Land Contamination Sample Clauses

Land Contamination. The Operator shall not, in performing the Services, cause or knowingly permit contamination of any land by any deliberate or accidental disposal, including, without limitation, leakage or spillage of any Dangerous Substance.
AutoNDA by SimpleDocs
Land Contamination. (a) No development works are to be undertaken on the site until such time as a detailed design (stage 2) development application has been submitted to and approved by the City.
Land Contamination. 3.1.8.1. The Project is located at low-laying area which was used as agricultural land in the past. It is currently unoccupied and covered with grasses with a few numbers of shrubs. In view of this, land contamination issue is not expected.
Land Contamination. 4.7.1.1 No land contamination impact would be anticipated from the Project, therefore, no monitoring or audit is required.
Land Contamination. 3.6.1 The potential contaminative land use within the Study Area and their potential impacts to the future development has been assessed which involved desktop review, site surveys and proposed environmental site investigation (SI).
Land Contamination. 3.6.1 The potential land contamination impacts in the study area resulting from the planned development have been examined. No land contamination impacts are expected during the operational phase of the development, however, there would be land contamination concerns associated with handling contaminated soil by construction workers at A King Marine shipyard.
Land Contamination. 2.1 There has been no spill, leakage, emission, discharge, escape or deposit into, on, or from the Properties of any Hazardous Substances since the Relevant Date (nor to the best of the knowledge, information and belief of the Vendors prior to the Relevant Date) to land, air or water (including ground water) in such quantities which may cause material harm to health or to the environment.
AutoNDA by SimpleDocs
Land Contamination. 4.6.1 The incinerator furnace of approximately 3m3 (0.75m (W) x 2.5m (H) x 1.5m (D)), consisted of one combustion chamber. The incinerator was constructed with a durable steel fabrication structure with a high temperature resistance lining and insulating refractory ceramic bricks on solid concrete base which built on top of a concrete slab in the incinerator room. The concrete base and slab are considered are to be in good condition.
Land Contamination. No development works are to be undertaken on the site until such time as a detailed development application which includes site remediation works has been submitted to and approved by the City. The detailed development application must at a minimum must include a Detailed Environmental Site Investigation, a Remediation Action Plan and a Review by NSW EPA Site Auditor that demonstrates the requirements of State Environmental Planning Policy No 55 are addressed. SCHEDULE 2 PRESCRIBED CONDITIONS The prescribed conditions in accordance with Division 8A of the Environmental Planning and Assessment Regulation 2000 apply to the development. Refer to the NSW State legislation for full text of the clauses under Division 8A of the Environmental Planning and Assessment Regulation 2000. This can be accessed at: xxxx://xxx.xxxxxxxxxxx.xxx.xxx.xx SCHEDULE 3
Land Contamination. Any subsequent DAs for the detailed design of buildings must include reports and documentation to address the requirements of State Environmental Planning Policy No 55—Remediation of Land. (105) ACCESS AND FACILITIES FOR PERSONS WITH DISABILITIES Detailed building designs must provide access and facilities for people with a disability in accordance with the Building Code of Australia.
Time is Money Join Law Insider Premium to draft better contracts faster.