Line Diagram Sample Clauses

Line Diagram. Appendix E Estimated Milestones The worldwide outbreak of the coronavirus disease (“COVID-19”) affects or is likely to affect usual business activities and/or the execution of work under this Agreement. As the impacts from COVID-19 are unknown at this time, commitments regarding the estimated milestones and schedule set forth below are provided without consideration of such potential impacts from COVID-19. The Parties are closely monitoring the development of COVID-19 and its associated impacts, and will exercise good utility practice and endeavor to cooperate to address any issues, including but not limited to, manufacturing, supply chain, operations, logistics, and personnel issues, relating to the scope of this Agreement. If required to overcome the consequences directly or indirectly caused by the outbreak of COVID-19, Parties shall be entitled to reasonable relief from meeting the estimated milestones set forth below and in this Agreement. Item Milestone Responsible Party Due Date 1/ 1 Commence Engineering IID May 26, 2020 Completed 2 Commence development activities including commencement of regulatory approvals; acquisition of land; and permits IID May 29, 2020 Completed 3 Submit Construction Plan in accordance with Section 4.2.4.1 of this Agreement IID September 1, 2020 4 Submit Construction Plan Status Report in accordance with Section 4.2.4.2 of this Agreement IID November 30, 2020 5 Submit Project modification in accordance with Section 4.2.6.1 of this Agreement IID As required per Section 4.2.6.1 Milestone Responsible Party Due Date 1/ 6 Provide comments on Project modifications in accordance with Section 5.6.1 of the S-Line Entitlement Agreement Citizens will contract with CAISO in accordance with the S-Line Entitlement Agreement 30 calendar days after modification submittals under Milestone 5 7 Commence Procurement IID December 4, 2020 8 Submit Construction Plan Status Report in accordance with Section 4.2.4.2 of this Agreement IID February 28, 2021 9 Commence Construction IID May 28, 2021 10 Submit Construction Plan Status Report in accordance with Section 4.2.4.2 of this Agreement IID May 29, 2021 August 27, 2021 November 25, 2021 February 23, 2022 May 24, 2022 August 22, 2022 November 20,2022 February 18, 2023 11 Commence Testing IID March 31, 2023 12 Latest Energization Date IID April 27, 2023 13 Submit Construction Plan Status Report in accordance with Section 4.2.4.2 of this Agreement IID May 19, 2023 14 Complete Construction IID August ...
AutoNDA by SimpleDocs
Line Diagram. This drawing must include all the equipment shown on the one line diagram and all information necessary for correct phasing.
Line Diagram. This should be similar to the Figure below. If different, mark the differences on the diagram below or provide a new diagram.
Line Diagram. The diagram shall include, at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the Member Generator’s DG Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.
Line Diagram. Appendix B Estimated Milestones

Related to Line Diagram

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Line Outage Costs Notwithstanding anything in the NYISO OATT to the contrary, the Connecting Transmission Owner may propose to recover line outage costs associated with the installation of Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades on a case-by-case basis.

  • _CheckoutDate_ _CheckoutTime_ Rental $_Rental_ Fees $_Fees_ Taxes $_AreaTax_ Total $_NetAmount_ Security Deposit $_RefundableSecurityDeposit_ Deposit $_DepositAmount_ (due _DepositDueDate_) Balance $_BalanceAmount_ (due _BalanceDueDate_) AGREEMENT Whistler Prime Vacation Properties (WPVP), the Agent of the Owners, and Tenant agree as follows: Above Tenant is at least twenty-five (25) years of age (an "adult") and will be an occupant of the vacation property listed above during the entire reserved dates. In addition to Tenant, other authorized occupants may be family members or friends of Tenant. Use of the premises will be denied to persons not falling within the foregoing categories. Should any unauthorized persons occupy or use the Premises, Tenant will be required to vacate the premises immediately without the possibility of a refund. Premises keys will not be issued to anyone who is not an adult. RESERVATIONS Reservations may be placed up to two (1) year in advance, but are subject to the rates in effect for the year said reservations are placed. All times are Pacific Standard Time and currency is CAD unless otherwise noted. While every effort will be made to have the property available for check in at 4pm CheckinTime, during high season, a cleaning crew may require additional cleaning time and check in may be delayed up to 6:00 pm. RESERVATION DEPOSIT A deposit totaling 35% of the agreed upon total amount is due with acceptance of rental agreement. Payment of deposit shall be deemed as acceptance of this rental agreement. Payment may be made by major credit card service offered by WPVP at time of reservation. We accept VISA or MASTERCARD.

  • Electronic Invoicing (eInvoicing The Contractor may supply electronic invoices in lieu of paper-based invoices for those transactions processed through MFMP. Contractor may establish electronic invoicing within ninety (90) days of written request to the Department. Electronic invoices shall be submitted to the Customer through the Ariba Network (AN) in one of three mechanisms as listed below. The Contractor will work with the MFMP management team to obtain specific requirements for the eInvoicing.

  • Grid The salary level for each benchmark is identified as a “grid” and the corresponding dollar amount is in Wage Schedules – Grids of the Maintenance Plan. For example: Grid: 9 Wage Schedules - Grids - April 1, 2013 $2,923 per month

  • ELECTRONIC WORKFLOW SYSTEM OGS reserves the right to incorporate an electronic workflow system that may include elements of the Authorized User RFQ process. OGS reserves the right to post Authorized User Contract usage of Centralized Contracts. TRAVEL, MEALS AND LODGING - LOT 4 – IMPLEMENTATION ONLY For Lot 4 only, when provided for in the RFQ and resultant Authorized User Agreement, the Authorized Users may reimburse travel expenses. All rules and regulations associated with this travel can be found at xxxx://xxx.xxxxx.xx.xx/agencies/travel/travel.htm. In no case will any travel reimbursement be charged that exceeds these rates. All travel will be paid only as specified within the Authorized User Agreement and must be billed with the associated services on the same Invoice with receipts attached. The Contractor shall receive prior approval from the Authorized User for any travel that occurs during the term of an Authorized User Agreement. Parking fees and/or parking tickets shall not be paid by an Authorized User. Unless otherwise specified in writing by the Authorized User, a vehicle will not be provided by Authorized User to the Contractor for travel. Therefore, the Contractor will be responsible for ensuring that the Contractor has access to an appropriate vehicle (e.g., personal vehicle or rental vehicle) or common carrier with which to carry out any necessary travel. For the Contractor to obtain reimbursement for the use of a rental vehicle, such use must be justified as the most cost- effective mode of transportation under the circumstances (including consideration of the most effective use of time). The Contractor is responsible for keeping adequate records to substantiate any claims for travel reimbursement. All services provided under the resultant Authorized User Agreement must be performed within CONUS. PERFORMANCE AND BID BONDS There are no BONDS for this Contract. However, an Authorized User may require in an RFQ a performance, payment or Bid bond, or negotiable irrevocable letter of credit or other form of security for the faithful performance for the resultant Authorized User Agreement. CONTRACTOR REQUIREMENTS AND PROCEDURES FOR PARTICIPATION BY NEW YORK STATE CERTIFIED MINORITY- AND WOMEN-OWNED BUSINESS ENTERPRISES AND EQUAL EMPLOYMENT OPPORTUNITIES FOR MINORITY GROUP MEMBERS AND WOMEN I. New York State Law Pursuant to New York State Executive Law Article 15-A and Parts 140-145 of Title 5 of the New York Codes, Rules and Regulations (“NYCRR”), the New York State Office of General Services (“OGS”) is required to promote opportunities for the maximum feasible participation of New York State-certified Minority- and Women-owned Business Enterprises (“MWBEs”) and the employment of minority group members and women in the performance of OGS contracts.

  • Activation We will notify the Xxxxxx of your request to receive electronic billing information. The presentment of your first electronic bill may vary from Xxxxxx to Xxxxxx and may take up to sixty (60) days, depending on the billing cycle of each Xxxxxx. While your electronic bill feature is being activated it is your responsibility to keep your accounts current. Each electronic Xxxxxx reserves the right to accept or deny your request to receive electronic bills.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Temporary Disconnection Temporary disconnection shall continue only for so long as reasonably necessary under Good Utility Practice.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

Time is Money Join Law Insider Premium to draft better contracts faster.