Male Cabin Sample Clauses

Male Cabin. Attendant ITEMS RENEWAL 1 jacket or 1 additional pair of pants Every year – Mandatory
AutoNDA by SimpleDocs
Male Cabin. Attendant ITEMS RENEWAL 1 jacket or 1 additional pair of pants Every year 3 pairs of pants Every 2 years 2 tie clips Every 2 years 6 shirts (short sleeve and/or long sleeve, as the Cabin Attendant prefers) Every year 2 ties Every year 1 belt Every 2 years 2 insignia pins Every 2 years 1 cardigan or sleeveless vest Every 2 years 1 all-season coat or 1 raincoat Every 4 years ACCESSORIES 1 suitcase Every 5 years 1 wheeled carry-on suitcase Every 3 years 1 tote bag Every 3 years NOTE: For each month of leave of absence without pay, sick leave, maternity leave and temporary lay off, the uniform renewal date will be postponed by one month. When the Company hires Cabin Attendants, all the while knowing that there will be a considerable number of subsequent seasonal layoffs, those Cabin Attendants will have a reduced uniform, the details of which must be agreed with the Union. The suitcases and travel bags of the union officers are renewable on the same terms as all Cabin Personnel; however, if a new model becomes available, they may obtain the new model as soon as they return to active duty as a Cabin Attendant. If the change of suitcase is due to a health and safety issue, it will be replaced for union officers who are fully released from work.

Related to Male Cabin

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Weighing and Scaling Costs Purchaser agrees to pay for all weighing costs for logs delivered regardless if logs are purchased on a weight or scale basis. In addition, Purchaser agrees to pay for all scaling costs for logs delivered on a scale basis. Purchaser also agrees to pay for all costs associated with the transmission and reporting of scale or weight data.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Gouvernement des États-Unis Le logiciel et la documentation constituent des « Commercial Items » (éléments commerciaux), tel que ce terme est défini dans la clause 48 C.F.R. (Code of Federal Rules) §2.101, consistant en « Commercial Computer Software » (logiciel) et « Commercial Computer Software Documentation » (documentation), tels que ces termes sont utilisés dans les clauses 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202. Conformément à la clause 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202-1 à 227.7202-4, le « Commercial Computer Software » et le « Commercial Computer Software Documentation » sont fournis sous licence au gouvernement des États-Unis (a) uniquement comme « Commercial Items » et (b) uniquement accompagnés des droits octroyés à tous les autres utilisateurs conformément aux termes et conditions ci-inclus. Droits non publiés réservés en vertu de la législation des droits d’auteur en vigueur aux États-Unis.

  • Transfer and Seniority Outside the Bargaining Unit (a) It is understood that an employee shall not be transferred by the Hospital to a position outside the bargaining unit without his consent except in the case of temporary assignments not exceeding six (6) months. Such employees on temporary assignments shall remain members of the bargaining unit.

  • Transfers and Seniority Outside Bargaining Unit No employee shall be transferred to a position outside the bargaining unit without the employee's consent. If an employee is transferred to a position outside of the bargaining unit, the employee shall retain seniority acquired at the date of leaving the unit, but will not accumulate any further seniority. If such an employee later returns to the bargaining unit, the employee shall be placed in a job consistent with the employee's seniority. Such return shall not result in the layoff or bumping of an employee holding greater seniority.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Porcupine Site Highway 11

Time is Money Join Law Insider Premium to draft better contracts faster.