– Load and Stress Testing Clause Samples
– Load and Stress Testing. Load and stress testing include high availability and disaster recovery testing. The Contractor shall be responsible for load and stress testing for the System as well as validation of fault tolerance and planned disaster recovery capabilities of the System. Load and stress testing validate the System’s ability to continue operations under maximum loads and stressed conditions. The Contractor is expected to load the System to a minimum of 125% of the number of planned users and volume of transactions using automated loading tools. The Contractor is also responsible to conduct a complete run through of the System’s fault tolerance and disaster recovery technologies and processes. Contractor shall prepare a Load and Stress Test Report documenting all the test results including any errors and resolutions identified as a part of the load and stress test. Contractor shall provide the following:
