Interconnected Transmission Owner. The Transmission Owner to whose transmission facilities or distribution facilities Customer Interconnection Facilities are, or as the case may be, a Customer Facility is, being directly connected. When used in an Interconnection Construction Service Agreement, the term may refer to a Transmission Owner whose facilities must be upgraded pursuant to the Facilities Study, but whose facilities are not directly interconnected with those of the Interconnection Customer.
AutoNDA by SimpleDocs
Interconnected Transmission Owner. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: Attachment Facilities:
Interconnected Transmission Owner. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: Attachment Facilities: • One (1) 115 kV, 2000A, 3-phase center break gang operated switches;
Interconnected Transmission Owner. Attachment Facilities: • One (1) 230 kV, 3000A, 3-phase center break gang operated switches;
Interconnected Transmission Owner. None. The Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: Non-Direct Connection Network Upgrades:
Interconnected Transmission Owner. The Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Transmission Owner Interconnection Facilities: Non-Direct Connection Network Upgrades: Atlanta 345-69 kV Substation:
Interconnected Transmission Owner. The Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnected Facilities: Non-Direct Connection Network Upgrades:
AutoNDA by SimpleDocs
Interconnected Transmission Owner. Under the superseded U4-014/V3-040 ISA, the following Transmission Owner Interconnection Facilities were installed: • Transmission Tap Poles in existing Hauto-Siegfried #1 and #4 69 kV lines • Relay equipment installation at Siegfried, Harwood, Hauto, and Ashfield substations. Under the U4-014/AC1-087 ISA, the following Transmission Owner Interconnection Facilities will be installed : • Relay Modifications at the Hauto 69 kV substation (PJM Network Upgrade Number n5904)
Interconnected Transmission Owner. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: Attachment Facilities:  One (1) 230 kV, 3000A center break switch;  Three (3) 230 kV metering accuracy capacitor voltage transformers;  Three (3) 230 kV metering accuracy current transformers;  Three (3) 180 kV station class arresters; and  Conductors, connectors, conduits, control cables, foundations, steel structures, and grounding. Direct Connection Network Upgrades: PJM Network Upgrade #n6695 – Build a three breaker AD1-033 230 kV switching station. The site is located along the 230kV line #271 from Xxxxxxxx and Landstown substations. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n6696 – Re-arrange line #271 to loop into and out of the new three breaker AD1-033 230 kV switching station between existing Xxxxxxxx and Landstown substations. PJM Network Upgrade #n6697 - Remote protection and communication work. Interconnected Transmission Owner protection requirements to reliably interconnect the proposed generating facility with the transmission system determined that work is required at Xxxxxxxx and Landstown substations.
Interconnected Transmission Owner. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: • New seventh position on the 69 kV six-position ring bus at the Xxxx Substation. • Replace the Preston to Xxxx 69 kV Line 6716 terminal disconnect switches with 2000 A switches. • Replace 600 A Disconnect Switch at the Xxxx Substation. • Install fiber optic cable in conduit to provide the communication channels to Interconnection Customer’s 69 kV breaker at the new switching station. • Consistent with Schedule C of this ISA, install metering control cable and meter cabinets. • Consistent with Schedule C of this ISA, complete secondary wiring connections at the metering enclosure. • Consistent with Schedule C of this ISA, provide, program, install, and own the primary and backup solid-state multi-function meters for the new metering position.