LNG Cargoes Unloading Plan Sample Clauses

LNG Cargoes Unloading Plan. Year Month Desired LNG Desired Date for Name of LNG Cargo Estimated LNG Cargo the Beginning of LNG Quantity Cargo Discharge Unloading Day the Initial LNG Vessel [MWh] Time Unloading [hours] Period ANNEX 2 ACCEPTANCE OF THE APPLICATION FOR THE PROVISION OF BASIC LNG SERVICE With regards to the Application for the Provision of Basic LNG Service number the following are agreed :
AutoNDA by SimpleDocs
LNG Cargoes Unloading Plan. Year Month Desired LNG Cargo Unloading Day Desired Date for the Beginning of the Initial LNG Unloading Name of LNG Vessel LNG Cargo Quantity [MWh] Estimated LNG Cargo Discharge Time [hours] Period The present document is an integral part to the LNG Facility Usage Agreement. For the Operator For the LNG User (Signature) (Signature) (Full name) (Full name) ANNEX 3 SAMPLE BANK LETTER OF GUARANTEE TO: NO. ..................

Related to LNG Cargoes Unloading Plan

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • System for Award Management (XXX) Requirement Alongside a signed copy of this Agreement, Grantee will provide Florida Housing with a XXX.xxx proof of registration and Commercial and Government Entity (CAGE) number. Grantee will continue to maintain an active XXX registration with current information at all times during which it has an active award under this Agreement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • DISTRIBUTION OF CONTRACTOR PRICE LIST AND CONTRACT APPENDICES Contractor shall provide Authorized Users with electronic copies of the Contract, including price lists and Appendices, upon request. OGS CENTRALIZED CONTRACT MODIFICATIONS Contract Updates will be handled as provided in Appendix C – Contract Modification Procedures.

  • Training Plan Within 90 days after the Effective Date, Good Shepherd shall develop a written plan (Training Plan) that outlines the steps Good Shepherd will take to ensure that: (a) all Covered Persons receive adequate training regarding Good Shepherd’s CIA requirements and Compliance Program, including the Code of Conduct and (b) all Relevant Covered Persons receive adequate training regarding: (i) the Federal health care program requirements regarding eligibility for hospice services upon initial admission, recertification for continued stay, and for Continuous Care, Respite Care, and General Inpatient Care; (ii) the role of physicians in making eligibility determinations; (iii) the accurate coding and submission of claims; (iv) policies, procedures, and other requirements applicable to the documentation of medical records; (v) the personal obligation of each individual involved in the claims submission process to ensure that such claims are accurate; (vi) applicable reimbursement statutes, regulations, and program requirements and directives; (vii) the legal sanctions for violations of the Federal health care program requirements; and (viii) examples of proper and improper eligibility determinations, documentation, and claims submission practices. The Training Plan shall include information regarding the training topics, the categories of Covered Persons and Relevant Covered Persons required to attend each training session, the length of the training, the schedule for training, and the format of the training. Within 30 days of the OIG’s receipt of Good Shepherd’s Training Plan, OIG will notify Good Shepherd of any comments or objections to the Training Plan. Absent notification by the OIG that the Training Plan is unacceptable, Good Shepherd may implement its Training Plan. Good Shepherd shall furnish training to its Covered Persons and Relevant Covered Persons pursuant to the Training Plan during each Reporting Period.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.