": "/contracts/gIyCZGXPDvW#master-plan", "label": "Interlocal Agreement", "score": 34.3884735107, "published": true}, {"hash": "cLuZdjP9r0N", "uri": "/contracts/cLuZdjP9r0N#master-plan", "label": "Interlocal Agreement", "score": 34.3884658813, "published": true}, {"hash": "7i5XSOyIvjq", "uri": "/contracts/7i5XSOyIvjq#master-plan", "label": "Interlocal Agreement", "score": 34.3884658813, "published": true}], "size": 9, "snippet_links": [{"key": "the-authority-must", "type": "clause", "offset": [0, 18]}, {"key": "the-operations", "type": "clause", "offset": [75, 89]}, {"key": "sufficient-detail", "type": "clause", "offset": [110, 127]}, {"key": "to-fund", "type": "definition", "offset": [128, 135]}, {"key": "the-system", "type": "clause", "offset": [150, 160]}, {"key": "facilities-or-programs", "type": "definition", "offset": [177, 199]}, {"key": "to-allow-the", "type": "clause", "offset": [204, 216]}, {"key": "authority-to", "type": "definition", "offset": [217, 229]}, {"key": "related-to", "type": "clause", "offset": [280, 290]}, {"key": "provide-for", "type": "definition", "offset": [339, 350]}, {"key": "to-operate", "type": "definition", "offset": [409, 419]}, {"key": "methodology-to", "type": "clause", "offset": [464, 478]}, {"key": "funds-needed", "type": "definition", "offset": [498, 510]}, {"key": "applicable-costs", "type": "clause", "offset": [532, 548]}, {"key": "term-care", "type": "clause", "offset": [567, 576]}, {"key": "number-of", "type": "definition", "offset": [765, 774]}, {"key": "disposal-sites", "type": "clause", "offset": [795, 809]}, {"key": "system-waste", "type": "definition", "offset": [814, 826]}, {"key": "system-operations", "type": "definition", "offset": [838, 855]}, {"key": "plans-for", "type": "clause", "offset": [899, 908]}, {"key": "hazardous-materials", "type": "definition", "offset": [918, 937]}, {"key": "applicable-law", "type": "clause", "offset": [1048, 1062]}, {"key": "waste-reduction", "type": "clause", "offset": [1135, 1150]}, {"key": "recyclable-materials", "type": "clause", "offset": [1162, 1182]}, {"key": "recovered-materials", "type": "clause", "offset": [1187, 1206]}, {"key": "public-education", "type": "definition", "offset": [1235, 1251]}, {"key": "contingency-facilities", "type": "clause", "offset": [1293, 1315]}, {"key": "disposal-methods", "type": "clause", "offset": [1374, 1390]}, {"key": "owned-facilities", "type": "definition", "offset": [1423, 1439]}, {"key": "for-the-purposes-of", "type": "clause", "offset": [1440, 1459]}, {"key": "underground-sources-of-drinking-water", "type": "definition", "offset": [1471, 1508]}, {"key": "additional-goals", "type": "clause", "offset": [1519, 1535]}, {"key": "the-governing-board", "type": "definition", "offset": [1550, 1569]}, {"key": "with-county", "type": "clause", "offset": [1627, 1638]}, {"key": "exercise-of", "type": "clause", "offset": [1641, 1652]}, {"key": "powers-and-obligations", "type": "clause", "offset": [1677, 1699]}, {"key": "obligations-of-the-authority", "type": "clause", "offset": [1740, 1768]}, {"key": "consistent-with-the", "type": "clause", "offset": [1818, 1837]}, {"key": "limitations-of-this-agreement", "type": "clause", "offset": [1849, 1878]}], "hash": "f7145aaefe180cffee05c23c7ce6810e", "id": 4}, {"snippet": "The master plan of the City, originally presented in 1984, as may be amended, modified or supplemented by the City, in conjunction with the Comprehensive Plan.", "samples": [{"hash": "ibX372b4r0p", "uri": "/contracts/ibX372b4r0p#master-plan", "label": "Development Agreement", "score": 32.7022476196, "published": true}, {"hash": "ayAK5bJF0O2", "uri": "/contracts/ayAK5bJF0O2#master-plan", "label": "Development Agreement", "score": 32.699508667, "published": true}, {"hash": "bpaEdr9K9ow", "uri": "/contracts/bpaEdr9K9ow#master-plan", "label": "Development Agreement", "score": 32.6721343994, "published": true}], "size": 6, "snippet_links": [{"key": "of-the-city", "type": "clause", "offset": [16, 27]}, {"key": "by-the-city", "type": "clause", "offset": [103, 114]}, {"key": "comprehensive-plan", "type": "definition", "offset": [140, 158]}], "hash": "965e8e17db53704fde6d988925ec3ff2", "id": 5}, {"snippet": "The School shall prepare its own facility master plan in compliance with the rules of the Public School Capital Outlay Council and the Public Schools Capital Outlay Actxxvi.", "samples": [{"hash": "i4EbymZxSvv", "uri": "/contracts/i4EbymZxSvv#master-plan", "label": "Charter School Contract", "score": 31.5312309265, "published": true}, {"hash": "gK9qMjTwGnf", "uri": "/contracts/gK9qMjTwGnf#master-plan", "label": "Charter School Contract", "score": 31.4832324982, "published": true}, {"hash": "hNkwYCyd3DH", "uri": "/contracts/hNkwYCyd3DH#master-plan", "label": "Charter School Contract", "score": 30.4409217834, "published": true}], "size": 27, "snippet_links": [{"key": "the-school", "type": "definition", "offset": [0, 10]}, {"key": "facility-master-plan", "type": "definition", "offset": [33, 53]}, {"key": "rules-of", "type": "definition", "offset": [77, 85]}, {"key": "the-public", "type": "clause", "offset": [86, 96]}, {"key": "capital-outlay", "type": "definition", "offset": [104, 118]}, {"key": "public-schools", "type": "definition", "offset": [135, 149]}], "hash": "411bf2bea12a36eb0b0452d4f8454694", "id": 1}, {"snippet": "5.12.1 The Concessionaire shall no later than 90 (ninety) days of the Appointed Date, prepare and submit, for review and comments from the Independent Engineer/ authorised representative of the Authority, a draft master plan (\"Master Plan\") for the Project. The Master Plan shall include, but not be limited to, the following:\n(a) zoning and allocation of the areas for different Emergency Services, OPD Services, Inpatient Services, and Diagnostics Services for various phases of development;\n(b) Planning and lay out of the infrastructure required for the Site, including:\n(i) roads and storm drainage;\n(ii) common utilities like street lighting;\n(iii) waste management and effluent treatment plant, sewage network;\n(iv) car, two-\u2587\u2587\u2587\u2587\u2587\u2587\u2587 and cycle parking area;\n(v) area identified for installation of power back-up equipment;\n(vi) storage area;\n(vii) any other facilities necessary for and/or ancillary to a modern hospital.\n(c) specialties and super specialties to be provided in the Hospital with bed allocation plan;\n(d) details of all medical and clinical facilities and services to be provided in the Hospital including intensive care, ambulatory care services and other such medical and clinical facilities;\n(e) details of support Healthcare Services, facilities and utilities to be provided including diagnostics, mortuary, administration/back office, pharmacy and cafeteria;\n(f) medical waste disposal and treatment facilities;\n(g) detailed project milestones during construction phase for quarterly monitoring of the progress", "samples": [{"hash": "8qnADrWk0Yk", "uri": "/contracts/8qnADrWk0Yk#master-plan", "label": "Concession Agreement", "score": 24.3264884949, "published": true}, {"hash": "4qlanWIJET1", "uri": "/contracts/4qlanWIJET1#master-plan", "label": "Concession Agreement", "score": 24.1498966217, "published": true}, {"hash": "dAkWurO4lSQ", "uri": "/contracts/dAkWurO4lSQ#master-plan", "label": "Concession Agreement", "score": 23.9965782166, "published": true}], "size": 5, "snippet_links": [{"key": "the-concessionaire-shall", "type": "clause", "offset": [7, 31]}, {"key": "the-appointed-date", "type": "definition", "offset": [66, 84]}, {"key": "for-review", "type": "clause", "offset": [106, 116]}, {"key": "the-independent", "type": "clause", "offset": [135, 150]}, {"key": "representative-of-the-authority", "type": "definition", "offset": [172, 203]}, {"key": "the-project", "type": "definition", "offset": [245, 256]}, {"key": "allocation-of", "type": "clause", "offset": [342, 355]}, {"key": "emergency-services", "type": "definition", "offset": [380, 398]}, {"key": "opd-services", "type": "clause", "offset": [400, 412]}, {"key": "inpatient-services", "type": "definition", "offset": [414, 432]}, {"key": "services-for", "type": "clause", "offset": [450, 462]}, {"key": "phases-of-development", "type": "clause", "offset": [471, 492]}, {"key": "lay-out", "type": "clause", "offset": [511, 518]}, {"key": "the-infrastructure", "type": "clause", "offset": [522, 540]}, {"key": "the-site", "type": "clause", "offset": [554, 562]}, {"key": "storm-drainage", "type": "definition", "offset": [589, 603]}, {"key": "common-utilities", "type": "definition", "offset": [610, 626]}, {"key": "street-lighting", "type": "definition", "offset": [632, 647]}, {"key": "waste-management", "type": "clause", "offset": [655, 671]}, {"key": "effluent-treatment-plant", "type": "definition", "offset": [676, 700]}, {"key": "parking-area", "type": "clause", "offset": [750, 762]}, {"key": "installation-of", "type": "clause", "offset": [788, 803]}, {"key": "storage-area", "type": "clause", "offset": [834, 846]}, {"key": "other-facilities", "type": "definition", "offset": [858, 874]}, {"key": "necessary-for", "type": "definition", "offset": [875, 888]}, {"key": "the-hospital", "type": "definition", "offset": [984, 996]}, {"key": "allocation-plan", "type": "definition", "offset": [1006, 1021]}, {"key": "details-of", "type": "clause", "offset": [1027, 1037]}, {"key": "services-to-be-provided", "type": "clause", "offset": [1078, 1101]}, {"key": "intensive-care", "type": "clause", "offset": [1128, 1142]}, {"key": "services-and", "type": "clause", "offset": [1160, 1172]}, {"key": "healthcare-services", "type": "definition", "offset": [1240, 1259]}, {"key": "facilities-and-utilities", "type": "clause", "offset": [1261, 1285]}, {"key": "back-office", "type": "definition", "offset": [1349, 1360]}, {"key": "medical-waste-disposal", "type": "clause", "offset": [1390, 1412]}, {"key": "treatment-facilities", "type": "definition", "offset": [1417, 1437]}, {"key": "project-milestones", "type": "definition", "offset": [1452, 1470]}, {"key": "construction-phase", "type": "definition", "offset": [1478, 1496]}, {"key": "quarterly-monitoring", "type": "clause", "offset": [1501, 1521]}], "hash": "b3bd55c7082c9dd3be25c01bade15d46", "id": 6}, {"snippet": "Concessionaire agrees that no liability shall attach to the City, its officers, agents and employees by reason of any efforts or action toward implementation of any present or future master layout plan for the Airport, and waives any right to claim damages or other consideration arising therefrom.", "samples": [{"hash": "dOGp5X9qAMV", "uri": "/contracts/dOGp5X9qAMV#master-plan", "label": "Concession Agreement", "score": 22.0595474243, "published": true}, {"hash": "ef5N4n25ryC", "uri": "/contracts/ef5N4n25ryC#master-plan", "label": "Concession Agreement", "score": 21.9445590973, "published": true}], "size": 5, "snippet_links": [{"key": "no-liability", "type": "clause", "offset": [27, 39]}, {"key": "to-the-city", "type": "definition", "offset": [53, 64]}, {"key": "agents-and-employees", "type": "clause", "offset": [80, 100]}, {"key": "layout-plan", "type": "clause", "offset": [190, 201]}, {"key": "right-to-claim-damages", "type": "clause", "offset": [234, 256]}, {"key": "other-consideration", "type": "definition", "offset": [260, 279]}], "hash": "2e45a45a95557db11b6879fd9ee0bed2", "id": 7}, {"snippet": "5.11.1 The Concessionaire shall no later than 90 (ninety) days of the Appointed Date, prepare and submit, for review and comments from the Independent Engineer/ authorised representative of the Authority, a draft master plan (\"Master Plan\") for the Project. The Master Plan shall include, but not be limited to, the following:\n(a) zoning and allocation of the areas for different Emergency Services, OPD Services, Inpatient Services, and Diagnostics Services for various phases of development;\n(b) planning and lay out of the infrastructure required for the Site, including:\n(i) roads and storm drainage;\n(ii) common utilities like street lighting;\n(iii) waste management and effluent treatment plant, sewage network;\n(iv) car, two-\u2587\u2587\u2587\u2587\u2587\u2587\u2587 and cycle parking area;\n(v) area identified for installation of power back-up equipment;\n(vi) storage area;\n(vii) any other facilities necessary for and/or ancillary to a modern hospital.\n(c) Specialties and multi specialties to be provided in the Hospital with bed allocation plan within new hospital;\n(d) details of all medical and clinical facilities and services to be provided in the Hospital including Pharmacy, intensive care, ambulatory care services and other such medicinal and clinical facilities;\n(e) details of support Healthcare Services, facilities and utilities to be provided including diagnostics, mortuary, administration/back office and cafeteria;\n(f) medical waste disposal and treatment facilities;\n(g) detailed project milestones during construction phase for quarterly monitoring of the progress. In addition to the above, the Concessionaire is required to provide the details of medical and non-medical equipment or any further information as may be reasonably required by the Authority.\n5.11.2 On receipt of the Master Plan, the Independent Engineer/ authorised representative of the Authority shall review the Master Plan submitted by the Concessionaire and provide its comments/observations and suggestions on the same within 30 (thirty) days from the date of the receipt of such Master Plan by the Independent Engineer/ authorised representative of the Authority. Upon receipt of such comments/observations and suggestions from the Independent Engineer/ authorised representative of the Authority, the Concessionaire shall submit the revised Master Plan to the Independent Engineer/ authorised representative of the Authority and the Independent Engineer/ authorised representative of the Authority shall submit the same for the approval of the Authority.\n5.11.3 Upon receipt of the such Master Plan, the Authority in its capacity as the Special Planning Authority, shall review the said Master Plan and grant approval to the same with such modifications, as deemed fit to the Authority as per the provisions of the Applicable Laws and shall intimate the same to the Concessionaire. It is further agreed that no grant of approval by the Authority shall relieve the Concessionaire of its obligations and liabilities under this Agreement in any manner nor shall the Authority be liable for the same in any manner whatsoever {This Clause shall be applicable in the event NMPA is acting in the capacity of Special Planning Authority, otherwise such approvals shall be sought by the Concessionaire from relevant the local development bodies in accordance with Applicable Laws}.\n5.11.4 The Concessionaire shall not be entitled to any extension of time for developing the Project or any other relief on account of delay caused due to providing any clarification or in resubmitting the Master Plan.\n5.11.5 Notwithstanding the review by the Authority, the Concessionaire shall be solely responsible for any defect and/or deficiency in the Master Plan relating to the Project or any part thereof and accordingly the Concessionaire shall at all times remain responsible for its obligations under this Agreement.\n5.11.6 The Concessionaire shall in no way represent to any person that, as a result of any review by the Authority, the Authority have accepted responsibility for the technical or soundness of any work relating to the Project or part thereof carried out by the Concessionaire and the Concessionaire shall, in accordance with the provisions of this Agreement, be solely responsible for the technical feasibility, operational capability and reliability of the Project or any part thereof.", "samples": [{"hash": "b9osekAKIRN", "uri": "/contracts/b9osekAKIRN#master-plan", "label": "Concession Agreement", "score": 32.5855560303, "published": true}, {"hash": "g1kpoJDEU1W", "uri": "/contracts/g1kpoJDEU1W#master-plan", "label": "Concession Agreement", "score": 32.1643295288, "published": true}], "size": 5, "snippet_links": [{"key": "the-concessionaire-shall", "type": "clause", "offset": [7, 31]}, {"key": "the-appointed-date", "type": "definition", "offset": [66, 84]}, {"key": "for-review", "type": "clause", "offset": [106, 116]}, {"key": "the-independent", "type": "clause", "offset": [135, 150]}, {"key": "representative-of-the-authority", "type": "definition", "offset": [172, 203]}, {"key": "allocation-of", "type": "clause", "offset": [342, 355]}, {"key": "emergency-services", "type": "definition", "offset": [380, 398]}, {"key": "opd-services", "type": "clause", "offset": [400, 412]}, {"key": "inpatient-services", "type": "definition", "offset": [414, 432]}, {"key": "services-for", "type": "clause", "offset": [450, 462]}, {"key": "phases-of-development", "type": "clause", "offset": [471, 492]}, {"key": "lay-out", "type": "clause", "offset": [511, 518]}, {"key": "the-infrastructure", "type": "clause", "offset": [522, 540]}, {"key": "the-site", "type": "clause", "offset": [554, 562]}, {"key": "storm-drainage", "type": "definition", "offset": [589, 603]}, {"key": "common-utilities", "type": "definition", "offset": [610, 626]}, {"key": "street-lighting", "type": "definition", "offset": [632, 647]}, {"key": "waste-management", "type": "clause", "offset": [655, 671]}, {"key": "effluent-treatment-plant", "type": "definition", "offset": [676, 700]}, {"key": "parking-area", "type": "clause", "offset": [750, 762]}, {"key": "installation-of", "type": "clause", "offset": [788, 803]}, {"key": "storage-area", "type": "clause", "offset": [834, 846]}, {"key": "other-facilities", "type": "definition", "offset": [858, 874]}, {"key": "necessary-for", "type": "definition", "offset": [875, 888]}, {"key": "the-hospital", "type": "definition", "offset": [984, 996]}, {"key": "allocation-plan", "type": "definition", "offset": [1006, 1021]}, {"key": "new-hospital", "type": "definition", "offset": [1029, 1041]}, {"key": "details-of", "type": "clause", "offset": [1047, 1057]}, {"key": "services-to-be-provided", "type": "clause", "offset": [1098, 1121]}, {"key": "intensive-care", "type": "clause", "offset": [1158, 1172]}, {"key": "services-and", "type": "clause", "offset": [1190, 1202]}, {"key": "healthcare-services", "type": "definition", "offset": [1272, 1291]}, {"key": "facilities-and-utilities", "type": "clause", "offset": [1293, 1317]}, {"key": "back-office", "type": "definition", "offset": [1381, 1392]}, {"key": "medical-waste-disposal", "type": "clause", "offset": [1412, 1434]}, {"key": "treatment-facilities", "type": "definition", "offset": [1439, 1459]}, {"key": "project-milestones", "type": "definition", "offset": [1474, 1492]}, {"key": "construction-phase", "type": "definition", "offset": [1500, 1518]}, {"key": "quarterly-monitoring", "type": "clause", "offset": [1523, 1543]}, {"key": "in-addition-to-the-above", "type": "clause", "offset": [1561, 1585]}, {"key": "provide-the", "type": "clause", "offset": [1621, 1632]}, {"key": "medical-equipment", "type": "clause", "offset": [1660, 1677]}, {"key": "further-information", "type": "definition", "offset": [1685, 1704]}, {"key": "required-by", "type": "definition", "offset": [1726, 1737]}, {"key": "by-the-concessionaire", "type": "clause", "offset": [1899, 1920]}, {"key": "date-of-the-receipt", "type": "definition", "offset": [2020, 2039]}, {"key": "upon-receipt-of", "type": "definition", "offset": [2133, 2148]}, {"key": "authority-and", "type": "clause", "offset": [2385, 2398]}, {"key": "approval-of", "type": "definition", "offset": [2498, 2509]}, {"key": "the-special", "type": "definition", "offset": [2603, 2614]}, {"key": "planning-authority", "type": "clause", "offset": [2615, 2633]}, {"key": "to-the-authority", "type": "clause", "offset": [2739, 2755]}, {"key": "the-applicable", "type": "clause", "offset": [2781, 2795]}, {"key": "it-is-further-agreed-that", "type": "clause", "offset": [2852, 2877]}, {"key": "approval-by-the-authority", "type": "clause", "offset": [2890, 2915]}, {"key": "liabilities-under-this-agreement", "type": "clause", "offset": [2972, 3004]}, {"key": "this-clause", "type": "clause", "offset": [3092, 3103]}, {"key": "in-the-event", "type": "clause", "offset": [3124, 3136]}, {"key": "with-applicable-laws", "type": "clause", "offset": [3319, 3339]}, {"key": "extension-of-time", "type": "clause", "offset": [3397, 3414]}, {"key": "other-relief", "type": "clause", "offset": [3449, 3461]}, {"key": "the-review", "type": "clause", "offset": [3583, 3593]}, {"key": "responsible-for", "type": "clause", "offset": [3647, 3662]}, {"key": "relating-to-the-project", "type": "clause", "offset": [3711, 3734]}, {"key": "at-all-times", "type": "clause", "offset": [3796, 3808]}, {"key": "obligations-under-this-agreement", "type": "clause", "offset": [3836, 3868]}, {"key": "any-person", "type": "clause", "offset": [3925, 3935]}, {"key": "responsibility-for", "type": "clause", "offset": [4014, 4032]}, {"key": "the-technical", "type": "clause", "offset": [4033, 4046]}, {"key": "in-accordance-with-the-provisions-of-this-agreement", "type": "definition", "offset": [4176, 4227]}, {"key": "technical-feasibility", "type": "definition", "offset": [4259, 4280]}, {"key": "operational-capability", "type": "clause", "offset": [4282, 4304]}], "hash": "477ab12f4ebbefc451af0fe085388610", "id": 8}, {"snippet": "The building contractor undertakes to deliver a master plan to be approved by the contracting authority and its advisors within 15 calendar days following notification of contract conclusion. This plan must sufficiently anticipate situations to allow the contracting authority to take decisions or provide answers or supply the documents that are incumbent upon it. The master plan will be updated at least every month and must be consistent with the construction planning. It will be aligned with the construction planning and will be based on the same document. The contractor will be sole manager of the planning of all activities required to perform this contract. In particular he plans: - Set dates for delivering implementation plans that he needs, - The placing of orders to his suppliers and subcontractors, - The presentation in due time of samples and technical forms of products submitted for preliminary technical acceptance, - Measuring the works and the workshop manufacture period, - Indication of deadlines dates for decisions to be taken by the contracting authority, - Indication of deadline dates for the conclusion of modifications to orders being elaborated, - Indication of deadline dates for the achievement of works performed by other enterprises, - Registration, in due time, of the measurements of the works, - etc.", "samples": [{"hash": "1JF97dHEnKA", "uri": "/contracts/1JF97dHEnKA#master-plan", "label": "Public Works Contract", "score": 35.4420280457, "published": true}, {"hash": "ctr8F2zGTzv", "uri": "/contracts/ctr8F2zGTzv#master-plan", "label": "Public Works Contract", "score": 34.2343559265, "published": true}, {"hash": "kjEsEPpD5jG", "uri": "/contracts/kjEsEPpD5jG#master-plan", "label": "Public Works Contract", "score": 33.9605751038, "published": true}], "size": 21, "snippet_links": [{"key": "building-contractor", "type": "definition", "offset": [4, 23]}, {"key": "approved-by", "type": "definition", "offset": [66, 77]}, {"key": "authority-and", "type": "clause", "offset": [94, 107]}, {"key": "calendar-days", "type": "definition", "offset": [131, 144]}, {"key": "contract-conclusion", "type": "clause", "offset": [171, 190]}, {"key": "this-plan", "type": "definition", "offset": [192, 201]}, {"key": "to-allow-the", "type": "clause", "offset": [242, 254]}, {"key": "authority-to", "type": "definition", "offset": [267, 279]}, {"key": "the-documents", "type": "clause", "offset": [324, 337]}, {"key": "construction-planning", "type": "clause", "offset": [451, 472]}, {"key": "based-on", "type": "definition", "offset": [536, 544]}, {"key": "the-contractor-will", "type": "clause", "offset": [564, 583]}, {"key": "sole-manager", "type": "definition", "offset": [587, 599]}, {"key": "the-planning", "type": "clause", "offset": [603, 615]}, {"key": "activities-required", "type": "clause", "offset": [623, 642]}, {"key": "this-contract", "type": "definition", "offset": [654, 667]}, {"key": "in-particular", "type": "clause", "offset": [669, 682]}, {"key": "implementation-plans", "type": "clause", "offset": [720, 740]}, {"key": "placing-of-orders", "type": "clause", "offset": [762, 779]}, {"key": "suppliers-and-subcontractors", "type": "clause", "offset": [787, 815]}, {"key": "due-time", "type": "definition", "offset": [839, 847]}, {"key": "technical-acceptance", "type": "definition", "offset": [917, 937]}, {"key": "the-works", "type": "definition", "offset": [951, 960]}, {"key": "deadline-dates", "type": "clause", "offset": [1102, 1116]}, {"key": "conclusion-of", "type": "clause", "offset": [1125, 1138]}, {"key": "modifications-to-orders", "type": "clause", "offset": [1139, 1162]}, {"key": "of-works", "type": "clause", "offset": [1232, 1240]}, {"key": "performed-by", "type": "clause", "offset": [1241, 1253]}, {"key": "other-enterprises", "type": "clause", "offset": [1254, 1271]}], "hash": "45a5259bdc8b56fcbc975176b3767d3c", "id": 2}, {"snippet": "The Board and the Union agree that it is in the best interest of all stakeholders in the BCPSS that the parties to this Agreement work towards the realization of the goals set forth in the BCPSS Master Plan and its updates.", "samples": [{"hash": "hXO8PxG6FoQ", "uri": "/contracts/hXO8PxG6FoQ#master-plan", "label": "Collective Bargaining Agreement", "score": 35.2096748352, "published": true}, {"hash": "lqkQwEbeYNe", "uri": "/contracts/lqkQwEbeYNe#master-plan", "label": "Collective Bargaining Agreement", "score": 32.615688324, "published": true}, {"hash": "hCPOPeo8wfh", "uri": "/contracts/hCPOPeo8wfh#master-plan", "label": "Collective Bargaining Agreement", "score": 30.8490486145, "published": true}], "size": 19, "snippet_links": [{"key": "the-union", "type": "clause", "offset": [14, 23]}, {"key": "best-interest", "type": "clause", "offset": [48, 61]}, {"key": "the-parties-to-this-agreement", "type": "clause", "offset": [100, 129]}], "hash": "f39c3057ab2d5f255fe9ba51ea7fa090", "id": 3}, {"snippet": "147 The building contractor undertakes to deliver a master plan to be approved by the contracting authority and its advisors within 15 calendar days following notification of contract conclusion. \u00a7148 This plan must sufficiently anticipate situations to allow the contracting authority to take decisions or provide answers or supply the documents that are incumbent upon it. \u00a7149 The master plan will be updated at least every month and must be consistent with the construction planning. It will be aligned with the construction planning and will be based on the same document. \u00a7150 The contractor will be sole manager of the planning of all activities required to perform this contract. \u00a7151 In particular he plans:", "samples": [{"hash": "79TUJiM22fp", "uri": "/contracts/79TUJiM22fp#master-plan", "label": "Public Works Contract", "score": 32.8811912537, "published": true}, {"hash": "fMYyE4MkPBv", "uri": "/contracts/fMYyE4MkPBv#master-plan", "label": "Public Works Contract", "score": 32.8702430725, "published": true}], "size": 5, "snippet_links": [{"key": "building-contractor", "type": "definition", "offset": [8, 27]}, {"key": "approved-by", "type": "definition", "offset": [70, 81]}, {"key": "authority-and", "type": "clause", "offset": [98, 111]}, {"key": "calendar-days", "type": "definition", "offset": [135, 148]}, {"key": "contract-conclusion", "type": "clause", "offset": [175, 194]}, {"key": "this-plan", "type": "definition", "offset": [201, 210]}, {"key": "to-allow-the", "type": "clause", "offset": [251, 263]}, {"key": "authority-to", "type": "definition", "offset": [276, 288]}, {"key": "the-documents", "type": "clause", "offset": [333, 346]}, {"key": "construction-planning", "type": "clause", "offset": [465, 486]}, {"key": "based-on", "type": "definition", "offset": [550, 558]}, {"key": "the-contractor-will", "type": "clause", "offset": [583, 602]}, {"key": "sole-manager", "type": "definition", "offset": [606, 618]}, {"key": "the-planning", "type": "clause", "offset": [622, 634]}, {"key": "activities-required", "type": "clause", "offset": [642, 661]}, {"key": "this-contract", "type": "definition", "offset": [673, 686]}, {"key": "in-particular", "type": "clause", "offset": [693, 706]}], "hash": "e05752fe4d6374f7e56498400188601c", "id": 9}, {"snippet": "(1) The master plan shall be as shown in the Authority\u2019s Drawings. The master plan has been developed by the Authority to meet operational and technical criteria. The Contractor is not required to evaluate the master plan for compliance with these criteria, but shall review, verify and validate it with respect to his own design and construction proposals and shall also satisfy himself that there is no conflict with any existing structures (both underground and above ground) which are to be preserved. However, as a result of Contractor\u2019s detailed topographic survey, verification, staking and setting out of the master plan at site, if any error/ mismatch /conflict etc. is detected in Authority\u2019s Drawings, the Contractor shall undertake the required modifications in the Master Plan in agreement with the Engineer and as stipulated in the sub-clauses below without any additional cost or implications to the Authority.\n(2) The Contractor is permitted to propose deviations in Master Plan to suit his construction proposals or rectify any error/ mismatch/ conflict etc. detected in the Authority\u2019s Drawings, but he must demonstrate that any such deviations do not reduce the technical and operational performance. The Contractor needs to verify the Agreement boundaries while proposing any change in the master plan but such deviations shall require a Notice of No Objection from the Engineer subject to the following conditions:- \uf0b7 There is no extra cost to the Authority, \uf0b7 Changes proposed are absolutely essential to suit the Contractor\u2019s specific design or rectify any error/mismatch/conflict etc. detected in the Authority\u2019s Drawings. \uf0b7 There is no change at the Agreement boundaries and if there is any, the same shall have to be agreed by the Authority without any extra cost to the Authority.\n(3) The Contractor should note the existing land constraints outside of the station boundaries as shown on the drawings, and that no additional land will be made available by the Authority.", "samples": [{"hash": "2jKgKfSUZ1V", "uri": "/contracts/2jKgKfSUZ1V#master-plan", "label": "Schedule D", "score": 35.307559967, "published": true}, {"hash": "ctj2FhS1aRZ", "uri": "/contracts/ctj2FhS1aRZ#master-plan", "label": "Schedule D", "score": 28.2101306915, "published": true}, {"hash": "ieFj7UInfx6", "uri": "/contracts/ieFj7UInfx6#master-plan", "label": "Schedule D", "score": 28.1964416504, "published": true}], "size": 3, "snippet_links": [{"key": "as-shown", "type": "definition", "offset": [29, 37]}, {"key": "authority-to", "type": "definition", "offset": [109, 121]}, {"key": "technical-criteria", "type": "clause", "offset": [143, 161]}, {"key": "is-not-required-to", "type": "clause", "offset": [178, 196]}, {"key": "compliance-with", "type": "clause", "offset": [226, 241]}, {"key": "with-respect-to", "type": "clause", "offset": [299, 314]}, {"key": "construction-proposals", "type": "definition", "offset": [334, 356]}, {"key": "no-conflict", "type": "clause", "offset": [402, 413]}, {"key": "existing-structures", "type": "clause", "offset": [423, 442]}, {"key": "above-ground", "type": "definition", "offset": [465, 477]}, {"key": "of-contractor", "type": "clause", "offset": [527, 540]}, {"key": "topographic-survey", "type": "clause", "offset": [552, 570]}, {"key": "setting-out", "type": "clause", "offset": [598, 609]}, {"key": "the-contractor-shall", "type": "clause", "offset": [713, 733]}, {"key": "required-modifications", "type": "clause", "offset": [748, 770]}, {"key": "in-agreement", "type": "clause", "offset": [790, 802]}, {"key": "the-engineer", "type": "definition", "offset": [808, 820]}, {"key": "the-sub", "type": "clause", "offset": [842, 849]}, {"key": "additional-cost", "type": "clause", "offset": [876, 891]}, {"key": "to-the-authority", "type": "clause", "offset": [908, 924]}, {"key": "technical-and", "type": "clause", "offset": [1181, 1194]}, {"key": "operational-performance", "type": "clause", "offset": [1195, 1218]}, {"key": "to-verify", "type": "definition", "offset": [1241, 1250]}, {"key": "the-agreement", "type": "clause", "offset": [1251, 1264]}, {"key": "change-in", "type": "clause", "offset": [1296, 1305]}, {"key": "notice-of", "type": "clause", "offset": [1358, 1367]}, {"key": "no-objection", "type": "definition", "offset": [1368, 1380]}, {"key": "subject-to-the", "type": "definition", "offset": [1399, 1413]}, {"key": "extra-cost", "type": "definition", "offset": [1451, 1461]}, {"key": "no-change", "type": "definition", "offset": [1658, 1667]}, {"key": "agreed-by", "type": "clause", "offset": [1743, 1752]}, {"key": "the-drawings", "type": "definition", "offset": [1915, 1927]}, {"key": "additional-land", "type": "clause", "offset": [1941, 1956]}, {"key": "available-by", "type": "definition", "offset": [1970, 1982]}], "hash": "7fae0b6b15f683a8f44eb0fa877b2050", "id": 10}], "next_curs": "ClQSTmoVc35sYXdpbnNpZGVyY29udHJhY3RzcjALEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IhRtYXN0ZXItcGxhbiMwMDAwMDAwYQyiAQJlbhgAIAA=", "clause": {"children": [["optional-supplemental-indicators", "Optional Supplemental Indicators"], ["", ""], ["material-terms-of-the-charter", "Material Terms of the Charter"], ["description", "Description"], ["procedure-to-adopt-and-amend-master-plan", "Procedure to Adopt and Amend Master Plan"]], "size": 265, "parents": [["definitions", "DEFINITIONS"], ["oversight-to-allow-autonomy", "Oversight to Allow Autonomy"], ["general", "General"], ["funding", "Funding"], ["obligations-of-the-authority-and-master-plan", "Obligations of the Authority and Master Plan"]], "title": "Master Plan", "id": "master-plan", "related": [["improvement-plan", "Improvement Plan", "Improvement Plan"], ["improvement-plans", "Improvement Plans", "Improvement Plans"], ["management-plan", "Management Plan", "Management Plan"], ["operating-plan", "Operating Plan", "Operating Plan"], ["safety-plan", "Safety Plan", "Safety Plan"]], "related_snippets": [], "updated": "2026-03-19T05:56:49+00:00", "also_ask": ["What are the essential elements that must be included in a 'Master Plan' clause to ensure enforceability?", "How can the 'Master Plan' clause be strategically leveraged or limited during negotiations?", "What are the most common risks or ambiguities associated with 'Master Plan' clauses?", "How do courts typically interpret and enforce 'Master Plan' provisions in disputes?", "How does the 'Master Plan' clause compare to similar planning or integration clauses in other jurisdictions or industries?"], "drafting_tip": "Specify the required elements of the Master Plan to ensure clarity; set deadlines for submission and approval to maintain project timelines; define amendment procedures to manage changes efficiently.", "explanation": "The Master Plan clause defines the overarching blueprint or schedule that governs the execution of a project or development. It typically outlines the key phases, milestones, and deliverables, serving as a reference point for all parties involved. For example, it may specify timelines for design, construction, and completion, as well as the responsibilities of each party at different stages. This clause ensures that everyone is aligned on the project's scope and sequence, helping to coordinate activities and manage expectations throughout the project's lifecycle."}, "json": true, "cursor": ""}}