Licence Area Clause Samples

Licence Area. 4.1 The Licence Area will be handed over to the Licensee in its “as is” condition on the Commencement Date. 4.2 The Licensee must accept the Licence Area on an “as is” basis and its condition as of the Commencement Date. The Licensee must be liable for any damage or deterioration to the Licence Area thereafter. 4.3 The Licensee must physically take up the Licence Area during the period specified in Clause 5 below, failing which the Government may, in its sole discretion, dispose of the Licence Area for any other purposes.
Licence Area. 2.01 The Licence covers an area delineated by the corner coordinates indicated in Appendix 1. A map of the Licence Area is attached as Appendix 2. 2.02 In case of any inconsistency between the corner coordinates indicated in Appendix 1 and the map of the Licence Area in Appendix 2 the corner coordinates shall take precedence over the map of the Licence Area. 2.03 The Licence Area covers land areas only, unless otherwise provided in Appendix 1. The boundary between land area and the adjoining sea area follows the mean sea level. 2.04 If the Licence Area or parts thereof cease to be under Danish sovereignty, the Licensee shall respect such change in the status of the Licence Area and have no claim against the Greenland Self-Government or the Danish State as a result of or in connection with such change or its direct or indirect consequences.
Licence Area. 2.01 This Licence covers an area delineated by connecting the corner coordinates stated in Appendix 1 in the order stated in Appendix 1 by latitudes and longitudes. A map of the Licence Area is contained in Appendix 2. 2.02 In case of any inconsistency between the corner coordinates and delineations stated in Appendix 1 and the map of the Licence Area in Appendix 2, the corner coordinates and delineations stated in Appendix 1 shall take precedence over the map of the Licence Area. 2.03 The Licence Area covers land areas only, unless otherwise provided in Appendix 1. The boundary between land area and the adjoining sea area follows the mean sea level. 2.04 If the Licence Area or parts thereof cease to be under Danish sovereignty, the Licensee shall respect such change in the status of the Licence Area and have no claim against the Greenland Self-Government or the Danish State as a result of or in relation to such change or its direct or indirect consequences. Any such change in the status of the Licence Area or parts thereof shall not have any effect on the remainder of the Licence Area, if any.
Licence Area. (1) The Licence shall apply to the area indicated on the attached map, with the attendant corner coordinates and blocks shown in Annex 1. (2) The corner coordinates are stated in geographical coordinates based on the European Datum 1950 (ED50). The block division in the Danish area is based on blocks having a size of 7.5 minutes of latitude and 15 minutes of longitude. (3) Where the area covered by this Licence, or any part of it, is not within, or is withdrawn from, Danish sovereignty under rules of international law, including any international treaties, the Licencee shall be bound by any resulting restriction of the area, and shall not on this account have any claim whatsoever against the Danish Energy Agency or otherwise against the Danish State.
Licence Area. None specified
Licence Area. True North Gems Greenland plans to set up a corundum mine with the necessary infrastructure and facilities for processing of ore onsite. The corundum deposit is located on and under a peninsula in the lake Ukkaata Qaava. The lake does not have an official name, but the name Ukkaata Qaava has been suggested. The lake is situated approximately 230 meters above sea level and approximately 3 km from the fjord Tasiusaa. The access to Tasiusaa from the fjord Tasiusarsuaq is through a narrow and shallow “Inner channel”, and the access to Tasiusarsuaq from the open sea is through another shallow narrowing named the “Outer channel”. The peninsula, where the mine is located, divides the lake into two basins. A.1.1.1 The installations and facilities in the licence area will comprise: a. An open pit mine, which during the course of 9 years will open to a size of about 200 m x 150 m and a depth of up to 70 m. b. A camp with room for up to 60 people in the construction phase and about 48 in the production phase. c. The camp is equipped with a power generator, water source, wastewater processing. The camp is located near the fjord. d. A harbour with a pier outside the Inner Channel. e. A processing facility close to the mine for crushing, screening, washing and sorting of ore into a raw concentrate (“dirty rough”). f. A helicopter landing pad, fuel depot, and storage of explosives. g. The necessary roads to connect the installations and facilities. h. A quarry is needed to provide building materials for the first roads and buildings. Later in the project, the excess material from the mine may be used. A.1.1.2 Process description in the Licence Area The mine is designed for an expected lifetime of 9 years, with a possibility for ex- tension (subject to approval by the Government of Greenland). The table below shows the latest estimation for the annual amount of ore expected to be mined for each of the 9 years: Year Tonnes 2015 2,849 2016 12,745 2017 16,560 2018 22,792 2019 22,820 2020 23,564 2021 26,142 2022 31,118 2023 31,178 To ensure a safe working environment in the mine, the water level in the lake will be lowered by 10 meters. This will be done by excavating a new channel parallel to the existing outflow from the western basin. The ore is located in a relatively small zone, and approximately 2.97 million tonnes (corresponding to 94 %) of the extracted material of approximately 3.17 million tonnes is waste rock. The ore will be crushed to gravel-size, and after the c...