Interpretation and terminology Sample Clauses

Interpretation and terminology. If required include here definitions additional to those used in the conditions of contract which are required only for the purpose of making the Service Information easier to draft and read. Also list abbreviations used and provide a full interpretation of each one, for example: The following abbreviations are used in this Service Information: Abbreviation Meaning given to the abbreviation OBL Outside battery limits 2 Management strategy and start up.
AutoNDA by SimpleDocs
Interpretation and terminology. The following abbreviations are used in this Service Information: Abbreviation Meaning given to the abbreviation CNC Customer Network Centre OHSACT Occupational Hygiene and Safety Act SABS South African Bureau of Standards ISO International Organization for Standardization SANS South African National Standards XXX Xxxxx Xxxx Xxxxxx Xxxxxxxxxx X/X Not Applicable
Interpretation and terminology. The following abbreviations are used in this Works Information: Abbreviation Meaning Given to the abbreviation NEC New Engineering Contract ECC Engineering & Construction Contract SOW Scope of Work HP High Pressure LP Low Pressure SAIW South African Institute of Welding IWS International Welding Supervisor IWP International Welding Practitioner IW International Welder DA Dearator DST Dearator Storage Tank EFP Electric Feed Pump SFP Steam Feed Pump BFPT Boiler Feed Pump Turbine CDV Condenser Drain Vessel GSC Gland Steam Condenser SAE Steam Air Ejector WAE Water Air Ejector NRV Non-Return Valve RFWT Reverse Flow Water Tank MOT Main Oil Tank FRF Fire Resistant Fluid IP Intermediate Pressure H2 Hydrogen FW Feed Water CW Cooling Water Circ P/P Circulating Pump FAC Flow Accelerated Corrosion WPQR Welding Procedure Quality Record PQR Procedure Quality Record WPS Welding Procedure Specification NDT Non-Destructive Testing MPI Magnetic Particle Inspection UT Ultrasonic Testing PT Penetrate Testing PWHT Post Weld Heat Treatment HT Hardness Testing PMI Material Identification RT X-Rays FME Foreign Material Exclusion WRR Weld Repair Rate LAR Limited Access Register GO General Overhaul IR Interim IN/AD Inspection/Air Heater & Ducting Inspection HC Hot Condenser CC Cold Condenser S/S Stainless Steel M/S Mild Steel C/S Carbon Steel NB Nominal Bore NB Note M Meters MM Millimetres 0 Degrees % Percentage M/L Meter Level LH Left Hand RH Right Hand P/P Pump Isol Isolating Ctrl Control Reg Regulating Mot Motorized ASS Assistant Shift Supervisor SPO Senior Plant Operator RP Responsible Person AS Authorized Supervisor AP Appointed Person QA Quality Assurance QC Quality Control QCP Quality Control Plan PTW Permit to Work Qty Quantity EA Each NT Normal Time OT Overtime EW Early Warning CE Compensation Event
Interpretation and terminology. The following abbreviations and terminology are used in this Service Information: Abbreviation Meaning given to the abbreviation NDT Non - destructive testing GO General overhaul KPI Key performance Indicators QCP Quality Control plan MGO Mini General overhaul SSM Site services manager QIP Quality Inspection Plan 2 Management strategy and start up.
Interpretation and terminology. In this DPA, the following terms shall have the following meanings:
Interpretation and terminology. N/A N ote:Tenderers to indicate the Gauteng Operational Unit Tendering for on the first page of the NEC document.
Interpretation and terminology.  All definitions in the Employer’s Works Information apply except where it is inconsistent with the context. In the event of conflict with other parts of the contract document, then these definitions take precedence only in the Employer’s Works Information  The drawings, specifications and standards listed in the Employer’s Works Information form an integral part of the Works Information. In case of a conflict between a referenced specification, guideline, standard or drawing and the Employer’s Works Information, the order of precedence is: o The Employer’s design/construction drawings o The Employer’s specifications, standards and guidelines; o The Employer’s typical drawings; o National specifications, standards and guidelines.
AutoNDA by SimpleDocs
Interpretation and terminology. For the purpose of interpreting this Service Information the following terminology shall apply: The term ‘service’, like all italicised terms used in the NEC3 Term Service Contract (June 2005), is identified in the Contract Data and is the title given to the overall scope of service in this contract. For this contract service is identified as the Kusile power station sootbloower maintenance service. Activities to be undertaken by the Contractor in performing the service are generally referred to as ‘items of work’. For this contract, secondary Option X19 of the NEC3 Term Service Contract (June 2005) has been selected which allows for work to be instructed by Task Order. A Task is defined as work within the service which the Service Manager may instruct the Contractor to carry out through Site Service Managers within a stated period of time. Tasks are identified at each power station for example, within outages, regular site maintenance, and other ad hoc work or project. Each Task Order will contain a priced list of items of work within the Task. Where the word ‘service’ is not italicised, it shall be given its common meaning. The terms ‘site’ or ‘power station site’ used in this Service Information means the area used by the Employer for the purpose of owning and operating the power stations. It must not be confused with the term Site used in other NEC contracts. The Affected Property identified in the Contract Data for this contract is an area or facility within these sites but it is not the whole of the site.
Interpretation and terminology. The following abbreviations are used in this Service Information: Abbreviation Meaning given to the abbreviation OBL Outside battery limits 2 Management strategy and start up.
Interpretation and terminology. The following abbreviations are used in this Works Information: Abbreviation Meaning given to the abbreviation AFC Approved for construction OBL Outside battery limits PM Project Manager CPE Contract Project Engineer CPM Contract Project Manager EMP Environmental Management Program PE Project Engineer PES Project Engineer Specialist FDP Final Design Package T&Q Technology and Quality Department - Eskom 2 Management and start up.
Time is Money Join Law Insider Premium to draft better contracts faster.