Common use of Interconnection Handbook Clause in Contracts

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.

Appears in 3 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility –The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the –the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.

Appears in 2 contracts

Samples: Service Agreement, Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA Agreement and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA Agreement shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's ’s Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator CorporationCAISO, control balancing authority area, or the Distribution Provider's ’s requirements, including those set forth in the Generator Interconnection AgreementAgreement For An Existing Small Generating Facility. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's ’s Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Generator Interconnection AgreementAgreement For An Existing Small Generating Facility, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISOCAISO’s operational control and are part of the ISO CAISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's ’s Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. 14-911 3 11/2011 Attachment 2 Description and Costs of the Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.. Attachment 3 One-line Diagram Depicting the Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades Attachment 4 Milestones In-Service Date: Critical milestones and responsibility as agreed to by the Parties: Milestone/Date Responsible Party

Appears in 1 contract

Samples: Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERCthe Commission. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or Request of any other valid interconnection request to the Distribution Provider or the ISO, ISO with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator CorporationOperator, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Transmission Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility – The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the – The Distribution Provider's Wholesale Distribution Tariff through which open access transmission distribution service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System System, at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, Distribution Owner or the Distribution Transmission Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.. Interconnection Facilities The estimated costs below include interconnection and/or system upgrades required tointerconnect the Project to PG&E’s distribution system. Engineering Protection Review, Pre-parallel review, maintenance and operations support *$10,000.00 New 12kv service to customer’s switchgear. $15,000.00 Install required riser switch (to be considered required disconnect) $20,000.00 PG&E RTU and related support work at PG&E’s operation center (to meet visibility requirement for over 1MW) $33,000.00 Install new 12kV primary metering $21,000.00 *Cost of Ownership Does Not Apply Subtotal $99,000.00 Total $99,000.00 ITCC Tax Monthly Cost of Ownership = Total x 0.48% $427.20 Equivalent One-Time Charge = Total x .48% x 12 x 13.07 $67,002.05

Appears in 1 contract

Samples: Small Generator Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility -The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment. Small Generating Facility: See Attachment 5 for a description of the generating facility. The Distribution Provider’s Interconnection Facilities, Network Upgrades and Distribution Upgrades described in this Attachment 2 to the SGIA are based on the Distribution Provider’s preliminary engineering and design. Such descriptions are subject to modification to reflect the actual facilities that are constructed and installed following the Distribution Provider’s final engineering and design, identification of field conditions, and compliance with applicable environmental and permitting requirements.

Appears in 1 contract

Samples: Service Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility -The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment. The Distribution Provider’s Interconnection Facilities, Network Upgrades and Distribution Upgrades described in this Attachment 2 are based on the Distribution Provider’s preliminary engineering and design. Such descriptions are subject to modification to reflect the actual facilities constructed and installed following the Distribution Provider’s final engineering and design, identification of field conditions, and compliance with applicable environmental and permitting requirements.

Appears in 1 contract

Samples: Service Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility – The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the – the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.

Appears in 1 contract

Samples: Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERCthe Commission. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, Request or any other valid interconnection request to the Distribution Provider or the ISO, ISO with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator CorporationOperator, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Transmission Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility – The Interconnection Customer's device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the – The Distribution Provider's Wholesale Distribution Tariff through which open access transmission distribution service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System System, at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, Facilities and Metering Equipment Central Marin Sanitation Agency, an Interconnection Customer (IC), has requested a Generating Facility (GF) interconnection for CMSA Renewable Energy Expansion (Project) to the Pacific Gas and Electric Company (PG&E)’s distribution system for a 750kW Synchronous generating facility to be located at 0000 Xxxxxxxx Xx, San Rafael, CA 94901. The Generating Facility will be connected to PG&E’s San Xxxxxx 1103 distribution circuit. Interconnection will be in accordance with FERC’s Generator Interconnection Procedures. This Project has been assigned the queue number of 1384-WD. Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, Distribution Owner or the Distribution Transmission Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment. Project Information Project Name: CMSA Renewable Energy Expansion Number of Generators: 1 Manufacturer Model Name & Number: Waukesha V6F4BGLD Number of Inverters: N/A Manufacturer Model Name & Number: N/A Total Output: 0.750MW Transformer Data (PG&E-owned): 1,500kVA @ Z = 5.89% 12kV / 0.48kV Delta – Wye Grounded PG&E Grid Voltage at Interconnection: 480 V Interconnection Facilities The estimated costs associated with the Interconnection Facilities required to interconnect the project to Distribution Provider’s Distribution System. Interconnection Facilities (Subject to Cost-of-Ownership) Costs Pre-parallel inspection, protection review and testing witnessing $10,000.00 PG&E Secondary Revenue Metering $5,000.00 Secondary Service (existing) n/a Visible, lockable disconnect switch (by IC) n/a Ground fault detection bank (by PG&E) $45,000.00 Total -- Interconnection Facility Costs (Subject to Cost-of-Ownership) $60,000.00 ITCC Tax1 TBD 1 Not subject to ITCC (Income Tax Calculation Component) on contribution. ITCC is exempt for wholesale generators that meet the IRS Safe Harbor Provisions. PG&E currently does not require the Interconnection Customer to provide security to cover the potential tax liability on the Interconnection Facilities, Distribution Upgrades, and Network Upgrades per the IRS Safe Harbor Provisions (IRS Notice 88-129). PG&E reserves the right to require, on a nondiscriminatory basis, the Interconnection Customer to provide such security, in a form reasonably acceptable to PG&E as indicated in Article 11 of the SGIA, an amount up to the cost consequences of any current tax liability. Upon request and within sixty (60) Calendar Days’ notice, the Interconnection Customer shall provide PG&E such ITCC security or ITCC payment in the event that Safe Harbor Provisions have not been met, in the form requested by PG&E. Attachment 3 One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades One-Line Conceptual Diagram of CMSA Renewable Energy Expansion Figure 3-1 *Note: Point of Interconnection (POI) is at termination of conductor on low side of PG&E-owned transformer. Point of Common Coupling (PCC) is at the termination of conductor in the PG&E metering cabinet. Vicinity Map of CMSA Renewable Energy Expansion Figure 3-2 Attachment 4 Milestones In-Service Date: January 18, 2018 Critical milestones and responsibility as agreed to by the Parties: Milestone Date Responsible Party 1 Financial Security Posting Due Date May 25, 2017 Interconnection Customer 2 Completion of the Interconnection Facilities, Distribution Upgrades, and Network Upgrade facilities January 4, 2018 Distribution Provider & Interconnection Customer 3 In-Service Date (back-feed power) January 18, 2018 Distribution Provider & Interconnection Customer 4 Pre-parallel Inspection and Testing February 15, 2018 Distribution Provider & Interconnection Customer 5 Initial Synchronization February 15, 2018 Interconnection Customer 6 Provide written approval to Interconnection Customer for the operation of the facilities (PTO) and Commercial Operation Date (COD) March 1, 2018 Distribution Provider Note: Supplemental Billing and Payment Provisions: If financial security postings are required to fulfill this Small Generator Interconnection Agreement (SGIA) or its amendment, the Interconnection Customer will receive instructions for posting those financial securities from PG&E no later than 30 calendar days after PG&E has executed this document. In accordance with Article 6.3 of this project’s SGIA, the financial security posting(s) must be completed by the Interconnection Customer before the Distribution Provider may begin any capital work. The Interconnection Customer may negotiate a milestone date to post the financial security(-ies) up to 180 Calendar Days (CD) after the execution of this SGIA. This negotiated date is shown in the milestones table above. If the financial security posting(s) is/are not completed by the date shown in the table above, a notice of default will be issued to the Interconnection Customer in accordance with Article 7.6 of this SGIA.

Appears in 1 contract

Samples: Small Generator Interconnection Agreement

AutoNDA by SimpleDocs

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility -The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.

Appears in 1 contract

Samples: Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility -The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, Facilities and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment. Small Generating Facility: See Attachment 5 for a description of the generating facility. The Distribution Provider’s Interconnection Facilities, Network Upgrades and Distribution Upgrades described in this Attachment 2 to the SGIA are based on the Distribution Provider’s preliminary engineering and design. Such descriptions are subject to modification to reflect the actual facilities that are constructed and installed following the Distribution Provider’s final engineering and design, identification of field conditions, and compliance with applicable environmental and permitting requirements.

Appears in 1 contract

Samples: Service Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility -The Interconnection Customer's device for the production and/or storage for later injection of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment. Small Generating Facility: See Attachment 5 for a description of the generating facility. Distribution Provider’s Interconnection Facilities, Network Upgrades and Distribution Upgrades described in this Attachment 2 to the SGIA are based on the Distribution Provider’s preliminary engineering and design. Such descriptions are subject to modification to reflect the actual facilities that are constructed and installed following the Distribution Provider’s final engineering and design, identification of field conditions, and compliance with applicable environmental and permitting requirements. The Small Generating Facility will interconnect to the Distribution Provider’s Xxxxxx Substation utilizing certain Interconnection Facilities that will also be required for WDT394 Project, the WDT439 Project and the WDT603 Project, if such other generation projects proceed with their interconnections. Notwithstanding that some of the Distribution Provider’s Interconnection Facilities will be physically shared with the WDT394 Project, the WDT439 Project and the WDT603 Project, the Interconnection Customer has agreed to pay one hundred percent (100%) of the Interconnection Facilities Payment associated with such shared facilities, and to post one hundred percent (100%) of the associated securities described in Sections 10 and 11 of this Attachment 2.

Appears in 1 contract

Samples: Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERCthe Commission. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Distribution Provider or the ISO, ISO with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s Transmission System to accommodate the interconnection of the Small Generating Facility to the Distribution Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator CorporationOperator, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Transmission Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility – The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the – The Distribution Provider’s Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission distribution service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those facilities owned by the Distribution Provider that have been placed under the ISO’s operational control and are part of the ISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution System and Transmission System System, at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, Distribution Owner or the Distribution Transmission Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.. Attachment 3 One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades

Appears in 1 contract

Samples: Interconnection Agreement

Interconnection Handbook. A handbook, developed by the Distribution Provider and posted on the Distribution Provider’s 's website or otherwise made available by the Distribution Provider, describing the technical and operational requirements for wholesale generators and loads connected to the Distribution System, as such handbook may be modified or superseded from time to time. In the event of a conflict between the terms of this GIA SGIA and the terms of the Distribution Provider’s 's Interconnection Handbook, the terms in this GIA SGIA shall govern. Interconnection Request - The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Distribution Provider’s 's Distribution System. ISO Tariff - The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time, and accepted by FERC. Material Modification - A modification that has a material impact on the cost or timing of any Interconnection Request, Request or any other valid interconnection request to the Distribution Provider or the ISO, with a later queue priority date. Network Upgrades - Additions, modifications, and upgrades to the Distribution Provider's Transmission System required at or beyond the point at which the Distribution System connects to the Distribution Provider’s 's Transmission System to accommodate the interconnection of the Small Generating Facility to with the Distribution Provider’s 's Distribution System. Network Upgrades do not include Distribution Upgrades. Operating Requirements - Any operating and technical requirements that may be applicable due to Regional Transmission Organization, the California Independent System Operator Corporation, control area, or the Distribution Provider's requirements, including those set forth in the Small Generator Interconnection Agreement. Party or Parties - The Distribution Provider, Distribution Owner, Interconnection Customer or any combination of the above. Point of Interconnection - The point where the Interconnection Facilities connect with the Distribution Provider's Distribution System. Reasonable Efforts - With respect to an action required to be attempted or taken by a Party under the Small Generator Interconnection Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility — The Interconnection Customer's device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer's Interconnection Facilities. Tariff -the — The Distribution Provider's Wholesale Distribution Access Tariff, the Distribution Provider's Tariff through which open access transmission distribution service and Interconnection Service are offered, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Transmission System - Those — The facilities owned by the Distribution Provider that have been placed under the ISO’s CAISO's operational control and are part of the ISO CAISO Grid. Upgrades - The required additions and modifications to the Distribution Provider's Distribution Transmission System and Transmission Distribution System at or beyond the Point of Interconnection. Upgrades may be Network Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities. Attachment 2 Description and Costs of the Small Generating Facility, Interconnection Facilities, and Metering Equipment Equipment, including the Small Generating Facility, Interconnection Facilities, and metering equipment shall be itemized and identified as being owned by the Interconnection Customer, the Distribution Provider, or the Distribution Owner. The Distribution Provider will provide a best estimate itemized cost, including overheads, of its Interconnection Facilities and metering equipment, and a best estimate itemized cost of the annual operation and maintenance expenses associated with its Interconnection Facilities and metering equipment.. Attachment 3 One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades

Appears in 1 contract

Samples: Interconnection Agreement