Isolation Device. Owner/Operator shall install a manual load-break disconnect switch with a clear visible indication of switch position between BEMC's electric system and Owner/Operator's Generator. The Isolation Device shall be installed and maintained as specified in the applicable engineering standards. The Owner/Operator shall adhere to any disconnect order or actual disconnect and shall not attempt to re-engage without obtaining BEMC’s authorized consent.
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement